Free appliance repair change order template

An appliance repair change order for when the first fix reveals a second fault, such as a new pump that exposes a leaking tub seal. Price the added work and get approval before ordering more parts.

FreeNo email, no sign-up
3 linesFilled in for appliance repair
PDF, Word, CSVPrint or download
Your business
Logo
Kept in this browser for your next document. It is not uploaded.
Optional. Add it if your trade is licensed where you work.
Customer
Change order details
Line items
A credit for work taken out: type the quantity as a minus number.
DescriptionQtyUnitPrice
qty
$
qty
$
qty
$
$
%
Leave at 0 if your work is not taxed where you are.
Change total
$0.00
Change order, Change to washer repair
$0.00This change
$0.00Tax
3Lines to price
Kept in this browser only. Nothing you type here goes to Koira unless you tap Customize and send. The CSV opens in Google Sheets and Excel. In the print window, pick Save as PDF.
Your business name

Change order

Number
CO-1001
CustomerCustomer name
JobChange to washer repair
DescriptionQtyUnitPriceAmount
Tub seal and bearing kit1each
Repair labor, bearing replacement3hour
Credit: inlet hoses not replaced-1each
This change
$0.00
Change total
$0.00
3 lines have no price yet
Reason for the change
Tub seal leaks and the bearing is worn, found on the test cycle after the pump repair.
Terms
Parts for this change are paid before ordering. Labor due when the repair is complete.
Approved by (customer signature)
Contractor
Date

What an appliance repair change order is for

Appliances hide second faults: you replace a control board and find the motor it was protecting has failed, or you clear a drain and find the tub bearing worn. Going ahead without asking leaves the customer with a bill bigger than they expected. A short change order with the new part and labor, signed before ordering, keeps it fair.

What to put on an appliance repair change order

  • The original estimate and its total.
  • The new fault and how you found it.
  • Added parts and labor, or credits.
  • The new total.
  • Customer approval before ordering more parts.

A worked example

After replacing the washer drain pump, the test cycle shows water leaking from the tub seal and the bearing is noisy. The customer agrees to the extra repair but wants to skip the new inlet hoses.

LineQtyUnitPrice
Tub seal and bearing kit1eachYour price
Repair labor, bearing replacement3hourYour price
Credit: inlet hoses not replaced-1eachYour price

A bearing job can approach replacement cost on an older washer. Say so in the notes and let the customer decide before you order the kit.

Line items appliance repair techs use

Line itemUnitHow to write it
Service call and diagnosiseachSay whether it is credited toward the repair if the customer goes ahead.
Repair laborhourOr a flat repair price from your price book.
Refrigerator compressor start relayeachBrand and part number on the line.
Washer drain pumpeachName the part and the model it fits.
Dryer heating element or ignitereachElectric element or gas igniter, by model.
Dishwasher control boardeachBoards are costly; say so before ordering.
Oven bake elementeachModel and wattage.
Door gasketeachRefrigerators, freezers and dishwashers.
Water inlet valveeachWashers, dishwashers and ice makers.
Dryer vent cleaningeachOften found as the cause of a slow dryer.
Return trip for ordered parteachSay whether the second trip is charged.
Appliance install, customer suppliedeachHookup, leveling and haul-away of the old unit if agreed.
Haul away old applianceeachWhen the customer replaces instead of repairing.

Terms and deposit language for appliance repair

  • Deposit. No deposit on most calls. When an expensive part must be ordered, such as a control board or a sealed system part, take payment for the part before ordering, since it often cannot be returned.
  • Payment. The service call is due at the first visit; the repair is due when the appliance works. If a part is ordered, say whether the service call is credited on the return trip.
  • Warranty. State how long your repair is covered, for labor and for the part you installed, and that it covers that repair only, not other failures in an older machine.
  • If the repair would cost a large share of a new appliance's price, you will say so before going ahead.
  • Appliances under the maker's warranty may need the maker's authorized service; say if you are not.
  • The customer clears access to the appliance and is present for the diagnosis.

How to fill it in

  1. Put in the original estimate number and amount.
  2. Write what changed in the reason box, plainly.
  3. Add the new work; type a minus quantity for any credit.
  4. Fill in the days added.
  5. Print it for a signature on site, or send it from Koira to sign by phone.

Free tools for appliance repair

The same change order for other trades: auto detailing, carpentry, carpet cleaning, chimney, house cleaning, commercial cleaning, concrete, deck, drywall, duct cleaning, electrical, fence, flooring, garage door, general contractor, glass, gutter, handyman, holiday lighting, home inspection, hood cleaning, hvac, insulation, irrigation, junk removal, landscaping, lawn care, locksmith, masonry, moving, painting, pest control, plumbing, pool service, pressure washing, property maintenance, remodeling, restoration, roofing, security system, septic, siding, snow removal, solar, tile, tree service, water treatment, waterproofing, window cleaning, window and door.

For appliance repair techsA template covers one document. Koira handles the rest of the office side: quotes, invoices, booking, follow ups and your website, in one place.Software for appliance repair businesses

Shane Allen writes Koira's guides for trade business owners. How we check our numbers.

FAQ

When does an appliance repair need a change order?

When you find a second fault or the customer changes the repair after approving the first estimate. Get approval before ordering additional parts.

How do I tell a customer about a second fault?

Show them, explain it in plain words, give the price, and remind them of the appliance's age. Then let them decide whether to go on or replace it.

Can I charge for the first repair if they decline the second?

Yes, the first repair was approved and done. Make that clear on the change order so there is no confusion.

How do credits work on this change order?

Enter a minus quantity on a line for work the customer drops, and the template takes it off the total.

We know what works. Leave it to Koira.

☼⚙
Standard⚡ Turbo
● Koira did it● You by hand
Today $9,300$8,100 / $1,200
This week $25,050$18,570 / $6,480
This month $69,300$46,150 / $23,150
Money, just now
Reminded Sean Love, $1,850. Polite reminder with the pay link.
Bids, 9:44 am
Nudged Dana on the kitchen bid. Day 3 follow up. Dana opened it at 9:12.
Convos, 9:41 am
Texted back a missed call. Walk through booked Thu 10:00.