What a restoration change order is for
Water travels. Readings on day two often show wet framing in a room that looked dry, or the source turns out to be a drain line, not a supply. A signed change order with readings and photos, before you open another wall, keeps the owner and the adjuster with you.
What to put on a restoration change order
- New readings and photos.
- Rooms or materials added.
- Change in water category.
- Added equipment days or visits.
- New total and signature.
A worked example
Day two readings show the bedroom wall next to the hall is wet, and the owner asks you to pack out the bedroom contents.
| Line | Qty | Unit | Price |
|---|---|---|---|
| Flood cut and remove wet drywall, bedroom | 14 | ft | Your price |
| Air mover, added to bedroom | 6 | day | Your price |
| Contents pack-out | 4 | hour | Your price |
Attach the readings that show the bedroom wall wet. Numbers settle the question faster than a description.
Line items restoration companies use
| Line item | Unit | How to write it |
|---|---|---|
| Emergency response and setup | each | After-hours call-out, inspection and moisture map. |
| Water extraction | sq ft | Category of water and surfaces extracted. |
| Air mover | day | Per unit per day on site. |
| Dehumidifier | day | Per unit per day on site. |
| Moisture monitoring visit | visit | Readings recorded each visit. |
| Flood cut and remove wet drywall | ft | Height of the cut and disposal. |
| Remove wet carpet and pad | sq ft | Carpet saved or discarded. |
| Antimicrobial application | sq ft | Product used on affected materials. |
| Containment for mold work | each | Poly walls, zipper door and negative air. |
| Air scrubber | day | HEPA filtration per unit per day. |
| Smoke and soot cleaning | sq ft | Walls, ceilings and contents areas. |
| Disposal | load | Debris and wet material hauled away. |
| Contents pack-out | hour | Packing, moving and storing belongings. |
Terms and deposit language for restoration
- Deposit. Emergency work starts without a deposit. Planned mold and rebuild work takes a deposit at signing, within your state's limits.
- Payment. Homeowner-paid work is due on completion. On insurance jobs, the owner is responsible for the deductible and anything the carrier does not pay.
- Warranty. You stand behind drying to the goals in your moisture log and mold removal to clearance where testing is part of the job. Cause of loss, like a failed pipe, is the owner's or a plumber's to fix.
- Equipment days are counted from setup to pickup, by unit.
- Moisture readings and photos are kept for every visit and shared with the owner or adjuster.
- Rebuild after drying is a separate estimate.
How to fill it in
- Put in the original estimate number and amount.
- Write what changed in the reason box, plainly.
- Add the new work; type a minus quantity for any credit.
- Fill in the days added.
- Print it for a signature on site, or send it from Koira to sign by phone.
Free tools for restoration
- Water damage restoration cost calculator
- Mold remediation cost calculator
- Basement waterproofing cost calculator
- Labor rate calculator
The same change order for other trades: appliance repair, auto detailing, carpentry, carpet cleaning, chimney, house cleaning, commercial cleaning, concrete, deck, drywall, duct cleaning, electrical, fence, flooring, garage door, general contractor, glass, gutter, handyman, holiday lighting, home inspection, hood cleaning, hvac, insulation, irrigation, junk removal, landscaping, lawn care, locksmith, masonry, moving, painting, pest control, plumbing, pool service, pressure washing, property maintenance, remodeling, roofing, security system, septic, siding, snow removal, solar, tile, tree service, water treatment, waterproofing, window cleaning, window and door.
More for restoration companies: how restoration companies run on Koira.
Shane Allen writes Koira's guides for trade business owners. How we check our numbers.