What a duct cleaning change order is for
Surprises in duct cleaning come out of the ducts: a nest, a crushed flex run, a second air handler in the attic. Showing the owner a photo and getting a signature on the extra work before you do it keeps trust in a trade where trust is everything.
What to put on a duct cleaning change order
- What was found, with a photo.
- Added work and its price.
- Credits for skipped items.
- The new total.
- Owner's OK before the work.
A worked example
The tech finds a second air handler in the attic and a crushed dryer duct behind the machine. The owner skips the filter.
| Line | Qty | Unit | Price |
|---|---|---|---|
| Second system, attic air handler | 1 | each | Your price |
| Replace crushed dryer duct with metal | 1 | each | Your price |
| Credit: furnace filter | -1 | each | Your price |
Show the photo before you price the extra. In this trade, the owner needs to see it.
Line items duct cleaners use
| Line item | Unit | How to write it |
|---|---|---|
| Air duct cleaning, whole system | each | Home size, supply and return runs. |
| Supply vent | each | Per register, if priced by the vent. |
| Return vent | each | Per return grille. |
| Main trunk lines | ft | Accessible trunk runs cleaned. |
| Dryer vent cleaning | each | Where the vent exits and run length. |
| Dryer vent bird guard | each | Cap guard installed. |
| Blower and coil cleaning | each | Only where your license and training allow. |
| Access holes cut and sealed | each | Patched with approved covers. |
| Before and after camera inspection | each | Photos or video for the owner. |
| Furnace filter | each | Size and rating. |
| Dryer vent reroute | each | Shorter, straighter run in metal duct. |
Terms and deposit language for duct cleaning
- Deposit. No deposit on standard cleanings. Reroutes and larger systems take a deposit when booked, within your state's rules.
- Payment. Due when the cleaning is finished and the before and after photos are shown.
- Warranty. You stand behind the cleaning of what you could reach, shown in the photos. Duct damage that was there before, and parts of the system not accessible, are left out.
- Photos before and after are part of every cleaning.
- Mold claims are shown to the owner, not just described.
- Gas dryers are reconnected and checked for leaks before you leave.
How to fill it in
- Put in the original estimate number and amount.
- Write what changed in the reason box, plainly.
- Add the new work; type a minus quantity for any credit.
- Fill in the days added.
- Print it for a signature on site, or send it from Koira to sign by phone.
Free tools for duct cleaning
- Air duct cleaning cost calculator
- Dryer vent cleaning cost calculator
- Labor rate calculator
- Maintenance plan pricing calculator
The same change order for other trades: appliance repair, auto detailing, carpentry, carpet cleaning, chimney, house cleaning, commercial cleaning, concrete, deck, drywall, electrical, fence, flooring, garage door, general contractor, glass, gutter, handyman, holiday lighting, home inspection, hood cleaning, hvac, insulation, irrigation, junk removal, landscaping, lawn care, locksmith, masonry, moving, painting, pest control, plumbing, pool service, pressure washing, property maintenance, remodeling, restoration, roofing, security system, septic, siding, snow removal, solar, tile, tree service, water treatment, waterproofing, window cleaning, window and door.
More for duct cleaners: how duct cleaners run on Koira.
Shane Allen writes Koira's guides for trade business owners. How we check our numbers.