Free electrical estimate template

An electrical estimate with panel, circuits, devices, permit and inspection ready to price. Fit it to a panel change, an EV charger or a remodel, add your prices and send it.

FreeNo email, no sign-up
7 linesFilled in for electrical
PDF, Word, CSVPrint or download
Your business
Logo
Kept in this browser for your next document. It is not uploaded.
Optional. Add it if your trade is licensed where you work.
Prepared for
Estimate details
Line items
DescriptionQtyUnitPrice
qty
$
qty
$
qty
$
qty
$
qty
$
qty
$
qty
$
%
Leave at 0 if your work is not taxed where you are.
$
%
Some states cap deposits on home improvement work. Check yours.
Total
$0.00
Estimate, Panel replacement and service upgrade
$0.00Subtotal
$0.00Deposit to start
7Lines to price
Kept in this browser only. Nothing you type here goes to Koira unless you tap Customize and send. The CSV opens in Google Sheets and Excel. In the print window, pick Save as PDF.
Your business name

Estimate

Number
E-1001
Prepared forCustomer name
JobPanel replacement and service upgrade
DescriptionQtyUnitPriceAmount
Service upgrade, meter base and mast1each
Panel replacement with main breaker1each
Transfer existing circuits and label panel1each
Arc-fault breakers where required8each
EV charger circuit1each
Whole-house surge protector1each
Permit and inspection1each
Subtotal
$0.00
Total
$0.00
7 lines have no price yet
Notes
Power will be off for most of one working day while the utility disconnects and reconnects. The arc-fault count depends on what the inspector requires.
Terms
Deposit at signing for equipment. Balance due when the work passes inspection. Price holds until the date above.
Accepted by (customer signature)
Date

What an electrical estimate is for

Electrical work is invisible to most homeowners, so the estimate is how they understand what they are buying. Naming the amperage, the number of circuits, the code items such as arc-fault and ground-fault protection, and the permit makes the price make sense. It also sets expectations for the day the power is off and the inspector visits.

What to put on an electrical estimate

  • The panel or service size, and the brand of equipment.
  • Each new circuit with what it feeds.
  • Code-required protection that the old setup lacked.
  • Permit, inspection and utility coordination.
  • How long the power will be off.
  • What happens if existing wiring is found unsafe.
  • The deposit and how long the price holds.

A worked example

An older house with a full panel and the homeowner adding a heat pump and an EV charger. The service and panel need upgrading, and the utility must disconnect for the meter work.

LineQtyUnitPrice
Service upgrade, meter base and mast1eachYour price
Panel replacement with main breaker1eachYour price
Transfer existing circuits and label panel1eachYour price
Arc-fault breakers where required8eachYour price
EV charger circuit1eachYour price
Whole-house surge protector1eachYour price
Permit and inspection1eachYour price

The arc-fault line has a count, not a promise; the number depends on which circuits code reaches once the panel is changed. Say so in the notes, and state the expected power-off window.

Line items electricians use

Line itemUnitHow to write it
Service calleachThe trip and the first part of troubleshooting.
Panel replacement, with breakerseachAmperage, brand and number of spaces.
Service upgrade, meter base and masteachSay who coordinates the disconnect and reconnect with the utility.
New circuit, home run to paneleachWire size, breaker size and what it feeds.
Receptacle, add or replaceeachNote GFCI or AFCI protection where code calls for it.
Light fixture install, customer suppliedeachSay who supplied the fixture and whether a new box is needed.
Recessed lighteachCount the cans and say whether the ceiling is open or finished.
Ceiling fan with fan-rated boxeachInclude the brace if the existing box is not fan rated.
EV charger circuiteachAmperage, run length and whether the panel has room.
Whole-house surge protectoreachInstalled at the panel.
Smoke and CO detectors, hardwiredeachInterconnected where required.
Wire runftFor long runs priced by the foot, with the wire size.
Permit and inspectioneachElectrical permits are required for most new circuits; check local rules.
Electrical laborhourTroubleshooting and work that cannot be priced flat.

Terms and deposit language for electrical

  • Deposit. Small service calls are paid on completion. Panel changes, service upgrades and remodel wiring take a deposit at signing for equipment and the schedule. Check your state's rules on deposits.
  • Payment. Balance due when the work passes inspection or, for work that needs no permit, when it is done and tested.
  • Warranty. State your workmanship warranty and that devices and fixtures carry the maker's warranty. Customer-supplied fixtures are covered for installation only.
  • Work is done to the electrical code adopted where the job is, and the inspector has the final word.
  • If opening a wall or panel shows unsafe existing wiring, it is reported to the customer and quoted before any repair.
  • Utility scheduling for a disconnect is outside your control; say how a delay is handled.

How to fill it in

  1. Put in your business details once; this browser keeps them for every template.
  2. Fill in the customer and the job.
  3. Change the line items to fit this job and add your prices.
  4. Set tax, the deposit and the good-until date.
  5. Print to PDF, download Word or CSV, or send it from Koira.

Free tools for electrical

The same estimate for other trades: appliance repair, auto detailing, carpet cleaning, chimney, house cleaning, commercial cleaning, concrete, drywall, fence, flooring, garage door, general contractor, gutter, handyman, hvac, irrigation, junk removal, landscaping, lawn care, locksmith, moving, painting, pest control, plumbing, pool service, pressure washing, remodeling, roofing, septic, snow removal, solar, tree service, waterproofing, window cleaning.

More for electricians: how electricians run on Koira.

FAQ

What should an electrical estimate include?

The equipment and its size, each circuit and what it serves, code-required protection, permit and inspection, utility coordination, the power-off window, what happens if unsafe wiring is found, the deposit and the good-until date.

Do electricians need a permit for a panel replacement?

Almost everywhere, yes, and the utility usually needs to disconnect service. Rules vary by city and county. Put the permit on the estimate so the customer knows it is required, not optional.

How do I estimate rewiring an older house?

Count the circuits and devices, decide whether walls will be fished or opened, and price by device or by circuit with labor for access. Say who patches the openings. A walk through the attic and basement before pricing saves surprises.

Should electrical estimates list code requirements?

Yes. Customers often see arc-fault and ground-fault protection as extras. Listing them as code items, with a note that the inspector decides, shows they are required, not upsells.

We know what works. Leave it to Koira.

☼⚙
Standard⚡ Turbo
● Koira did it● You by hand
Today $9,300$8,100 / $1,200
This week $25,050$18,570 / $6,480
This month $69,300$46,150 / $23,150
Money, just now
Reminded Sean Love, $1,850. Polite reminder with the pay link.
Bids, 9:44 am
Nudged Dana on the kitchen bid. Day 3 follow up. She opened it at 9:12.
Convos, 9:41 am
Texted back a missed call. Walk through booked Thu 10:00.
Free Electrical Estimate Template (PDF and Word) | Koira