Free electrical change order template

An electrical change order for the surprises in old houses: knob and tube in the wall you opened, a grounding problem the inspector flagged, or extra circuits the homeowner asked for mid-job.

FreeNo email, no sign-up
3 linesFilled in for electrical
PDF, Word, CSVPrint or download
Your business
Logo
Kept in this browser for your next document. It is not uploaded.
Optional. Add it if your trade is licensed where you work.
Customer
Change order details
Line items
A credit for work taken out: type the quantity as a minus number.
DescriptionQtyUnitPrice
qty
$
qty
$
qty
$
$
%
Leave at 0 if your work is not taxed where you are.
Change total
$0.00
Change order, Change to panel upgrade
$0.00This change
$0.00Tax
3Lines to price
Kept in this browser only. Nothing you type here goes to Koira unless you tap Customize and send. The CSV opens in Google Sheets and Excel. In the print window, pick Save as PDF.
Your business name

Change order

Number
CO-1001
CustomerCustomer name
JobChange to panel upgrade
DescriptionQtyUnitPriceAmount
Upgrade grounding electrode conductor and rods1each
Install water pipe bond1each
Add garage receptacles on new circuit2each
This change
$0.00
Change total
$0.00
3 lines have no price yet
Reason for the change
Grounding and bonding corrections are required by the inspector. The two garage outlets were requested by the homeowner.
Terms
This change becomes part of the original agreement. The amount is due with the final payment after inspection.
Approved by (customer signature)
Contractor
Date

What an electrical change order is for

Electricians open walls and panels that have been modified for decades, and inspectors can call for corrections nobody saw at the estimate. A change order records the finding, the code reason, the price and any delay to the inspection, signed before the extra work. It keeps the final invoice about work the customer agreed to.

What to put on an electrical change order

  • The original estimate number and amount.
  • What was found or requested, and the code reason if there is one.
  • Added lines and any credits.
  • The new total and any added days.
  • Effect on the inspection date.
  • Customer signature before proceeding.

A worked example

During the panel swap, the crew finds the grounding electrode conductor undersized and the water pipe bond missing, and the inspector wants both corrected. The homeowner also asks for two extra garage outlets.

LineQtyUnitPrice
Upgrade grounding electrode conductor and rods1eachYour price
Install water pipe bond1eachYour price
Add garage receptacles on new circuit2eachYour price

Separate the code corrections from the customer's request in the notes. The customer sees which lines were required and which they chose, which makes the signature easy.

Line items electricians use

Line itemUnitHow to write it
Service calleachThe trip and the first part of troubleshooting.
Panel replacement, with breakerseachAmperage, brand and number of spaces.
Service upgrade, meter base and masteachSay who coordinates the disconnect and reconnect with the utility.
New circuit, home run to paneleachWire size, breaker size and what it feeds.
Receptacle, add or replaceeachNote GFCI or AFCI protection where code calls for it.
Light fixture install, customer suppliedeachSay who supplied the fixture and whether a new box is needed.
Recessed lighteachCount the cans and say whether the ceiling is open or finished.
Ceiling fan with fan-rated boxeachInclude the brace if the existing box is not fan rated.
EV charger circuiteachAmperage, run length and whether the panel has room.
Whole-house surge protectoreachInstalled at the panel.
Smoke and CO detectors, hardwiredeachInterconnected where required.
Wire runftFor long runs priced by the foot, with the wire size.
Permit and inspectioneachElectrical permits are required for most new circuits; check local rules.
Electrical laborhourTroubleshooting and work that cannot be priced flat.

Terms and deposit language for electrical

  • Deposit. Small service calls are paid on completion. Panel changes, service upgrades and remodel wiring take a deposit at signing for equipment and the schedule. Check your state's rules on deposits.
  • Payment. Balance due when the work passes inspection or, for work that needs no permit, when it is done and tested.
  • Warranty. State your workmanship warranty and that devices and fixtures carry the maker's warranty. Customer-supplied fixtures are covered for installation only.
  • Work is done to the electrical code adopted where the job is, and the inspector has the final word.
  • If opening a wall or panel shows unsafe existing wiring, it is reported to the customer and quoted before any repair.
  • Utility scheduling for a disconnect is outside your control; say how a delay is handled.

How to fill it in

  1. Put in the original estimate number and amount.
  2. Write what changed in the reason box, plainly.
  3. Add the new work; type a minus quantity for any credit.
  4. Fill in the days added.
  5. Print it for a signature on site, or send it from Koira to sign by phone.

Free tools for electrical

The same change order for other trades: appliance repair, auto detailing, carpet cleaning, chimney, house cleaning, commercial cleaning, concrete, drywall, fence, flooring, garage door, general contractor, gutter, handyman, hvac, irrigation, junk removal, landscaping, lawn care, locksmith, moving, painting, pest control, plumbing, pool service, pressure washing, remodeling, roofing, septic, snow removal, solar, tree service, waterproofing, window cleaning.

More for electricians: how electricians run on Koira.

FAQ

When does an electrician need a change order?

When the scope or price changes after signing: code corrections the inspector requires, unsafe existing wiring that has to be fixed, or extra work the customer asks for. Sign it before the work.

How do I handle inspector corrections on a change order?

List each correction, say it was required by the inspector, and price it. If the inspection has to be rescheduled, put the added days on the change order too.

What if I find knob and tube wiring?

Stop, show the homeowner, and quote replacing the affected run on a change order. Do not connect new work to it without saying so. Many insurers and inspectors care about it.

Can an electrical change order lower the price?

Yes. If the customer drops a fixture or circuit, enter a minus quantity on that line and it comes off the total.

We know what works. Leave it to Koira.

☼⚙
Standard⚡ Turbo
● Koira did it● You by hand
Today $9,300$8,100 / $1,200
This week $25,050$18,570 / $6,480
This month $69,300$46,150 / $23,150
Money, just now
Reminded Sean Love, $1,850. Polite reminder with the pay link.
Bids, 9:44 am
Nudged Dana on the kitchen bid. Day 3 follow up. She opened it at 9:12.
Convos, 9:41 am
Texted back a missed call. Walk through booked Thu 10:00.
Free Electrical Change Order Template (PDF and Word) | Koira