Free landscaping change order template

A landscaping change order for rock and roots found while digging, a bigger patio, extra plants, or drainage the customer did not know they needed.

FreeNo email, no sign-up
3 linesFilled in for landscaping
PDF, Word, CSVPrint or download
Your business
Logo
Kept in this browser for your next document. It is not uploaded.
Optional. Add it if your trade is licensed where you work.
Customer
Change order details
Line items
A credit for work taken out: type the quantity as a minus number.
DescriptionQtyUnitPrice
qty
$
qty
$
qty
$
$
%
Leave at 0 if your work is not taxed where you are.
Change total
$0.00
Change order, Change to patio install
$0.00This change
$0.00Tax
3Lines to price
Kept in this browser only. Nothing you type here goes to Koira unless you tap Customize and send. The CSV opens in Google Sheets and Excel. In the print window, pick Save as PDF.
Your business name

Change order

Number
CO-1001
CustomerCustomer name
JobChange to patio install
DescriptionQtyUnitPriceAmount
Break out and haul away buried concrete1load
Enlarge patio60sq ft
Credit: path lights removed-6each
This change
$0.00
Change total
$0.00
3 lines have no price yet
Reason for the change
Buried concrete found at excavation; photos attached. Patio enlarged and lighting dropped at the customer's request.
Terms
This change order becomes part of the agreement. The amount is due with the final payment.
Approved by (customer signature)
Contractor
Date

What a landscaping change order is for

Digging reveals what was invisible at the estimate: buried concrete, a tree root mat, soil that will not drain. Customers also expand plans once they see the work start. A change order with the reason, the cost and the time added keeps the project and the payment schedule clean.

What to put on a landscaping change order

  • Original estimate and amount.
  • What was found or requested.
  • Added lines and credits.
  • New total and days added.
  • Customer signature first.

A worked example

Excavating for the patio, the crew hits an old buried concrete slab. The customer also asks to make the patio larger and drop the path lights.

LineQtyUnitPrice
Break out and haul away buried concrete1loadYour price
Enlarge patio60sq ftYour price
Credit: path lights removed-6eachYour price

Keep the found condition and the customer's request on separate lines, with the reason in the notes. One was unknown, the other was a choice.

Line items landscapers use

Line itemUnitHow to write it
Remove existing plants and turfsq ftSay whether debris is hauled away.
Bed edging, steel or stoneftMaterial and height of the edge.
Shrubs, installedeachContainer size and variety, with a guarantee period if you give one.
Trees, installedeachCaliper or container size, staking, and who waters.
Perennials and groundcovereachFlat or pot size.
Soil amendment or compostcu ydTilled in before planting.
Mulch, delivered and spreadcu ydType and depth.
Sod, installedsq ftGrass type, plus grading and starter fertilizer.
Paver patiosq ftPaver style, base depth and edge restraint.
Retaining wall blocksq ftFace area, with drainage stone and fabric behind it.
Drainage, French drain or dry creekftPipe, stone and fabric; where it discharges.
Landscape lighting fixtureseachFixture type and transformer.
Grading and soilhourMachine or hand grading.
Utility locateeachCall before you dig; say that it is done before work starts.

Terms and deposit language for landscaping

  • Deposit. Install and hardscape jobs take a deposit at signing to order plants, stone and block and hold the crew. Some states limit deposits on landscape and home improvement contracts, so look yours up.
  • Payment. Progress payments on larger hardscape jobs at set stages, with the balance due when the work is complete and walked with the customer.
  • Warranty. Plant guarantees usually depend on proper watering, so say who waters and for how long. Hardscape workmanship is covered separately, for a stated period.
  • Underground utilities are located before digging; private lines such as irrigation or lighting the locate service does not mark are not your responsibility unless the customer flags them.
  • Plant substitutions of equal size and value may be made if a variety is unavailable, with the customer told first.
  • Equipment access may mark the lawn; say how ruts are repaired.

How to fill it in

  1. Put in the original estimate number and amount.
  2. Write what changed in the reason box, plainly.
  3. Add the new work; type a minus quantity for any credit.
  4. Fill in the days added.
  5. Print it for a signature on site, or send it from Koira to sign by phone.

Free tools for landscaping

The same change order for other trades: appliance repair, auto detailing, carpentry, carpet cleaning, chimney, house cleaning, commercial cleaning, concrete, deck, drywall, duct cleaning, electrical, fence, flooring, garage door, general contractor, glass, gutter, handyman, holiday lighting, home inspection, hood cleaning, hvac, insulation, irrigation, junk removal, lawn care, locksmith, masonry, moving, painting, pest control, plumbing, pool service, pressure washing, property maintenance, remodeling, restoration, roofing, security system, septic, siding, snow removal, solar, tile, tree service, water treatment, waterproofing, window cleaning, window and door.

More for landscapers: how landscapers run on Koira.

For landscapersA template covers one document. Koira handles the rest of the office side: quotes, invoices, booking, follow ups and your website, in one place.Software for landscaping businesses

Shane Allen writes Koira's guides for trade business owners. How we check our numbers.

FAQ

When do landscapers need a change order?

When digging finds buried debris, rock or roots, when drainage needs change, or when the customer adds, removes or upsizes part of the job.

How do I price buried debris removal?

By the load or the hour, with equipment and disposal. Show a photo and get a signature before breaking it out.

Does a change order affect the plant guarantee?

Only if it changes what is planted. New plants added by change order carry the same guarantee and watering terms.

Can the change order remove items?

Yes. Type a minus quantity on the work the customer drops, such as lights or a bed, and it comes off the change total so the new contract price is right on the page.

We know what works. Leave it to Koira.

☼⚙
Standard⚡ Turbo
● Koira did it● You by hand
Today $9,300$8,100 / $1,200
This week $25,050$18,570 / $6,480
This month $69,300$46,150 / $23,150
Money, just now
Reminded Sean Love, $1,850. Polite reminder with the pay link.
Bids, 9:44 am
Nudged Dana on the kitchen bid. Day 3 follow up. Dana opened it at 9:12.
Convos, 9:41 am
Texted back a missed call. Walk through booked Thu 10:00.