Free glass work order template

A glass work order for the installer: openings, measured sizes, glass type, hardware, safety glass checks, and how to protect the room.

FreeNo email, no sign-up
4 linesFilled in for glass
PDF, Word, CSVPrint or download
Your business
Logo
Kept in this browser for your next document. It is not uploaded.
Optional. Add it if your trade is licensed where you work.
Customer and site
Work order details
Tasks and materials
DescriptionQtyUnit
qty
qty
qty
qty
lines on this work order
4
Work order, Replace two fogged panes and install a shower door
$0.00Subtotal
$0.00Tax
4Lines to price
Kept in this browser only. Nothing you type here goes to Koira unless you tap Customize and send. The CSV opens in Google Sheets and Excel. In the print window, pick Save as PDF.
Your business name

Work order

Number
WO-1001
Customer and siteCustomer name
JobReplace two fogged panes and install a shower door
DescriptionQtyUnit
Remove fogged unit, living room, 30 x 361each
Set new insulated unit, tape and blocks1each
Hang frameless shower door, 3/8 glass1each
Silicone and clean1each
Site notes
Carry the shower door up the front stairs; the back hall is too tight. Owner's cat stays in the bedroom.
Instructions
Check sizes before removal. Two people for the shower door glass.
Work done as written (crew lead)
Customer
Date

What a glass work order is for

Glass installs go wrong in two ways: the piece does not fit, or it breaks on the way in. A work order with every measured size, glass type, hardware and finish, plus where to stage and how to carry, lets the installer check the delivery against the order and plan the carry before lifting anything.

What to put on a glass work order

  • Openings with measured sizes.
  • Glass type and thickness.
  • Hardware and finish.
  • Safety glass check.
  • Carry path and staging.

A worked example

Install day for the pane and the shower door, with no prices shown to the installer.

LineQtyUnitPrice
Remove fogged unit, living room, 30 x 361eachYour price
Set new insulated unit, tape and blocks1eachYour price
Hang frameless shower door, 3/8 glass1eachYour price
Silicone and clean1eachYour price

Check the delivered sizes against the work order before removing the old glass. A wrong size found later leaves an opening open.

Line items glass companies use

Line itemUnitHow to write it
Insulated glass unit, replacedeachSize, glass type and spacer color.
Single pane glass, replacedeachSize, thickness and glazing method.
Tempered safety glasseachWhere code calls for safety glass.
Frameless shower dooreachGlass thickness, hinges and hardware finish.
Framed shower dooreachSlider or swing, frame finish.
Mirror, cut and installedsq ftEdge finish and mounting.
Tabletop or shelf glasseachSize, edge and thickness.
Storefront glasseachSize, tempered or laminated.
Board-up, emergencyeachAfter-hours call, plywood and fasteners.
Measure visitvisitCredited to the job if it goes ahead.
Glazing tape, blocks and sealanteachPer opening.
Disposal of old glasseachPer pane or panel.

How to fill it in

  1. Fill in the customer, the site and the date.
  2. Add who is assigned, the arrival window and access.
  3. List the tasks and materials in the order the crew will need them.
  4. Put gate codes, pets and anything to protect in the site notes.
  5. Print it for the truck or send it to the crew's phone as a PDF.

Free tools for glass

The same work order for other trades: appliance repair, auto detailing, carpentry, carpet cleaning, chimney, house cleaning, commercial cleaning, concrete, deck, drywall, duct cleaning, electrical, fence, flooring, garage door, general contractor, gutter, handyman, holiday lighting, home inspection, hood cleaning, hvac, insulation, irrigation, junk removal, landscaping, lawn care, locksmith, masonry, moving, painting, pest control, plumbing, pool service, pressure washing, property maintenance, remodeling, restoration, roofing, security system, septic, siding, snow removal, solar, tile, tree service, water treatment, waterproofing, window cleaning, window and door.

More for glass companies: how glass companies run on Koira.

FAQ

What goes on a glass work order?

Each opening with measured size, glass type and thickness, hardware and finish, a safety glass check, and the carry path and staging.

Why check glass sizes before removing the old pane?

If the new piece is wrong, the old one is still in place. Finding out after removal leaves the customer with an open window.

How many people should carry shower door glass?

Plan for two. Heavy tempered panels are awkward, and the work order is where the crew learns the carry path.

Does the installer need prices on the glass work order?

No. Leave prices off; the installer's copy is sizes, glass type, hardware, safety checks and the carry path.

We know what works. Leave it to Koira.

☼⚙
Standard⚡ Turbo
● Koira did it● You by hand
Today $9,300$8,100 / $1,200
This week $25,050$18,570 / $6,480
This month $69,300$46,150 / $23,150
Money, just now
Reminded Sean Love, $1,850. Polite reminder with the pay link.
Bids, 9:44 am
Nudged Dana on the kitchen bid. Day 3 follow up. She opened it at 9:12.
Convos, 9:41 am
Texted back a missed call. Walk through booked Thu 10:00.
Free Glass Work Order Template (PDF and Word) | Koira