Free concrete work order template

A concrete work order for the crew: area and thickness, forms and grade, base, reinforcement, joints, finish, pour time and truck access.

FreeNo email, no sign-up
5 linesFilled in for concrete
PDF, Word, CSVPrint or download
Your business
Logo
Kept in this browser for your next document. It is not uploaded.
Optional. Add it if your trade is licensed where you work.
Customer and site
Work order details
Tasks and materials
DescriptionQtyUnit
qty
qty
qty
qty
qty
lines on this work order
5
Work order, Replace driveway
$0.00Subtotal
$0.00Tax
5Lines to price
Kept in this browser only. Nothing you type here goes to Koira unless you tap Customize and send. The CSV opens in Google Sheets and Excel. In the print window, pick Save as PDF.
Your business name

Work order

Number
WO-1001
Customer and siteCustomer name
JobReplace driveway
DescriptionQtyUnit
Set forms, slope to street480sq ft
Compact base, check depth6cu yd
Lay mesh on chairs480sq ft
Pour and broom finish480sq ft
Saw control joints next morning90ft
Site notes
Truck backs in from the street; neighbor knows. Sprinkler head by the front walk; cap it. Pour booked for early morning.
Instructions
Check form grades before the truck arrives. Photograph the base and mesh before the pour.
Work done as written (crew lead)
Customer
Date

What a concrete work order is for

A pour day has no room for confusion: the truck is booked, the concrete starts setting, the finish must be right the first time. A work order with the thickness, slope, joint layout, finish and truck access, plus utilities and sprinkler lines, gets everyone on the same plan before the first load arrives.

What to put on a concrete work order

  • Area, thickness and slope direction.
  • Base and reinforcement.
  • Joint layout.
  • Finish type.
  • Truck access and pour time.
  • Utilities and private lines.

A worked example

Pour day for the driveway. Prices are hidden.

LineQtyUnitPrice
Set forms, slope to street480sq ftYour price
Compact base, check depth6cu ydYour price
Lay mesh on chairs480sq ftYour price
Pour and broom finish480sq ftYour price
Saw control joints next morning90ftYour price

Put truck access and the sprinkler head by the walk in site notes. Note the pour time so the crew is ready when the truck arrives.

Line items concrete contractors use

Line itemUnitHow to write it
Concrete flatwork, placed and finishedsq ftThickness, finish (broom, smooth, stamped) and mix strength.
Remove and haul old concretesq ftBreakout, loading and disposal.
Excavation and gradingsq ftTo the depth for base and slab.
Gravel base, compactedcu ydDepth of base.
Reinforcement, mesh or rebarsq ftSay which and the spacing for rebar.
Control joints, sawed or tooledftWhere cracks are encouraged to form.
Expansion joint at house or slabftWhere new meets existing.
Stamped or colored finishsq ftPattern and color; sealer included or not.
Concrete sealersq ftApplied after curing.
Steps, formed and pouredeachPer step; width and rise.
FootingsftWidth and depth per plan or code.
Pump truckeachWhen the truck cannot reach the pour.
Permit and inspectioneachDriveways and approaches often need one; check locally.

How to fill it in

  1. Fill in the customer, the site and the date.
  2. Add who is assigned, the arrival window and access.
  3. List the tasks and materials in the order the crew will need them.
  4. Put gate codes, pets and anything to protect in the site notes.
  5. Print it for the truck or send it to the crew's phone as a PDF.

Free tools for concrete

The same work order for other trades: appliance repair, auto detailing, carpet cleaning, chimney, house cleaning, commercial cleaning, drywall, electrical, fence, flooring, garage door, general contractor, gutter, handyman, hvac, irrigation, junk removal, landscaping, lawn care, locksmith, moving, painting, pest control, plumbing, pool service, pressure washing, remodeling, roofing, septic, snow removal, solar, tree service, waterproofing, window cleaning.

FAQ

What should a concrete work order include?

The area, thickness, slope, base, reinforcement, joint layout, finish, truck access, pour time and utilities. Pour day needs everyone on the same plan.

Why photograph the base before pouring?

Photos show the base depth and reinforcement placement, which you cannot see after the pour. They support your warranty.

When should control joints be cut?

Soon after the concrete can take the saw without raveling, which depends on the mix and the weather. Note the plan on the work order.

How do I plan truck access?

Walk the route, note overhead lines and soft ground, and tell neighbors if the truck needs their side of the street.

We know what works. Leave it to Koira.

☼⚙
Standard⚡ Turbo
● Koira did it● You by hand
Today $9,300$8,100 / $1,200
This week $25,050$18,570 / $6,480
This month $69,300$46,150 / $23,150
Money, just now
Reminded Sean Love, $1,850. Polite reminder with the pay link.
Bids, 9:44 am
Nudged Dana on the kitchen bid. Day 3 follow up. She opened it at 9:12.
Convos, 9:41 am
Texted back a missed call. Walk through booked Thu 10:00.
Free Concrete Work Order Template (PDF and Word) | Koira