Free flooring work order template

A flooring work order for the installer: rooms, product and layout direction, removal, subfloor checks, transitions, trim and what to move.

FreeNo email, no sign-up
5 linesFilled in for flooring
PDF, Word, CSVPrint or download
Your business
Logo
Kept in this browser for your next document. It is not uploaded.
Optional. Add it if your trade is licensed where you work.
Customer and site
Work order details
Tasks and materials
DescriptionQtyUnit
qty
qty
qty
qty
qty
lines on this work order
5
Work order, Luxury vinyl plank, main floor
$0.00Subtotal
$0.00Tax
5Lines to price
Kept in this browser only. Nothing you type here goes to Koira unless you tap Customize and send. The CSV opens in Google Sheets and Excel. In the print window, pick Save as PDF.
Your business name

Work order

Number
WO-1001
Customer and siteCustomer name
JobLuxury vinyl plank, main floor
DescriptionQtyUnit
Remove carpet, pad and vinyl750sq ft
Check subfloor flatness, level kitchen dip1each
Install plank, run with the long wall790sq ft
Transitions at hall, bath and entry3each
Install quarter round240ft
Site notes
Run planks parallel to the long living room wall. Fridge has a water line; shut the valve before moving it.
Instructions
Photograph the subfloor after removal. Call the office before leveling more than the listed area.
Work done as written (crew lead)
Customer
Date

What a flooring work order is for

Flooring mistakes are permanent: planks run the wrong way, a transition at the wrong height, a door that no longer closes. The work order sets the layout direction, the transitions, the trim plan and the subfloor checks before the first box is opened. It also notes the appliances that need careful handling.

What to put on a flooring work order

  • Rooms and product.
  • Layout direction and starting wall.
  • Removal and subfloor checks.
  • Transitions and thresholds.
  • Trim plan and door trimming.
  • Furniture and appliances to move.

A worked example

Install day for the plank floor. Prices are hidden.

LineQtyUnitPrice
Remove carpet, pad and vinyl750sq ftYour price
Check subfloor flatness, level kitchen dip1eachYour price
Install plank, run with the long wall790sq ftYour price
Transitions at hall, bath and entry3eachYour price
Install quarter round240ftYour price

Put the layout direction and the fridge in site notes. The fridge water line needs care when it is pulled out.

Line items flooring installers use

Line itemUnitHow to write it
Luxury vinyl plank, installedsq ftProduct line, wear layer and click or glue-down.
Engineered hardwood, installedsq ftSpecies, width and floating, nail or glue.
Solid hardwood, installedsq ftSpecies, grade and finish.
Tile, installedsq ftTile size and pattern; tile itself an allowance or supplied.
Carpet and pad, installedsq ftCarpet line and pad weight.
Remove and haul old flooringsq ftCarpet, tile, vinyl or wood; glued floors take longer.
Subfloor levelingsq ftSelf-leveler or grinding where the floor is out of flat.
Underlaymentsq ftType and whether it is a vapor barrier.
Baseboard or quarter roundftRemove and reinstall, or new.
Transitions and thresholdseachWhere floors meet.
Stair treadseachPer step.
Move furnitureroomSay what you move and what the owner moves.
Sand and refinish hardwoodsq ftCoats and stain color.

How to fill it in

  1. Fill in the customer, the site and the date.
  2. Add who is assigned, the arrival window and access.
  3. List the tasks and materials in the order the crew will need them.
  4. Put gate codes, pets and anything to protect in the site notes.
  5. Print it for the truck or send it to the crew's phone as a PDF.

Free tools for flooring

The same work order for other trades: appliance repair, auto detailing, carpet cleaning, chimney, house cleaning, commercial cleaning, concrete, drywall, electrical, fence, garage door, general contractor, gutter, handyman, hvac, irrigation, junk removal, landscaping, lawn care, locksmith, moving, painting, pest control, plumbing, pool service, pressure washing, remodeling, roofing, septic, snow removal, solar, tree service, waterproofing, window cleaning.

FAQ

What should a flooring work order include?

The rooms and product, layout direction, removal, subfloor checks, transitions, trim and door trimming, and what to move.

Why note layout direction?

Plank direction changes how the room looks and cannot be changed after install. Agree it with the owner and write it down.

Should installers photograph the subfloor?

Yes. Photos of the subfloor after removal back up any leveling charge and the warranty. They also show the customer why a floor needed extra prep they could not see.

Who moves appliances for a flooring job?

Say it on the estimate and the work order. Fridges with water lines and gas ranges need extra care.

We know what works. Leave it to Koira.

☼⚙
Standard⚡ Turbo
● Koira did it● You by hand
Today $9,300$8,100 / $1,200
This week $25,050$18,570 / $6,480
This month $69,300$46,150 / $23,150
Money, just now
Reminded Sean Love, $1,850. Polite reminder with the pay link.
Bids, 9:44 am
Nudged Dana on the kitchen bid. Day 3 follow up. She opened it at 9:12.
Convos, 9:41 am
Texted back a missed call. Walk through booked Thu 10:00.
Free Flooring Work Order Template (PDF and Word) | Koira