Free irrigation change order template

An irrigation change order for low water pressure that needs more zones, rock in the trench path, extra beds or a customer who adds lighting.

FreeNo email, no sign-up
3 linesFilled in for irrigation
PDF, Word, CSVPrint or download
Your business
Logo
Kept in this browser for your next document. It is not uploaded.
Optional. Add it if your trade is licensed where you work.
Customer
Change order details
Line items
A credit for work taken out: type the quantity as a minus number.
DescriptionQtyUnitPrice
qty
$
qty
$
qty
$
$
%
Leave at 0 if your work is not taxed where you are.
Change total
$0.00
Change order, Change to sprinkler install
$0.00This change
$0.00Tax
3Lines to price
Kept in this browser only. Nothing you type here goes to Koira unless you tap Customize and send. The CSV opens in Google Sheets and Excel. In the print window, pick Save as PDF.
Your business name

Change order

Number
CO-1001
CustomerCustomer name
JobChange to sprinkler install
DescriptionQtyUnitPriceAmount
Additional rotor zone for pressure1each
Drip zone for raised beds1each
Credit: rain sensor not installed-1each
This change
$0.00
Change total
$0.00
3 lines have no price yet
Reason for the change
Measured pressure at the meter was lower than planned, so one more zone is needed for coverage.
Terms
This change order amends the estimate. Due on completion.
Approved by (customer signature)
Contractor
Date

What an irrigation change order is for

Irrigation plans meet reality at the tap: water pressure lower than expected means more zones, a rock layer slows trenching, or the customer adds a bed they want watered. A change order with the reason and the price, signed before the extra work, keeps the system right and the bill fair.

What to put on an irrigation change order

  • The original estimate.
  • What was found or requested.
  • Added zones or work.
  • Credits.
  • The new total.
  • Signature before the extra work.

A worked example

Pressure at the meter is lower than expected, so the lawn needs one more zone. The customer adds a drip zone for new raised beds and drops the rain sensor.

LineQtyUnitPrice
Additional rotor zone for pressure1eachYour price
Drip zone for raised beds1eachYour price
Credit: rain sensor not installed-1eachYour price

Record the pressure reading in the notes. It explains the extra zone better than any paragraph.

Line items irrigation contractors use

Line itemUnitHow to write it
Sprinkler zone, installedeachHeads, pipe and valve per zone; say rotor or spray.
Drip zone for bedseachDrip line and emitters.
Controller, smarteachWeather-based scheduling; brand and zone count.
Backflow preventereachRequired on most systems; testing rules vary by area.
Main line from tap or meterftPipe size and material.
Rain or freeze sensoreachShuts the system off when not needed.
Spring start-upvisitTurn on, check heads, set the controller.
Winterization blowoutvisitCompressed air to clear lines before freezing.
Head replacementeachBroken or worn heads.
Valve repair or replacementeachStuck or leaking valves.
Line leak repaireachDig, repair and backfill.
Backflow testeachYearly in many areas, by a certified tester.
Permit and utility locateeachLocate before digging; permit if required.

Terms and deposit language for irrigation

  • Deposit. New systems take a deposit at signing for materials. Service calls take none.
  • Payment. New systems due on completion and walk-through. Service due on completion.
  • Warranty. State your workmanship warranty on new systems, and that parts carry the maker's warranty. Freeze damage on systems not winterized by you is not covered.
  • Utilities are located before digging; private lines like lighting and invisible dog fences are the owner's to mark.
  • Lawn is restored over trenches; settling may need a top-up later.
  • Watering restrictions in your area may limit schedules; the controller is set to follow them.

How to fill it in

  1. Put in the original estimate number and amount.
  2. Write what changed in the reason box, plainly.
  3. Add the new work; type a minus quantity for any credit.
  4. Fill in the days added.
  5. Print it for a signature on site, or send it from Koira to sign by phone.

Free tools for irrigation

The same change order for other trades: appliance repair, auto detailing, carpentry, carpet cleaning, chimney, house cleaning, commercial cleaning, concrete, deck, drywall, duct cleaning, electrical, fence, flooring, garage door, general contractor, glass, gutter, handyman, holiday lighting, home inspection, hood cleaning, hvac, insulation, junk removal, landscaping, lawn care, locksmith, masonry, moving, painting, pest control, plumbing, pool service, pressure washing, property maintenance, remodeling, restoration, roofing, security system, septic, siding, snow removal, solar, tile, tree service, water treatment, waterproofing, window cleaning, window and door.

For irrigation contractorsA template covers one document. Koira handles the rest of the office side: quotes, invoices, booking, follow ups and your website, in one place.See how irrigation contractors use Koira

Shane Allen writes Koira's guides for trade business owners. How we check our numbers.

FAQ

When does an irrigation job need a change order?

When pressure or flow changes the zone count, trenching hits rock or roots, or the customer adds or drops zones or parts.

Why would low pressure add a zone?

Each zone can only run as many heads as the pressure and flow support. Less pressure means fewer heads per zone, so more zones.

Can I credit parts the customer drops?

Yes. Enter the dropped part, such as a rain sensor, with a minus quantity and the template takes it off the change total, so the new price is clear before the crew digs.

Should I measure pressure before the estimate?

Yes, if you can. It reduces surprises, though readings can change with the time of day. Measure at the meter and at a hose bib for a fuller picture.

We know what works. Leave it to Koira.

☼⚙
Standard⚡ Turbo
● Koira did it● You by hand
Today $9,300$8,100 / $1,200
This week $25,050$18,570 / $6,480
This month $69,300$46,150 / $23,150
Money, just now
Reminded Sean Love, $1,850. Polite reminder with the pay link.
Bids, 9:44 am
Nudged Dana on the kitchen bid. Day 3 follow up. Dana opened it at 9:12.
Convos, 9:41 am
Texted back a missed call. Walk through booked Thu 10:00.