Free carpentry change order template

A carpentry change order for added shelves, extra doors, a swing changed after delivery or trim that grows into another room.

FreeNo email, no sign-up
3 linesFilled in for carpentry
PDF, Word, CSVPrint or download
Your business
Logo
Kept in this browser for your next document. It is not uploaded.
Optional. Add it if your trade is licensed where you work.
Customer
Change order details
Line items
A credit for work taken out: type the quantity as a minus number.
DescriptionQtyUnitPrice
qty
$
qty
$
qty
$
$
%
Leave at 0 if your work is not taxed where you are.
Change total
$0.00
Change order, Change to kitchen and dining room
$0.00This change
$0.00Tax
3Lines to price
Kept in this browser only. Nothing you type here goes to Koira unless you tap Customize and send. The CSV opens in Google Sheets and Excel. In the print window, pick Save as PDF.
Your business name

Change order

Number
CO-1001
CustomerCustomer name
JobChange to kitchen and dining room
DescriptionQtyUnitPriceAmount
Install crown molding, hallway22ft
Microwave shelf with trim1each
Credit: pantry door not replaced-1each
This change
$0.00
Change total
$0.00
3 lines have no price yet
Reason for the change
Hallway crown and microwave shelf added by owner. Pantry door kept.
Terms
This change order amends the estimate. Due with the final payment.
Approved by (customer signature)
Contractor
Date

What a carpentry change order is for

Carpentry changes come in small pieces: a filler here, a shelf there, crown into the hallway since you are already set up. Each one is minutes to agree and hours to build. A signed change order for each keeps the invoice clean and gives the owner a moment to decide whether the hallway really needs it.

What to put on a carpentry change order

  • What changed and who asked.
  • Added pieces or footage.
  • Credits for anything dropped.
  • New total.
  • Signature before the cut.

A worked example

The owner adds crown to the hallway, wants a microwave shelf, and decides to keep the old door in the pantry.

LineQtyUnitPrice
Install crown molding, hallway22ftYour price
Microwave shelf with trim1eachYour price
Credit: pantry door not replaced-1eachYour price

Sign before you cut. A hallway of crown is easy to agree and hard to argue about after it is up.

Line items carpenters use

Line itemUnitHow to write it
Install crown moldingftProfile, paint or stain grade, and inside and outside corners.
Install baseboardftHeight and whether shoe molding is included.
Door casing, both sideseachPer door; casing profile and head detail.
Hang interior door, prehungeachSwing, size and hardware.
Install kitchen cabinetsftLinear feet of run; uppers and bases counted once.
Cabinet hardwareeachPulls and knobs, drilled from a template.
Built-in shelvingftShelf depth, material and finish.
Wainscoting or panel moldingsq ftStyle and height on the wall.
Window casing and stooleachPer window; apron and stool style.
Material, paint-grade trimftFrom your supplier with markup.
Fill, caulk and prep for painthourSay whether painting is yours or the painter's.
Haul away old trim and doorsloadDisposal of what comes out.

Terms and deposit language for carpentry

  • Deposit. A deposit at signing pays for the trim, doors or cabinet hardware ordered for this house. Deposit limits for home improvement work are set by each state, so check yours.
  • Payment. Balance due when the punch list is walked and signed off, or in stages on larger jobs.
  • Warranty. Stand behind joints that open from poor fastening and doors that will not latch because of the install. Seasonal movement in wood and gaps from house settling are not install defects.
  • Old houses are rarely square; scribing and shimming are part of the price shown.
  • Painting, stain and touch-up are listed when they are included, and are the owner's or painter's otherwise.
  • Cabinets and doors supplied by the owner are checked for damage at delivery, not at install.

How to fill it in

  1. Put in the original estimate number and amount.
  2. Write what changed in the reason box, plainly.
  3. Add the new work; type a minus quantity for any credit.
  4. Fill in the days added.
  5. Print it for a signature on site, or send it from Koira to sign by phone.

Free tools for carpentry

The same change order for other trades: appliance repair, auto detailing, carpet cleaning, chimney, house cleaning, commercial cleaning, concrete, deck, drywall, duct cleaning, electrical, fence, flooring, garage door, general contractor, glass, gutter, handyman, holiday lighting, home inspection, hood cleaning, hvac, insulation, irrigation, junk removal, landscaping, lawn care, locksmith, masonry, moving, painting, pest control, plumbing, pool service, pressure washing, property maintenance, remodeling, restoration, roofing, security system, septic, siding, snow removal, solar, tile, tree service, water treatment, waterproofing, window cleaning, window and door.

More for carpenters: how carpenters run on Koira.

FAQ

When does carpentry work need a change order?

When the owner adds rooms, pieces or shelves, changes a swing after doors arrive, or drops an item. Get the signature before you cut.

Is a text approval enough?

It is better than nothing, but a signed change order with the new total is clearer and goes straight onto the invoice.

How do I credit a door that is not replaced?

Enter it as a credit line with a minus quantity, and the change order total drops by that line.

What if a delivered door has the wrong swing?

Write up the fix and who pays for it before you rehang it, especially when the swing was the owner's choice.

We know what works. Leave it to Koira.

☼⚙
Standard⚡ Turbo
● Koira did it● You by hand
Today $9,300$8,100 / $1,200
This week $25,050$18,570 / $6,480
This month $69,300$46,150 / $23,150
Money, just now
Reminded Sean Love, $1,850. Polite reminder with the pay link.
Bids, 9:44 am
Nudged Dana on the kitchen bid. Day 3 follow up. She opened it at 9:12.
Convos, 9:41 am
Texted back a missed call. Walk through booked Thu 10:00.
Free Carpentry Change Order Template (PDF and Word) | Koira