Free handyman change order template

A handyman change order for the small job that turns bigger once opened: rot behind the caulk, a door frame that needs rebuilding, or added items on the day.

FreeNo email, no sign-up
3 linesFilled in for handyman
PDF, Word, CSVPrint or download
Your business
Logo
Kept in this browser for your next document. It is not uploaded.
Optional. Add it if your trade is licensed where you work.
Customer
Change order details
Line items
A credit for work taken out: type the quantity as a minus number.
DescriptionQtyUnitPrice
qty
$
qty
$
qty
$
$
%
Leave at 0 if your work is not taxed where you are.
Change total
$0.00
Change order, Change to handyman job
$0.00This change
$0.00Tax
3Lines to price
Kept in this browser only. Nothing you type here goes to Koira unless you tap Customize and send. The CSV opens in Google Sheets and Excel. In the print window, pick Save as PDF.
Your business name

Change order

Number
CO-1001
CustomerCustomer name
JobChange to handyman job
DescriptionQtyUnitPriceAmount
Cut out and replace soft drywall at tub edge1each
Replace smoke detectors3each
Credit: bookcase assembly not done-1each
This change
$0.00
Change total
$0.00
3 lines have no price yet
Reason for the change
Drywall behind the tub edge was soft from water; shown to the customer.
Terms
Added work is due with the rest of the job.
Approved by (customer signature)
Contractor
Date

What a handyman change order is for

Handyman jobs are small until they are not: you pull the old caulk and find soft drywall, you rehang a door and the frame is split. Stopping to write the change and get a yes keeps the customer on your side. It also stops you working an extra two hours for free.

What to put on a handyman change order

  • The original price.
  • What was found or added.
  • Added lines and credits.
  • The new total.
  • Customer approval before continuing.

A worked example

Removing the old tub caulk shows soft drywall behind the tile edge. The customer also adds a smoke detector swap and skips the bookcase.

LineQtyUnitPrice
Cut out and replace soft drywall at tub edge1eachYour price
Replace smoke detectors3eachYour price
Credit: bookcase assembly not done-1eachYour price

The soft drywall line has a note that it was found behind the caulk. Customers sign quickly when the reason is right there.

Line items handymen use

Line itemUnitHow to write it
Handyman laborhourYour hourly rate, with a minimum visit.
Minimum service visiteachCovers the trip and the first block of time.
Drywall patch, smalleachHoles up to a size you set; paint match extra.
Mount TV on walleachCustomer supplies the mount, or you do.
Hang pictures, shelves or mirrorseachPer item.
Replace interior dooreachPre-hung or slab; paint extra.
Adjust or rehang dooreachSticking, sagging or not latching.
Assemble furnitureeachPer piece; large pieces more.
Caulk tub or showereachRemove old caulk and recaulk.
Replace light fixture, like for likeeachWhere your license allows; customer supplied.
Install grab barseachInto blocking or with proper anchors.
Gutter cleaning, single storyftA common add-on.
Materials and supplieseachAt cost plus your markup, with receipts on request.
Haul away debrisloadSmall loads from the job.

Terms and deposit language for handyman

  • Deposit. No deposit on small jobs. Larger projects with materials to buy may take one to cover them.
  • Payment. Due on completion. Materials at cost plus markup, or as quoted.
  • Warranty. State how long you stand behind your work and that customer-supplied items are covered for installation only.
  • Work that requires a licensed trade in your state, such as larger electrical or plumbing jobs, is referred out or done by a licensed partner.
  • A minimum visit charge applies to every trip.
  • If a quick fix turns into a bigger repair once opened, you stop and price it first.

How to fill it in

  1. Put in the original estimate number and amount.
  2. Write what changed in the reason box, plainly.
  3. Add the new work; type a minus quantity for any credit.
  4. Fill in the days added.
  5. Print it for a signature on site, or send it from Koira to sign by phone.

Free tools for handyman

The same change order for other trades: appliance repair, auto detailing, carpentry, carpet cleaning, chimney, house cleaning, commercial cleaning, concrete, deck, drywall, duct cleaning, electrical, fence, flooring, garage door, general contractor, glass, gutter, holiday lighting, home inspection, hood cleaning, hvac, insulation, irrigation, junk removal, landscaping, lawn care, locksmith, masonry, moving, painting, pest control, plumbing, pool service, pressure washing, property maintenance, remodeling, restoration, roofing, security system, septic, siding, snow removal, solar, tile, tree service, water treatment, waterproofing, window cleaning, window and door.

More for handymen: how handymen run on Koira.

For handymenA template covers one document. Koira handles the rest of the office side: quotes, invoices, booking, follow ups and your website, in one place.Koira for handymen

Shane Allen writes Koira's guides for trade business owners. How we check our numbers.

FAQ

Does a handyman need change orders?

For anything that changes the price after you quoted, a quick written yes protects you. It can be on your phone.

What if a small fix turns into a big one?

Stop, show the customer, and price the bigger fix. They can approve it, or you finish the small fix as quoted.

Can I credit dropped items?

Yes. Type a minus quantity and the template subtracts it from the change total. The customer sees what was added and what was dropped on one page.

How do I get approval quickly?

Show them in person, or text a photo with the change order. A change order sent from Koira can be approved by the customer from a link on their phone, even from work.

We know what works. Leave it to Koira.

☼⚙
Standard⚡ Turbo
● Koira did it● You by hand
Today $9,300$8,100 / $1,200
This week $25,050$18,570 / $6,480
This month $69,300$46,150 / $23,150
Money, just now
Reminded Sean Love, $1,850. Polite reminder with the pay link.
Bids, 9:44 am
Nudged Dana on the kitchen bid. Day 3 follow up. Dana opened it at 9:12.
Convos, 9:41 am
Texted back a missed call. Walk through booked Thu 10:00.