Free flooring estimate template

A flooring estimate with removal, subfloor prep, underlayment, the floor itself, trim and transitions. Measure the rooms, add your prices and the product, and send it.

FreeNo email, no sign-up
7 linesFilled in for flooring
PDF, Word, CSVPrint or download
Your business
Logo
Kept in this browser for your next document. It is not uploaded.
Optional. Add it if your trade is licensed where you work.
Prepared for
Estimate details
Line items
DescriptionQtyUnitPrice
qty
$
qty
$
qty
$
qty
$
qty
$
qty
$
qty
$
%
Leave at 0 if your work is not taxed where you are.
$
%
Some states cap deposits on home improvement work. Check yours.
Total
$0.00
Estimate, Luxury vinyl plank, main floor
$0.00Subtotal
$0.00Deposit to start
7Lines to price
Kept in this browser only. Nothing you type here goes to Koira unless you tap Customize and send. The CSV opens in Google Sheets and Excel. In the print window, pick Save as PDF.
Your business name

Estimate

Number
E-1001
Prepared forCustomer name
JobLuxury vinyl plank, main floor
DescriptionQtyUnitPriceAmount
Remove carpet, pad and old vinyl750sq ft
Subfloor leveling, where needed0sq ft
Underlayment750sq ft
Luxury vinyl plank, installed790sq ft
Quarter round, new240ft
Transitions3each
Move furniture3room
Subtotal
$0.00
Total
$0.00
7 lines have no price yet
Notes
Plank quantity includes a waste allowance. Subfloor leveling, if needed, billed at the price listed.
Terms
Deposit at signing orders flooring. Balance due on completion. Price good until the date above.
Accepted by (customer signature)
Date

What a flooring estimate is for

Flooring estimates are often a single price per square foot that hides removal, leveling and trim. When the old floor comes up and the subfloor is uneven, that hidden part becomes a fight. An estimate that lists removal, prep, underlayment, trim and transitions, and says how subfloor problems are handled, keeps the job friendly.

What to put on a flooring estimate

  • Rooms and square footage, with a waste allowance.
  • Product, line and color.
  • Removal and haul-away of the old floor.
  • Subfloor prep and how surprises are priced.
  • Underlayment.
  • Baseboards, transitions and stairs.
  • Furniture moving.

A worked example

A main floor with carpet in the living room and old vinyl in the kitchen, about 750 sq ft, to be replaced with click luxury vinyl plank.

LineQtyUnitPrice
Remove carpet, pad and old vinyl750sq ftYour price
Subfloor leveling, where needed0sq ftYour price
Underlayment750sq ftYour price
Luxury vinyl plank, installed790sq ftYour price
Quarter round, new240ftYour price
Transitions3eachYour price
Move furniture3roomYour price

The plank line includes waste, so it is larger than the room area. The leveling line is at zero, with the price per square foot agreed before the old floor comes up.

Line items flooring installers use

Line itemUnitHow to write it
Luxury vinyl plank, installedsq ftProduct line, wear layer and click or glue-down.
Engineered hardwood, installedsq ftSpecies, width and floating, nail or glue.
Solid hardwood, installedsq ftSpecies, grade and finish.
Tile, installedsq ftTile size and pattern; tile itself an allowance or supplied.
Carpet and pad, installedsq ftCarpet line and pad weight.
Remove and haul old flooringsq ftCarpet, tile, vinyl or wood; glued floors take longer.
Subfloor levelingsq ftSelf-leveler or grinding where the floor is out of flat.
Underlaymentsq ftType and whether it is a vapor barrier.
Baseboard or quarter roundftRemove and reinstall, or new.
Transitions and thresholdseachWhere floors meet.
Stair treadseachPer step.
Move furnitureroomSay what you move and what the owner moves.
Sand and refinish hardwoodsq ftCoats and stain color.

Terms and deposit language for flooring

  • Deposit. A deposit at signing orders flooring, which often needs time to arrive and acclimate. Check your state's rules on deposits.
  • Payment. Balance due when the floor is installed and trim is done.
  • Warranty. Products carry the maker's warranty, which may require proper installation and moisture limits. State how long you warrant your installation.
  • Subfloor condition is checked after removal; repairs or leveling found are priced by change order.
  • Material quantities include a waste allowance; leftover boxes stay with the customer.
  • Doors may need trimming for new floor heights; say who does it.

How to fill it in

  1. Put in your business details once; this browser keeps them for every template.
  2. Fill in the customer and the job.
  3. Change the line items to fit this job and add your prices.
  4. Set tax, the deposit and the good-until date.
  5. Print to PDF, download Word or CSV, or send it from Koira.

Free tools for flooring

The same estimate for other trades: appliance repair, auto detailing, carpet cleaning, chimney, house cleaning, commercial cleaning, concrete, drywall, electrical, fence, garage door, general contractor, gutter, handyman, hvac, irrigation, junk removal, landscaping, lawn care, locksmith, moving, painting, pest control, plumbing, pool service, pressure washing, remodeling, roofing, septic, snow removal, solar, tree service, waterproofing, window cleaning.

FAQ

What should a flooring estimate include?

Rooms and square footage with waste, the product, removal, subfloor prep, underlayment, baseboards, transitions, stairs and furniture moving. Listing prep avoids the subfloor argument later.

How much waste should flooring estimates include?

It depends on the product, the room shapes and the layout pattern. Diagonal and herringbone layouts waste more. Use your own figures from past jobs.

How do I handle subfloor problems on an estimate?

Put a leveling or repair line at a per-square-foot price and zero quantity, and say it is billed only if needed after removal.

Should flooring estimates name the product?

Yes. Products vary in wear layer, thickness and warranty, and customers comparing estimates need to know what they are getting.

We know what works. Leave it to Koira.

☼⚙
Standard⚡ Turbo
● Koira did it● You by hand
Today $9,300$8,100 / $1,200
This week $25,050$18,570 / $6,480
This month $69,300$46,150 / $23,150
Money, just now
Reminded Sean Love, $1,850. Polite reminder with the pay link.
Bids, 9:44 am
Nudged Dana on the kitchen bid. Day 3 follow up. She opened it at 9:12.
Convos, 9:41 am
Texted back a missed call. Walk through booked Thu 10:00.
Free Flooring Estimate Template (PDF and Word) | Koira