Free auto detailing change order template

An auto detailing change order for a vehicle in worse shape than described, added services at drop-off, or a customer who downgrades the package.

FreeNo email, no sign-up
3 linesFilled in for auto detailing
PDF, Word, CSVPrint or download
Your business
Logo
Kept in this browser for your next document. It is not uploaded.
Optional. Add it if your trade is licensed where you work.
Customer
Change order details
Line items
A credit for work taken out: type the quantity as a minus number.
DescriptionQtyUnitPrice
qty
$
qty
$
qty
$
$
%
Leave at 0 if your work is not taxed where you are.
Change total
$0.00
Change order, Change to detail
$0.00This change
$0.00Tax
3Lines to price
Kept in this browser only. Nothing you type here goes to Koira unless you tap Customize and send. The CSV opens in Google Sheets and Excel. In the print window, pick Save as PDF.
Your business name

Change order

Number
CO-1001
CustomerCustomer name
JobChange to detail
DescriptionQtyUnitPriceAmount
Tree sap removal1each
Heavy sand extraction, carpets1each
Credit: headlight restoration not done-1set
This change
$0.00
Change total
$0.00
3 lines have no price yet
Reason for the change
Vehicle condition at drop-off was heavier than described; photos attached.
Terms
Changes are due at pickup.
Approved by (customer signature)
Contractor
Date

What an auto detailing change order is for

Customers describe their car as a little dirty and arrive with sand in every seam, mold in the trunk or sap all over the paint. A change order before you start the extra work keeps pickup friendly. It works the other way too, when a customer decides to skip the coating.

What to put on an auto detailing change order

  • The original package and price.
  • What was found or requested.
  • Added lines and credits.
  • The new total.
  • Approval before the extra work.

A worked example

At drop-off the SUV has tree sap across the roof and sand packed into the carpets. The owner skips headlight restoration.

LineQtyUnitPrice
Tree sap removal1eachYour price
Heavy sand extraction, carpets1eachYour price
Credit: headlight restoration not done-1setYour price

Photos of the sap and sand with the change order make the extra charge easy to accept.

Line items detailers use

Line itemUnitHow to write it
Exterior hand wash and dryeachWheels, tires and door jambs.
Interior vacuum and wipe-downeachSeats, carpets, dash and console.
Full detail, sedaneachInside and out.
Full detail, SUV or truckeachLarger vehicles take longer.
Clay bar decontaminationeachBefore polish or protection.
One-step polisheachLight swirl removal and gloss.
Paint correction, multi-stephourPriced by time after inspection.
Ceramic coatingeachName the product and the durability it claims.
Carpet and seat shampooeachHot water extraction of fabric.
Leather clean and conditioneachSeats and trim.
Pet hair removaleachSurcharge for heavy hair.
Headlight restorationsetBoth headlights.
Engine bay cleaningeachLow pressure with covered electrics.
Mobile service feeeachIf you charge to come to the customer.

Terms and deposit language for auto detailing

  • Deposit. Coatings and paint correction often take a deposit to hold the day. Washes and standard details usually do not.
  • Payment. Due when the vehicle is handed back, after the customer has looked it over.
  • Warranty. Coating durability claims come from the maker and depend on upkeep; say what you stand behind and what voids it.
  • Some scratches, stains and odors cannot be fully removed; say so before you start.
  • Remove valuables from the vehicle; you are not responsible for items left inside.
  • Mobile jobs need water and power access or a fee for bringing your own.

How to fill it in

  1. Put in the original estimate number and amount.
  2. Write what changed in the reason box, plainly.
  3. Add the new work; type a minus quantity for any credit.
  4. Fill in the days added.
  5. Print it for a signature on site, or send it from Koira to sign by phone.

Free tools for auto detailing

The same change order for other trades: appliance repair, carpentry, carpet cleaning, chimney, house cleaning, commercial cleaning, concrete, deck, drywall, duct cleaning, electrical, fence, flooring, garage door, general contractor, glass, gutter, handyman, holiday lighting, home inspection, hood cleaning, hvac, insulation, irrigation, junk removal, landscaping, lawn care, locksmith, masonry, moving, painting, pest control, plumbing, pool service, pressure washing, property maintenance, remodeling, restoration, roofing, security system, septic, siding, snow removal, solar, tile, tree service, water treatment, waterproofing, window cleaning, window and door.

More for detailers: how detailers run on Koira.

For auto detailersA template covers one document. Koira handles the rest of the office side: quotes, invoices, booking, follow ups and your website, in one place.Auto detailing software

Shane Allen writes Koira's guides for trade business owners. How we check our numbers.

FAQ

When does a detail need a change order?

When the vehicle is in much worse condition than described, or the customer adds or drops services. Get approval before the extra work.

How do I charge for a filthy vehicle?

Add condition lines like heavy sand, mold or sap, with photos, and get approval before starting. Without the photos, the extra charge looks like you are padding the bill.

Can a customer downgrade at drop-off?

Yes. Show the dropped service as a credit with a minus quantity and the total updates. It keeps the paperwork honest when the customer changes their mind at the counter.

How do I get approval from a customer who left?

Text photos and the change order. From Koira they can approve on a link. You can keep working on the parts they already approved while you wait.

We know what works. Leave it to Koira.

☼⚙
Standard⚡ Turbo
● Koira did it● You by hand
Today $9,300$8,100 / $1,200
This week $25,050$18,570 / $6,480
This month $69,300$46,150 / $23,150
Money, just now
Reminded Sean Love, $1,850. Polite reminder with the pay link.
Bids, 9:44 am
Nudged Dana on the kitchen bid. Day 3 follow up. Dana opened it at 9:12.
Convos, 9:41 am
Texted back a missed call. Walk through booked Thu 10:00.