Free gutter work order template

A gutter work order for the crew: runs and footage, color, downspout locations and discharge, ladder and access notes, and what to protect below.

FreeNo email, no sign-up
5 linesFilled in for gutter
PDF, Word, CSVPrint or download
Your business
Logo
Kept in this browser for your next document. It is not uploaded.
Optional. Add it if your trade is licensed where you work.
Customer and site
Work order details
Tasks and materials
DescriptionQtyUnit
qty
qty
qty
qty
qty
lines on this work order
5
Work order, Replace gutters and downspouts
$0.00Subtotal
$0.00Tax
5Lines to price
Kept in this browser only. Nothing you type here goes to Koira unless you tap Customize and send. The CSV opens in Google Sheets and Excel. In the print window, pick Save as PDF.
Your business name

Work order

Number
WO-1001
Customer and siteCustomer name
JobReplace gutters and downspouts
DescriptionQtyUnit
Remove old gutters and hangers200ft
Form and hang seamless gutter, white200ft
Hang downspouts at marked corners5each
Install extensions away from foundation5each
Water test all runs1each
Site notes
Deck under the back eave; use ladder pads. Garden bed along the front; step carefully. Downspout at the back right drains to the yard, not the patio.
Instructions
Check fascia as old gutters come off; call the office before repairing more than the listed footage.
Work done as written (crew lead)
Customer
Date

What a gutter work order is for

Seamless gutters are formed on site to length, so the crew needs exact runs, the color, and where every downspout goes before the machine starts. A work order with that and the access notes, such as a deck under one eave and a garden bed under another, keeps install day smooth.

What to put on a gutter work order

  • Runs and footage.
  • Gutter size, color and hanger spacing.
  • Downspout locations and discharge.
  • Ladder setup and access.
  • What to protect below.
  • Water test and sign-off.

A worked example

Install day. Prices are hidden.

LineQtyUnitPrice
Remove old gutters and hangers200ftYour price
Form and hang seamless gutter, white200ftYour price
Hang downspouts at marked corners5eachYour price
Install extensions away from foundation5eachYour price
Water test all runs1eachYour price

Put the deck and the garden bed in site notes. Ladders on decks and boots in gardens are the usual complaints.

Line items gutter contractors use

Line itemUnitHow to write it
Seamless aluminum gutterftSize (5 or 6 inch), gauge and color.
DownspoutsftSize and count; where each discharges.
Remove and haul away old guttersftIncluding old hangers.
Gutter guardsftType: screen, micro-mesh or reverse curve.
Hidden hangerseachSpacing per your standard.
Fascia board repairftRotted fascia found when old gutters come off.
Downspout extensions or buried drainsftMoves water away from the foundation.
Gutter cleaningftPer foot or per house; say whether downspouts are flushed.
Seal leaking seams and cornerseachRepairs on existing gutters.
Re-pitch sagging gutterftRe-hang to drain properly.
Second story surchargeftLadder work above the first floor.
Copper or steel gutterftPremium materials priced separately.

How to fill it in

  1. Fill in the customer, the site and the date.
  2. Add who is assigned, the arrival window and access.
  3. List the tasks and materials in the order the crew will need them.
  4. Put gate codes, pets and anything to protect in the site notes.
  5. Print it for the truck or send it to the crew's phone as a PDF.

Free tools for gutter

The same work order for other trades: appliance repair, auto detailing, carpet cleaning, chimney, house cleaning, commercial cleaning, concrete, drywall, electrical, fence, flooring, garage door, general contractor, handyman, hvac, irrigation, junk removal, landscaping, lawn care, locksmith, moving, painting, pest control, plumbing, pool service, pressure washing, remodeling, roofing, septic, snow removal, solar, tree service, waterproofing, window cleaning.

FAQ

What should a gutter work order include?

Runs and footage, size and color, hanger spacing, downspout locations and discharge, ladder and access notes, what to protect, and a water test.

Why note downspout discharge on the work order?

Where water goes matters for the foundation and the neighbors. Agree it with the customer and write it down.

Should the crew water test the gutters?

Yes. A hose test shows the pitch and seams are right before the crew leaves. It also catches a downspout that dumps onto the patio before the customer does.

How do I protect decks and gardens?

Ladder pads or standoffs on decks, and care in beds. Note them on the work order. Garden beds under eaves get trampled easily, so say where they are.

We know what works. Leave it to Koira.

☼⚙
Standard⚡ Turbo
● Koira did it● You by hand
Today $9,300$8,100 / $1,200
This week $25,050$18,570 / $6,480
This month $69,300$46,150 / $23,150
Money, just now
Reminded Sean Love, $1,850. Polite reminder with the pay link.
Bids, 9:44 am
Nudged Dana on the kitchen bid. Day 3 follow up. She opened it at 9:12.
Convos, 9:41 am
Texted back a missed call. Walk through booked Thu 10:00.
Free Gutter Work Order Template (PDF and Word) | Koira