What a glass work order is for
Glass installs go wrong in two ways: the piece does not fit, or it breaks on the way in. A work order with every measured size, glass type, hardware and finish, plus where to stage and how to carry, lets the installer check the delivery against the order and plan the carry before lifting anything.
What to put on a glass work order
- Openings with measured sizes.
- Glass type and thickness.
- Hardware and finish.
- Safety glass check.
- Carry path and staging.
A worked example
Install day for the pane and the shower door, with no prices shown to the installer.
| Line | Qty | Unit | Price |
|---|---|---|---|
| Remove fogged unit, living room, 30 x 36 | 1 | each | Your price |
| Set new insulated unit, tape and blocks | 1 | each | Your price |
| Hang frameless shower door, 3/8 glass | 1 | each | Your price |
| Silicone and clean | 1 | each | Your price |
Check the delivered sizes against the work order before removing the old glass. A wrong size found later leaves an opening open.
Line items glass companies use
| Line item | Unit | How to write it |
|---|---|---|
| Insulated glass unit, replaced | each | Size, glass type and spacer color. |
| Single pane glass, replaced | each | Size, thickness and glazing method. |
| Tempered safety glass | each | Where code calls for safety glass. |
| Frameless shower door | each | Glass thickness, hinges and hardware finish. |
| Framed shower door | each | Slider or swing, frame finish. |
| Mirror, cut and installed | sq ft | Edge finish and mounting. |
| Tabletop or shelf glass | each | Size, edge and thickness. |
| Storefront glass | each | Size, tempered or laminated. |
| Board-up, emergency | each | After-hours call, plywood and fasteners. |
| Measure visit | visit | Credited to the job if it goes ahead. |
| Glazing tape, blocks and sealant | each | Per opening. |
| Disposal of old glass | each | Per pane or panel. |
How to fill it in
- Fill in the customer, the site and the date.
- Add who is assigned, the arrival window and access.
- List the tasks and materials in the order the crew will need them.
- Put gate codes, pets and anything to protect in the site notes.
- Print it for the truck or send it to the crew's phone as a PDF.
Free tools for glass
The same work order for other trades: appliance repair, auto detailing, carpentry, carpet cleaning, chimney, house cleaning, commercial cleaning, concrete, deck, drywall, duct cleaning, electrical, fence, flooring, garage door, general contractor, gutter, handyman, holiday lighting, home inspection, hood cleaning, hvac, insulation, irrigation, junk removal, landscaping, lawn care, locksmith, masonry, moving, painting, pest control, plumbing, pool service, pressure washing, property maintenance, remodeling, restoration, roofing, security system, septic, siding, snow removal, solar, tile, tree service, water treatment, waterproofing, window cleaning, window and door.