Free snow removal change order template

A snow removal change order for added areas, a switch from per push to seasonal, hauling when piles run out of room, or roof snow added mid-winter.

FreeNo email, no sign-up
3 linesFilled in for snow removal
PDF, Word, CSVPrint or download
Your business
Logo
Kept in this browser for your next document. It is not uploaded.
Optional. Add it if your trade is licensed where you work.
Customer
Change order details
Line items
A credit for work taken out: type the quantity as a minus number.
DescriptionQtyUnitPrice
qty
$
qty
$
qty
$
$
%
Leave at 0 if your work is not taxed where you are.
Change total
$0.00
Change order, Change to snow service
$0.00This change
$0.00Tax
3Lines to price
Kept in this browser only. Nothing you type here goes to Koira unless you tap Customize and send. The CSV opens in Google Sheets and Excel. In the print window, pick Save as PDF.
Your business name

Change order

Number
CO-1001
CustomerCustomer name
JobChange to snow service
DescriptionQtyUnitPriceAmount
Snow relocation and hauling2load
Back patio path shoveling, rest of season1each
Credit: driveway salting dropped-1each
This change
$0.00
Change total
$0.00
3 lines have no price yet
Reason for the change
Hauling after the storm on the date noted. Patio path added from the next storm.
Terms
Changes apply from the date stated.
Approved by (customer signature)
Contractor
Date

What a snow removal change order is for

Winters change plans: the customer adds the back patio, a big storm leaves nowhere to pile snow, or they switch to seasonal after an expensive January. A written change with the new price keeps billing straight through a season where you have little time for paperwork.

What to put on a snow removal change order

  • The current plan and price.
  • What is added or changed.
  • Added lines and credits.
  • The new price and when it starts.
  • Customer approval.

A worked example

After a big storm there is nowhere left to pile snow, so it needs hauling. The customer adds the back patio path and drops salting on the drive.

LineQtyUnitPrice
Snow relocation and hauling2loadYour price
Back patio path shoveling, rest of season1eachYour price
Credit: driveway salting dropped-1eachYour price

Hauling is a one-time charge; the patio path runs the rest of the season. Say both in the notes so the next bill makes sense.

Line items snow removal companies use

Line itemUnitHow to write it
Driveway plowing, per pushvisitEach time you plow; say the trigger depth.
Seasonal plowing contracteachUnlimited or capped pushes for a flat price.
Walkway and steps shovelingvisitBy hand or snowblower.
Salt or ice melt applicationvisitProduct and whether it is pet safe.
Sidewalk clearing, city walkftSome cities require it within a time after snowfall.
Commercial lot plowingvisitBy lot size and trigger.
Snow relocation or haulingloadWhen there is nowhere left to pile it.
Roof snow removalhourFrom the ground or roof, with safety gear.
Ice dam steaminghourSteam, not chipping.
Snow stakes installeachMarks edges before the first snow.
Damage repair allowanceeachTurf or edge damage from plowing, repaired in spring.

Terms and deposit language for snow removal

  • Deposit. Seasonal contracts are often paid up front or in monthly installments; per-push customers may keep a card on file.
  • Payment. Seasonal: up front or monthly. Per push: billed after each storm or monthly.
  • Warranty. Not a warranty trade. Say how you handle turf, edge or mailbox damage from plows, and how to report it.
  • Service starts at the trigger depth stated; drifting and blowing snow may need extra visits.
  • Plowing order depends on the route; say the target time after snowfall ends.
  • Ice can form after service; ice melt reduces but does not remove slip risk.

How to fill it in

  1. Put in the original estimate number and amount.
  2. Write what changed in the reason box, plainly.
  3. Add the new work; type a minus quantity for any credit.
  4. Fill in the days added.
  5. Print it for a signature on site, or send it from Koira to sign by phone.

Free tools for snow removal

The same change order for other trades: appliance repair, auto detailing, carpentry, carpet cleaning, chimney, house cleaning, commercial cleaning, concrete, deck, drywall, duct cleaning, electrical, fence, flooring, garage door, general contractor, glass, gutter, handyman, holiday lighting, home inspection, hood cleaning, hvac, insulation, irrigation, junk removal, landscaping, lawn care, locksmith, masonry, moving, painting, pest control, plumbing, pool service, pressure washing, property maintenance, remodeling, restoration, roofing, security system, septic, siding, solar, tile, tree service, water treatment, waterproofing, window cleaning, window and door.

For snow removal companiesA template covers one document. Koira handles the rest of the office side: quotes, invoices, booking, follow ups and your website, in one place.Snow removal software

Shane Allen writes Koira's guides for trade business owners. How we check our numbers.

FAQ

When does snow service need a change order?

When areas are added, hauling is needed, the plan changes, or services are dropped mid-season. Write it down even when you are exhausted; the bill comes later.

How do I price snow hauling?

By the load or the hour with the truck and loader, since it takes equipment beyond a plow.

Can a customer switch to seasonal mid-winter?

If you allow it, write the new price for the rest of the season on a change order.

Can I credit dropped services?

Yes. A minus quantity takes the dropped service off the change total. The customer sees the new work and the dropped service on one page.

We know what works. Leave it to Koira.

☼⚙
Standard⚡ Turbo
● Koira did it● You by hand
Today $9,300$8,100 / $1,200
This week $25,050$18,570 / $6,480
This month $69,300$46,150 / $23,150
Money, just now
Reminded Sean Love, $1,850. Polite reminder with the pay link.
Bids, 9:44 am
Nudged Dana on the kitchen bid. Day 3 follow up. Dana opened it at 9:12.
Convos, 9:41 am
Texted back a missed call. Walk through booked Thu 10:00.