Free flooring change order template

A flooring change order for subfloor damage found under the old floor, more leveling than expected, added rooms or stairs, or a product change.

FreeNo email, no sign-up
3 linesFilled in for flooring
PDF, Word, CSVPrint or download
Your business
Logo
Kept in this browser for your next document. It is not uploaded.
Optional. Add it if your trade is licensed where you work.
Customer
Change order details
Line items
A credit for work taken out: type the quantity as a minus number.
DescriptionQtyUnitPrice
qty
$
qty
$
qty
$
$
%
Leave at 0 if your work is not taxed where you are.
Change total
$0.00
Change order, Change to flooring install
$0.00This change
$0.00Tax
3Lines to price
Kept in this browser only. Nothing you type here goes to Koira unless you tap Customize and send. The CSV opens in Google Sheets and Excel. In the print window, pick Save as PDF.
Your business name

Change order

Number
CO-1001
CustomerCustomer name
JobChange to flooring install
DescriptionQtyUnitPriceAmount
Replace soft subfloor by dishwasher16sq ft
Add hallway, luxury vinyl plank80sq ft
Credit: reuse baseboards, no new quarter round-240ft
This change
$0.00
Change total
$0.00
3 lines have no price yet
Reason for the change
Soft subfloor found under the old vinyl by the dishwasher; photos attached. Hallway added by the owner.
Terms
This change order amends the estimate. Due with the final payment.
Approved by (customer signature)
Contractor
Date

What a flooring change order is for

Pulling up an old floor shows what nobody could see: water damage at the toilet, a dip in the kitchen, tack strip glued in place. A change order with the finding, a photo and the price, signed before the new floor goes down, keeps the job honest and protects the floor's warranty.

What to put on a flooring change order

  • The original estimate.
  • What was found, with photos.
  • Added repairs, rooms or stairs.
  • Credits.
  • The new total.
  • Signature before installing over it.

A worked example

Under the old vinyl, the subfloor by the dishwasher is soft from a slow leak, and the owner adds the hallway. They decide to keep the old baseboards.

LineQtyUnitPrice
Replace soft subfloor by dishwasher16sq ftYour price
Add hallway, luxury vinyl plank80sq ftYour price
Credit: reuse baseboards, no new quarter round-240ftYour price

Sign this before installing over the repaired spot. A floor laid over soft subfloor fails, and the maker's warranty will not cover it.

Line items flooring installers use

Line itemUnitHow to write it
Luxury vinyl plank, installedsq ftProduct line, wear layer and click or glue-down.
Engineered hardwood, installedsq ftSpecies, width and floating, nail or glue.
Solid hardwood, installedsq ftSpecies, grade and finish.
Tile, installedsq ftTile size and pattern; tile itself an allowance or supplied.
Carpet and pad, installedsq ftCarpet line and pad weight.
Remove and haul old flooringsq ftCarpet, tile, vinyl or wood; glued floors take longer.
Subfloor levelingsq ftSelf-leveler or grinding where the floor is out of flat.
Underlaymentsq ftType and whether it is a vapor barrier.
Baseboard or quarter roundftRemove and reinstall, or new.
Transitions and thresholdseachWhere floors meet.
Stair treadseachPer step.
Move furnitureroomSay what you move and what the owner moves.
Sand and refinish hardwoodsq ftCoats and stain color.

Terms and deposit language for flooring

  • Deposit. A deposit at signing orders flooring, which often needs time to arrive and acclimate. Check your state's rules on deposits.
  • Payment. Balance due when the floor is installed and trim is done.
  • Warranty. Products carry the maker's warranty, which may require proper installation and moisture limits. State how long you warrant your installation.
  • Subfloor condition is checked after removal; repairs or leveling found are priced by change order.
  • Material quantities include a waste allowance; leftover boxes stay with the customer.
  • Doors may need trimming for new floor heights; say who does it.

How to fill it in

  1. Put in the original estimate number and amount.
  2. Write what changed in the reason box, plainly.
  3. Add the new work; type a minus quantity for any credit.
  4. Fill in the days added.
  5. Print it for a signature on site, or send it from Koira to sign by phone.

Free tools for flooring

The same change order for other trades: appliance repair, auto detailing, carpentry, carpet cleaning, chimney, house cleaning, commercial cleaning, concrete, deck, drywall, duct cleaning, electrical, fence, garage door, general contractor, glass, gutter, handyman, holiday lighting, home inspection, hood cleaning, hvac, insulation, irrigation, junk removal, landscaping, lawn care, locksmith, masonry, moving, painting, pest control, plumbing, pool service, pressure washing, property maintenance, remodeling, restoration, roofing, security system, septic, siding, snow removal, solar, tile, tree service, water treatment, waterproofing, window cleaning, window and door.

For flooring installersA template covers one document. Koira handles the rest of the office side: quotes, invoices, booking, follow ups and your website, in one place.Koira for flooring installers

Shane Allen writes Koira's guides for trade business owners. How we check our numbers.

FAQ

When does a flooring job need a change order?

When removal reveals subfloor damage, more leveling is needed, rooms or stairs are added, or the product changes. Sign it before installing.

Why not install over a soft subfloor?

The new floor will flex, gap or crack, and flooring warranties usually require a sound, flat subfloor. Fix it first.

How do I price subfloor repair?

By the area replaced, with labor and materials, and photos of the damage. Showing the customer the soft spot makes the signature quick.

Can a change order reduce the price?

Yes. Enter a minus quantity for dropped items like new trim and the total updates. The customer sees what was added and what was saved on one page.

We know what works. Leave it to Koira.

☼⚙
Standard⚡ Turbo
● Koira did it● You by hand
Today $9,300$8,100 / $1,200
This week $25,050$18,570 / $6,480
This month $69,300$46,150 / $23,150
Money, just now
Reminded Sean Love, $1,850. Polite reminder with the pay link.
Bids, 9:44 am
Nudged Dana on the kitchen bid. Day 3 follow up. Dana opened it at 9:12.
Convos, 9:41 am
Texted back a missed call. Walk through booked Thu 10:00.