Free roofing change order template

A roofing change order for the things you find once the old roof is off: rotted decking, a second layer, bad flashing. Price it, get it signed on site, and keep the job moving.

FreeNo email, no sign-up
3 linesFilled in for roofing
PDF, Word, CSVPrint or download
Your business
Logo
Kept in this browser for your next document. It is not uploaded.
Optional. Add it if your trade is licensed where you work.
Customer
Change order details
Line items
A credit for work taken out: type the quantity as a minus number.
DescriptionQtyUnitPrice
qty
$
qty
$
qty
$
$
%
Leave at 0 if your work is not taxed where you are.
Change total
$0.00
Change order, Change to reroof scope
$0.00This change
$0.00Tax
3Lines to price
Kept in this browser only. Nothing you type here goes to Koira unless you tap Customize and send. The CSV opens in Google Sheets and Excel. In the print window, pick Save as PDF.
Your business name

Change order

Number
CO-1001
CustomerCustomer name
JobChange to reroof scope
DescriptionQtyUnitPriceAmount
Tear off second layer, back slope8square
Replace rotted decking, per sheet6each
Extra disposal weight1each
This change
$0.00
Change total
$0.00
3 lines have no price yet
Reason for the change
Photos of the second layer and the soft decking are attached. Work continues once this is signed.
Terms
This change order becomes part of the original agreement. The added amount is due with the final balance.
Approved by (customer signature)
Contractor
Date

What a roofing change order is for

Most roofing disputes come from work found after tear-off and done without a signature. A one-page change order fixes that: what you found, what it costs, what it does to the schedule, signed before the crew goes on. Take a photo of the problem and put the change order number on the final invoice.

What to put on a roofing change order

  • The original estimate number and its total.
  • What was found and where, in plain words, with a photo if you can.
  • Each added item with its quantity and price, and any credit for work no longer needed.
  • The new contract total after the change.
  • Days added to the schedule, if any.
  • The homeowner's signature and date before the extra work starts.

A worked example

At tear-off the crew finds a second layer of shingles on the back slope and six soft sheets of decking. The homeowner is home and walks the roof photos with the foreman. Put the original estimate total in the Original amount box.

LineQtyUnitPrice
Tear off second layer, back slope8squareYour price
Replace rotted decking, per sheet6eachYour price
Extra disposal weight1eachYour price

The change order shows the original total, the added work and the new total, so the customer never has to do the math. If the decking price matches the per-sheet price on the estimate, say so; it makes the signature easy.

Line items roofers use

Line itemUnitHow to write it
Tear off existing shingles and haul awaysquareSay how many layers. A second layer is more labor and more dump weight.
Architectural asphalt shingles, installedsquareName the brand, line and color so the customer knows what they are getting.
Synthetic underlaymentsquareCovers the whole deck under the shingles.
Ice and water shield at eaves and valleysftMeasured along the eaves and valleys, or by the roll.
Drip edgeftEaves and rakes. Pick the color to match the gutters or fascia.
Starter stripftAlong the eaves and rakes, under the first course.
Ridge cap shinglesftAlong every ridge and hip.
Ridge ventftOnly where the attic has intake at the soffits to match it.
Replace rotted roof deckingeachPer sheet of plywood or OSB. Price it per sheet up front; you only know the count after tear-off.
Pipe boots and vent flashingeachCount every plumbing vent and exhaust that comes through the roof.
Step and counter flashing at walls and chimneyftSay whether you reuse or replace it.
Dumpster and disposaleachOne line, or fold it into tear-off. Do not count it twice.
Permit and inspectioneachPass the city's fee through at cost, or say it is included.
Roof repair laborhourFor leak calls and small repairs, priced by the hour plus materials.

Terms and deposit language for roofing

  • Deposit. A deposit is due when the customer signs, so the shingles and underlayment can be ordered and the job put on the calendar. Some states cap how much you can take up front on home improvement work, so check yours before you set it.
  • Payment. The balance is due when the roof is finished and the yard is cleaned up. If the customer is paying through an insurance claim, say who pays the deductible and when the insurance check is signed over.
  • Warranty. Say two things separately: the shingle maker's warranty on the material, and your own warranty on the workmanship, with how many years each runs and what voids it.
  • Rotted decking found at tear-off is replaced at the per-sheet price on the estimate, and the customer is shown the boards before you close them up.
  • Weather can move the start date. Say how you will tell the customer and that a tarp goes on any open section at the end of each day.
  • Say who handles the permit and who is home for the inspection.

How to fill it in

  1. Put in the original estimate number and amount.
  2. Write what changed in the reason box, plainly.
  3. Add the new work; type a minus quantity for any credit.
  4. Fill in the days added.
  5. Print it for a signature on site, or send it from Koira to sign by phone.

Free tools for roofing

The same change order for other trades: appliance repair, auto detailing, carpet cleaning, chimney, house cleaning, commercial cleaning, concrete, drywall, electrical, fence, flooring, garage door, general contractor, gutter, handyman, hvac, irrigation, junk removal, landscaping, lawn care, locksmith, moving, painting, pest control, plumbing, pool service, pressure washing, remodeling, septic, snow removal, solar, tree service, waterproofing, window cleaning.

More for roofers: how roofers run on Koira.

FAQ

When does a roofer need a change order?

Any time the work or the price changes from the signed estimate: a hidden second layer, more rotted decking than expected, a chimney that needs new flashing, or a customer who changes the shingle color after it is ordered. Get it signed before the extra work, not after.

Do I need a change order if the decking price was on the estimate?

It is still wise. The estimate set the price per sheet; the change order records how many sheets and that the homeowner agreed. A short signed note now avoids a long argument at the final invoice.

Can a change order lower the price?

Yes. If the customer drops something, such as a skylight replacement, put it on the change order as a credit. The template lets you mark a line as a credit so it comes off the total.

What if the homeowner is not home when we find a problem?

Tarp the opening, take photos, and call. Send the change order by text or email for a signature before the extra work goes on. In Koira the customer can sign it on their phone from a link.

We know what works. Leave it to Koira.

☼⚙
Standard⚡ Turbo
● Koira did it● You by hand
Today $9,300$8,100 / $1,200
This week $25,050$18,570 / $6,480
This month $69,300$46,150 / $23,150
Money, just now
Reminded Sean Love, $1,850. Polite reminder with the pay link.
Bids, 9:44 am
Nudged Dana on the kitchen bid. Day 3 follow up. She opened it at 9:12.
Convos, 9:41 am
Texted back a missed call. Walk through booked Thu 10:00.
Free Roofing Change Order Template (PDF and Word) | Koira