Free moving change order template

A moving change order for items added on move day, a second stop, packing not done by the customer, or a change of date.

FreeNo email, no sign-up
3 linesFilled in for moving
PDF, Word, CSVPrint or download
Your business
Logo
Kept in this browser for your next document. It is not uploaded.
Optional. Add it if your trade is licensed where you work.
Customer
Change order details
Line items
A credit for work taken out: type the quantity as a minus number.
DescriptionQtyUnitPrice
qty
$
qty
$
qty
$
$
%
Leave at 0 if your work is not taxed where you are.
Change total
$0.00
Change order, Change to move
$0.00This change
$0.00Tax
3Lines to price
Kept in this browser only. Nothing you type here goes to Koira unless you tap Customize and send. The CSV opens in Google Sheets and Excel. In the print window, pick Save as PDF.
Your business name

Change order

Number
CO-1001
CustomerCustomer name
JobChange to move
DescriptionQtyUnitPriceAmount
Packing labor, bedrooms not packed3hour
Second stop, storage unit1each
Credit: patio set not moved-1each
This change
$0.00
Change total
$0.00
3 lines have no price yet
Reason for the change
Bedrooms were not packed on arrival. Storage unit stop added by the customer.
Terms
Changes added to the balance due at the end of the move.
Approved by (customer signature)
Contractor
Date

What a moving change order is for

Moves change on the day: the customer has not finished packing, adds a storage unit stop, or remembers the garage shelving. Writing the change down before doing it, with the added time and cost, keeps the end-of-day bill from becoming a fight. It also gives the crew lead a clear reason when the day runs long.

What to put on a moving change order

  • The original estimate.
  • What was added or changed.
  • Added time, stops or materials.
  • Credits.
  • Approval before the extra work.

A worked example

On move day the bedrooms are not packed, the customer adds a stop at a storage unit, and decides to leave the patio set.

LineQtyUnitPrice
Packing labor, bedrooms not packed3hourYour price
Second stop, storage unit1eachYour price
Credit: patio set not moved-1eachYour price

Get the signature before the crew starts packing. An unpacked house is the most common reason a move runs long.

Line items moving companies use

Line itemUnitHow to write it
Movers and truckhourCrew size and truck size; say when the clock starts.
Travel time or trip feeeachTime from your yard to the first stop and back.
Packing laborhourFull or partial packing.
Boxes and packing materialseachBy box size or as a bundle.
Furniture disassembly and reassemblyeachBeds, tables, cribs.
Piano or safe moveeachSpecialty items with their own price.
Stairs or long carryeachWalk-ups and long walks from truck to door.
Mattress bags and furniture padseachProtection for the move.
Storage, per monthmonthIf you hold items between homes.
Junk haul-awayloadItems left behind or not wanted.
Valuation coverageeachThe level of liability you accept for damaged items; explain the options.
UnpackinghourAt the new home.

Terms and deposit language for moving

  • Deposit. A booking deposit holds the date and crew, especially on weekends and month ends.
  • Payment. Balance due at the end of the move, before the truck leaves the new home.
  • Warranty. State the liability coverage you provide for damage, how claims are made and by when. Explain the options plainly before the move.
  • Hourly moves bill from the time stated to the time stated; say whether travel and breaks count.
  • Valuables, cash, jewelry, medicine and hazardous items are moved by the customer.
  • Interstate moves are governed by federal rules and need different paperwork; this template is for local moves.

How to fill it in

  1. Put in the original estimate number and amount.
  2. Write what changed in the reason box, plainly.
  3. Add the new work; type a minus quantity for any credit.
  4. Fill in the days added.
  5. Print it for a signature on site, or send it from Koira to sign by phone.

Free tools for moving

The same change order for other trades: appliance repair, auto detailing, carpentry, carpet cleaning, chimney, house cleaning, commercial cleaning, concrete, deck, drywall, duct cleaning, electrical, fence, flooring, garage door, general contractor, glass, gutter, handyman, holiday lighting, home inspection, hood cleaning, hvac, insulation, irrigation, junk removal, landscaping, lawn care, locksmith, masonry, painting, pest control, plumbing, pool service, pressure washing, property maintenance, remodeling, restoration, roofing, security system, septic, siding, snow removal, solar, tile, tree service, water treatment, waterproofing, window cleaning, window and door.

For moversA template covers one document. Koira handles the rest of the office side: quotes, invoices, booking, follow ups and your website, in one place.See how movers use Koira

Shane Allen writes Koira's guides for trade business owners. How we check our numbers.

FAQ

When does a move need a change order?

When the customer adds items, stops or packing, or drops part of the job. Write it before the extra work.

What if the customer has not packed?

Offer packing at your rate on a change order, with materials. Get a yes before starting. Bring extra boxes on every move for exactly this reason.

How do I charge for a second stop?

As a flat stop fee or added time, said on the change order. A storage unit stop adds loading and unloading, not just driving.

Can a change order reduce the move price?

Yes. Dropped items go on as credits with a minus quantity. The customer sees what was added and what was left behind on one page.

We know what works. Leave it to Koira.

☼⚙
Standard⚡ Turbo
● Koira did it● You by hand
Today $9,300$8,100 / $1,200
This week $25,050$18,570 / $6,480
This month $69,300$46,150 / $23,150
Money, just now
Reminded Sean Love, $1,850. Polite reminder with the pay link.
Bids, 9:44 am
Nudged Dana on the kitchen bid. Day 3 follow up. Dana opened it at 9:12.
Convos, 9:41 am
Texted back a missed call. Walk through booked Thu 10:00.