Free plumbing change order template

A plumbing change order for the hidden problems that show up once the wall is open: a rotted subfloor under the toilet, galvanized pipe that crumbles, or a vent that was never tied in.

FreeNo email, no sign-up
3 linesFilled in for plumbing
PDF, Word, CSVPrint or download
Your business
Logo
Kept in this browser for your next document. It is not uploaded.
Optional. Add it if your trade is licensed where you work.
Customer
Change order details
Line items
A credit for work taken out: type the quantity as a minus number.
DescriptionQtyUnitPrice
qty
$
qty
$
qty
$
$
%
Leave at 0 if your work is not taxed where you are.
Change total
$0.00
Change order, Change to bathroom rough-in
$0.00This change
$0.00Tax
3Lines to price
Kept in this browser only. Nothing you type here goes to Koira unless you tap Customize and send. The CSV opens in Google Sheets and Excel. In the print window, pick Save as PDF.
Your business name

Change order

Number
CO-1001
CustomerCustomer name
JobChange to bathroom rough-in
DescriptionQtyUnitPriceAmount
Replace galvanized supply back to main with PEX22ft
Cut out and replace subfloor at toilet flange1each
Credit: tub removal and new tub drain-1each
This change
$0.00
Change total
$0.00
3 lines have no price yet
Reason for the change
Galvanized supply was corroded beyond the planned tie-in point. Subfloor at the flange is soft from an old leak. Photos attached.
Terms
Approved changes become part of the original contract. The change amount is added to the final payment.
Approved by (customer signature)
Contractor
Date

What a plumbing change order is for

Plumbers open walls and floors for a living, and what is behind them is rarely what the estimate assumed. A change order turns a surprise into a decision: here is what we found, here is what it costs to fix properly, here is what it does to the schedule. Signed before the extra work, it keeps the relationship and the final payment intact.

What to put on a plumbing change order

  • The original estimate number and amount.
  • What was found, where, and a photo if possible.
  • Added lines for the fix, and any credit for work no longer needed.
  • The new total and any days added.
  • Whether an inspection has to be rescheduled.
  • The customer's signature before you proceed.

A worked example

During a bathroom rough-in the crew finds the old galvanized supply crumbling past where the estimate planned to tie in, and the subfloor under the toilet flange is soft. The customer also decides to keep the existing tub.

LineQtyUnitPrice
Replace galvanized supply back to main with PEX22ftYour price
Cut out and replace subfloor at toilet flange1eachYour price
Credit: tub removal and new tub drain-1eachYour price

The credit line has a minus quantity, so the change total nets the added work against the tub that stays. If the rough-in inspection has to move, put the days in the Days added box.

Line items plumbers use

Line itemUnitHow to write it
Service call and diagnosiseachThe trip and the first part of the visit, before any repair is agreed.
Water heater, tank, installedeachGallons, fuel type and the brand, plus whether the venting changes.
Expansion tankeachOften required with a new heater on a closed system; check local code.
Drain cleaning, main lineeachSay where you cleaned from: a cleanout, a pulled toilet or the roof vent.
Camera inspection of sewer lineeachSay whether the customer gets the video.
Replace toilet fill valve and flappereachThe common running-toilet fix, priced as one repair.
Replace faucet, customer suppliedeachSay who supplied the faucet; it changes who stands behind it.
Replace shutoff valveeachAngle stops under sinks and toilets, or the main shutoff.
Repipe with PEXftBy the foot, or by fixture if that is how you price it.
Garbage disposal, installedeachHorsepower and whether the old one is hauled away.
Sump pump, replacedeachInclude the check valve if you replace it too.
Wall or ceiling opening and patcheachSay whether you patch, or leave it open for a drywall finisher.
PermiteachWater heaters and repipes often need one; pass it through at cost or include it.
Plumbing laborhourHourly labor for work you cannot price flat.

Terms and deposit language for plumbing

  • Deposit. Most repair calls take no deposit; the customer pays when the leak is fixed. On repipes, remodel rough-ins and sewer work, a deposit at signing covers the material order and the schedule slot. Check your state's rules on deposits.
  • Payment. Repairs are due on completion. Larger jobs split into a deposit, a payment at rough-in or inspection, and the balance at final.
  • Warranty. Say how long you stand behind your labor, and that parts carry the manufacturer's warranty. If the customer supplied a fixture, say your warranty covers the install only.
  • Old pipe can break when you touch it; say what happens if a valve or fitting fails when you open the system.
  • Openings in walls or ceilings are cut where needed and patched rough unless the estimate says finished drywall.
  • Drain clearing does not fix a broken pipe; if the camera shows one, the repair is quoted separately.

How to fill it in

  1. Put in the original estimate number and amount.
  2. Write what changed in the reason box, plainly.
  3. Add the new work; type a minus quantity for any credit.
  4. Fill in the days added.
  5. Print it for a signature on site, or send it from Koira to sign by phone.

Free tools for plumbing

The same change order for other trades: appliance repair, auto detailing, carpet cleaning, chimney, house cleaning, commercial cleaning, concrete, drywall, electrical, fence, flooring, garage door, general contractor, gutter, handyman, hvac, irrigation, junk removal, landscaping, lawn care, locksmith, moving, painting, pest control, pool service, pressure washing, remodeling, roofing, septic, snow removal, solar, tree service, waterproofing, window cleaning.

More for plumbers: how plumbers run on Koira.

FAQ

When does a plumber need a change order?

When hidden conditions or customer requests change the scope or price: corroded pipe beyond the plan, rot, a missing vent, moving a fixture, or changing a fixture after the order. Get it signed before doing the extra work.

How do I explain hidden pipe problems to a customer?

Show them, or send a photo, and say in plain words what would happen if you tied new pipe into the old: leaks, low pressure, or a failed inspection. Customers sign when they see it.

Does a change order affect the plumbing inspection?

It can. If the change adds work the inspector needs to see, say so and give the new timeline. Put the days added on the change order so the customer is not surprised.

Can I add a credit on a plumbing change order?

Yes. Type a minus quantity on the line for work you no longer do, and the template takes it off the change total.

We know what works. Leave it to Koira.

☼⚙
Standard⚡ Turbo
● Koira did it● You by hand
Today $9,300$8,100 / $1,200
This week $25,050$18,570 / $6,480
This month $69,300$46,150 / $23,150
Money, just now
Reminded Sean Love, $1,850. Polite reminder with the pay link.
Bids, 9:44 am
Nudged Dana on the kitchen bid. Day 3 follow up. She opened it at 9:12.
Convos, 9:41 am
Texted back a missed call. Walk through booked Thu 10:00.
Free Plumbing Change Order Template (PDF and Word) | Koira