Free window and door work order template

A window and door work order for install day: each opening by room, unit size and swing, capping color, trim, and what to protect.

FreeNo email, no sign-up
4 linesFilled in for window and door
PDF, Word, CSVPrint or download
Your business
Logo
Kept in this browser for your next document. It is not uploaded.
Optional. Add it if your trade is licensed where you work.
Customer and site
Work order details
Tasks and materials
DescriptionQtyUnit
qty
qty
qty
qty
lines on this work order
4
Work order, Replace ten windows and the front door
$0.00Subtotal
$0.00Tax
4Lines to price
Kept in this browser only. Nothing you type here goes to Koira unless you tap Customize and send. The CSV opens in Google Sheets and Excel. In the print window, pick Save as PDF.
Your business name

Work order

Number
WO-1001
Customer and siteCustomer name
JobReplace ten windows and the front door
DescriptionQtyUnit
Living room, three units 34 x 583each
Bedrooms, five units 30 x 545each
Kitchen and bath, two units2each
Front door, left-hand inswing1each
Site notes
House built in 1962; follow lead-safe setup at every opening. Dog stays in the back yard.
Instructions
Check each unit size against the opening before removing the old one. Photograph each opening before and after.
Work done as written (crew lead)
Customer
Date

What a window and door work order is for

Ten windows in seven rooms is ten chances to set a unit in the wrong opening. A work order that maps every unit to its room and size, with swing, capping color and interior trim, lets the crew check each box against the list before the old window comes out.

What to put on a window and door work order

  • Opening map by room and size.
  • Door swing and hardware.
  • Capping color and trim profile.
  • Lead-safe practices on older homes.
  • Furniture and floors to protect.

A worked example

Install day for all ten windows and the front door, with the crew copy showing no prices.

LineQtyUnitPrice
Living room, three units 34 x 583eachYour price
Bedrooms, five units 30 x 545eachYour price
Kitchen and bath, two units2eachYour price
Front door, left-hand inswing1eachYour price

Label each box with its room before it leaves the shop. The work order then matches the boxes on the lawn.

Line items window and door installers use

Line itemUnitHow to write it
Replacement window, insert installeachSize, frame material, glass package and grid.
Replacement window, full frameeachTear-out to the rough opening; new trim inside and out.
Entry door, prehungeachSlab material, glass, sidelites and hardware.
Storm dooreachStyle and closer.
Sliding patio dooreachWidth, panels and screen.
Interior door, prehungeachSwing and casing.
Exterior capping, aluminumeachPer opening; color to match.
Interior trim and stooleachPer opening; paint or stain grade.
Sill and frame rot repairftPriced if found when the old unit comes out.
Egress window and welleachCutting, well and code requirements; permit.
Disposal of old unitseachPer opening.
PermiteachWhere the town requires one.

How to fill it in

  1. Fill in the customer, the site and the date.
  2. Add who is assigned, the arrival window and access.
  3. List the tasks and materials in the order the crew will need them.
  4. Put gate codes, pets and anything to protect in the site notes.
  5. Print it for the truck or send it to the crew's phone as a PDF.

Free tools for window and door

The same work order for other trades: appliance repair, auto detailing, carpentry, carpet cleaning, chimney, house cleaning, commercial cleaning, concrete, deck, drywall, duct cleaning, electrical, fence, flooring, garage door, general contractor, glass, gutter, handyman, holiday lighting, home inspection, hood cleaning, hvac, insulation, irrigation, junk removal, landscaping, lawn care, locksmith, masonry, moving, painting, pest control, plumbing, pool service, pressure washing, property maintenance, remodeling, restoration, roofing, security system, septic, siding, snow removal, solar, tile, tree service, water treatment, waterproofing, window cleaning.

More for window and door installers: how window and door installers run on Koira.

FAQ

What goes on a window install work order?

A map of every opening by room with unit size, door swing, capping color, trim, lead-safe notes and what to protect inside.

Why map units to rooms?

Similar sizes get swapped on a busy day. A map and labeled boxes keep every unit in the opening it was measured for.

Should the work order mention lead-safe practices?

On homes built before 1978, yes. The crew sets up containment at each opening, and the work order is where they read it.

Does the window crew need prices?

No. The crew copy hides prices and keeps the page to openings, sizes, swings, capping colors and how to protect the floors and furniture inside.

We know what works. Leave it to Koira.

☼⚙
Standard⚡ Turbo
● Koira did it● You by hand
Today $9,300$8,100 / $1,200
This week $25,050$18,570 / $6,480
This month $69,300$46,150 / $23,150
Money, just now
Reminded Sean Love, $1,850. Polite reminder with the pay link.
Bids, 9:44 am
Nudged Dana on the kitchen bid. Day 3 follow up. She opened it at 9:12.
Convos, 9:41 am
Texted back a missed call. Walk through booked Thu 10:00.
Free Window and Door Work Order Template (PDF and Word) | Koira