Free property maintenance change order template

A property maintenance change order for a work order that grows past the approval limit, an added service, or a turnover scope that changes.

FreeNo email, no sign-up
3 linesFilled in for property maintenance
PDF, Word, CSVPrint or download
Your business
Logo
Kept in this browser for your next document. It is not uploaded.
Optional. Add it if your trade is licensed where you work.
Customer
Change order details
Line items
A credit for work taken out: type the quantity as a minus number.
DescriptionQtyUnitPrice
qty
$
qty
$
qty
$
$
%
Leave at 0 if your work is not taxed where you are.
Change total
$0.00
Change order, Change to unit turnover
$0.00This change
$0.00Tax
3Lines to price
Kept in this browser only. Nothing you type here goes to Koira unless you tap Customize and send. The CSV opens in Google Sheets and Excel. In the print window, pick Save as PDF.
Your business name

Change order

Number
CO-1001
CustomerCustomer name
JobChange to unit turnover
DescriptionQtyUnitPriceAmount
Subfloor repair under sink, 2A6sq ft
Blinds, supplied and installed4each
Credit: light fixture-1each
This change
$0.00
Change total
$0.00
3 lines have no price yet
Reason for the change
Soft subfloor under the kitchen sink in 2A; photos attached. Blinds added by manager.
Terms
This change order amends the turnover scope. Billed with the turnover.
Approved by (customer signature)
Contractor
Date

What a property maintenance change order is for

A small work order turns into a bigger job when the tech opens the cabinet and finds the leak has rotted the floor. The approval limit says call first; a signed change order is how the manager approves it with the price and photos, so the owner is not surprised by the invoice.

What to put on a property maintenance change order

  • Original work order or scope.
  • What was found, with photos.
  • Added work and parts.
  • New total against the approval limit.
  • Manager's signature.

A worked example

A turnover in unit 2A finds a soft subfloor under the sink, the manager adds new blinds, and keeps the old light fixture.

LineQtyUnitPrice
Subfloor repair under sink, 2A6sq ftYour price
Blinds, supplied and installed4eachYour price
Credit: light fixture-1eachYour price

Send the photos with the change order. Managers approve faster when they can forward the pictures to the owner.

Line items property maintenance companies use

Line itemUnitHow to write it
Monthly walkthroughvisitCommon areas, exterior and the punch list.
Work order laborhourBilled by the hour with a minimum.
Unit turnover, paint and repairseachPer unit; scope in the note.
HVAC filter changeseachPer unit, filter size.
Smoke and CO detector checkeachTest and battery swap per unit.
Light bulbs and fixtureseachCommon area lighting.
Gutter cleaningftPer foot of gutter.
Grounds care visitvisitMowing, trimming and litter.
Snow and ice, per visitvisitWalks and entries.
Parts and materialseachAt cost plus your markup.
After-hours calleachEmergency rate and minimum.
Trip chargeeachFor work orders outside a scheduled visit.

Terms and deposit language for property maintenance

  • Deposit. No deposit on monthly plans. Turnovers and projects over the plan limit take a deposit when approved, within your state's limits.
  • Payment. Monthly plans are billed at the start of each month. Work orders are billed when completed.
  • Warranty. You stand behind your repairs for the time stated. Licensed trade work is done by licensed trades and warranted by them.
  • Work over the approval limit in this agreement needs the manager's OK first.
  • Plumbing, electrical and gas work beyond small repairs goes to licensed trades.
  • Tenant access is arranged by the property manager with proper notice.

How to fill it in

  1. Put in the original estimate number and amount.
  2. Write what changed in the reason box, plainly.
  3. Add the new work; type a minus quantity for any credit.
  4. Fill in the days added.
  5. Print it for a signature on site, or send it from Koira to sign by phone.

Free tools for property maintenance

The same change order for other trades: appliance repair, auto detailing, carpentry, carpet cleaning, chimney, house cleaning, commercial cleaning, concrete, deck, drywall, duct cleaning, electrical, fence, flooring, garage door, general contractor, glass, gutter, handyman, holiday lighting, home inspection, hood cleaning, hvac, insulation, irrigation, junk removal, landscaping, lawn care, locksmith, masonry, moving, painting, pest control, plumbing, pool service, pressure washing, remodeling, restoration, roofing, security system, septic, siding, snow removal, solar, tile, tree service, water treatment, waterproofing, window cleaning, window and door.

More for property maintenance companies: how property maintenance companies run on Koira.

For property maintenance companiesA template covers one document. Koira handles the rest of the office side: quotes, invoices, booking, follow ups and your website, in one place.See how property maintenance companies use Koira

Shane Allen writes Koira's guides for trade business owners. How we check our numbers.

FAQ

When does property maintenance need a change order?

When a job goes over the approval limit, the turnover scope changes, or the manager adds or drops a service.

How does the approval limit work with change orders?

Work under the limit is done on the spot. Over it, send a change order with photos and wait for the manager's signature.

What if the manager is slow to approve?

Make the area safe, note the time you sent the change order, and move to the next job until it is signed.

How do I credit something the manager drops?

Enter the dropped item as a credit with a minus quantity, and the turnover change order total goes down for the manager to sign.

We know what works. Leave it to Koira.

☼⚙
Standard⚡ Turbo
● Koira did it● You by hand
Today $9,300$8,100 / $1,200
This week $25,050$18,570 / $6,480
This month $69,300$46,150 / $23,150
Money, just now
Reminded Sean Love, $1,850. Polite reminder with the pay link.
Bids, 9:44 am
Nudged Dana on the kitchen bid. Day 3 follow up. Dana opened it at 9:12.
Convos, 9:41 am
Texted back a missed call. Walk through booked Thu 10:00.