Free carpentry work order template

A carpentry work order for the crew: rooms, trim profiles, door swings, cabinet layout, fasteners and what the owner asked for on the walkthrough.

FreeNo email, no sign-up
4 linesFilled in for carpentry
PDF, Word, CSVPrint or download
Your business
Logo
Kept in this browser for your next document. It is not uploaded.
Optional. Add it if your trade is licensed where you work.
Customer and site
Work order details
Tasks and materials
DescriptionQtyUnit
qty
qty
qty
qty
lines on this work order
4
Work order, Install kitchen cabinets and trim out the dining room
$0.00Subtotal
$0.00Tax
4Lines to price
Kept in this browser only. Nothing you type here goes to Koira unless you tap Customize and send. The CSV opens in Google Sheets and Excel. In the print window, pick Save as PDF.
Your business name

Work order

Number
WO-1001
Customer and siteCustomer name
JobInstall kitchen cabinets and trim out the dining room
DescriptionQtyUnit
Set base cabinets level, start at the corner14ft
Hang uppers, 18 inches above counter line11ft
Crown, dining room, stop at archway48ft
Pulls at 3 inches from door edge32each
Site notes
Floors are new oak; cover with board before any cabinets come in. Owner wants crown to stop at the archway.
Instructions
Check the cabinet order against the layout before unboxing. Photograph boxes as delivered.
Work done as written (crew lead)
Customer
Date

What a carpentry work order is for

Most carpentry callbacks come from a detail lost between the walkthrough and the install: the wrong door swing, a pull at the wrong height, crown that should have stopped at the archway. A work order with the layout drawing, profiles, swings and the owner's requests keeps the crew building what was sold.

What to put on a carpentry work order

  • Rooms and runs, with a layout sketch.
  • Trim profiles and paint or stain grade.
  • Door swings and hardware heights.
  • Cabinet order and filler locations.
  • Fasteners, adhesive and finish notes.
  • Protection for floors and counters.

A worked example

Install day for the kitchen and dining room. Prices are hidden.

LineQtyUnitPrice
Set base cabinets level, start at the corner14ftYour price
Hang uppers, 18 inches above counter line11ftYour price
Crown, dining room, stop at archway48ftYour price
Pulls at 3 inches from door edge32eachYour price

Put the layout drawing and the pull template in site notes. Those two details cause most cabinet callbacks.

Line items carpenters use

Line itemUnitHow to write it
Install crown moldingftProfile, paint or stain grade, and inside and outside corners.
Install baseboardftHeight and whether shoe molding is included.
Door casing, both sideseachPer door; casing profile and head detail.
Hang interior door, prehungeachSwing, size and hardware.
Install kitchen cabinetsftLinear feet of run; uppers and bases counted once.
Cabinet hardwareeachPulls and knobs, drilled from a template.
Built-in shelvingftShelf depth, material and finish.
Wainscoting or panel moldingsq ftStyle and height on the wall.
Window casing and stooleachPer window; apron and stool style.
Material, paint-grade trimftFrom your supplier with markup.
Fill, caulk and prep for painthourSay whether painting is yours or the painter's.
Haul away old trim and doorsloadDisposal of what comes out.

How to fill it in

  1. Fill in the customer, the site and the date.
  2. Add who is assigned, the arrival window and access.
  3. List the tasks and materials in the order the crew will need them.
  4. Put gate codes, pets and anything to protect in the site notes.
  5. Print it for the truck or send it to the crew's phone as a PDF.

Free tools for carpentry

The same work order for other trades: appliance repair, auto detailing, carpet cleaning, chimney, house cleaning, commercial cleaning, concrete, deck, drywall, duct cleaning, electrical, fence, flooring, garage door, general contractor, glass, gutter, handyman, holiday lighting, home inspection, hood cleaning, hvac, insulation, irrigation, junk removal, landscaping, lawn care, locksmith, masonry, moving, painting, pest control, plumbing, pool service, pressure washing, property maintenance, remodeling, restoration, roofing, security system, septic, siding, snow removal, solar, tile, tree service, water treatment, waterproofing, window cleaning, window and door.

More for carpenters: how carpenters run on Koira.

FAQ

What goes on a carpentry work order?

Rooms and runs with a sketch, trim profiles, door swings, hardware heights, cabinet order, fillers, fasteners and how to protect finished floors.

Why include hardware heights?

Because pull placement is a matter of taste, and redrilling a cabinet door is not possible. Write the height the owner chose.

Should the crew check the cabinet order?

Yes. Matching the delivered boxes to the layout before anything is unboxed catches wrong sizes and finishes while they can still go back to the supplier.

Do carpentry crews need to see prices?

No. Keep prices off the crew copy and keep the page about runs, swings and the owner's requests.

We know what works. Leave it to Koira.

☼⚙
Standard⚡ Turbo
● Koira did it● You by hand
Today $9,300$8,100 / $1,200
This week $25,050$18,570 / $6,480
This month $69,300$46,150 / $23,150
Money, just now
Reminded Sean Love, $1,850. Polite reminder with the pay link.
Bids, 9:44 am
Nudged Dana on the kitchen bid. Day 3 follow up. She opened it at 9:12.
Convos, 9:41 am
Texted back a missed call. Walk through booked Thu 10:00.
Free Carpentry Work Order Template (PDF and Word) | Koira