Free septic change order template

A septic change order for a broken baffle, a crushed line, roots in the outlet or a failing pump found during service.

FreeNo email, no sign-up
3 linesFilled in for septic
PDF, Word, CSVPrint or download
Your business
Logo
Kept in this browser for your next document. It is not uploaded.
Optional. Add it if your trade is licensed where you work.
Customer
Change order details
Line items
A credit for work taken out: type the quantity as a minus number.
DescriptionQtyUnitPrice
qty
$
qty
$
qty
$
$
%
Leave at 0 if your work is not taxed where you are.
Change total
$0.00
Change order, Change to septic service
$0.00This change
$0.00Tax
3Lines to price
Kept in this browser only. Nothing you type here goes to Koira unless you tap Customize and send. The CSV opens in Google Sheets and Excel. In the print window, pick Save as PDF.
Your business name

Change order

Number
CO-1001
CustomerCustomer name
JobChange to septic service
DescriptionQtyUnitPriceAmount
Outlet baffle replacement1each
Line jetting, roots in outlet30ft
Credit: risers postponed-2each
This change
$0.00
Change total
$0.00
3 lines have no price yet
Reason for the change
Outlet baffle missing; roots in the outlet line. Photos attached.
Terms
Changes due on completion.
Approved by (customer signature)
Contractor
Date

What a septic change order is for

Opening a septic tank often shows what nobody knew: a missing baffle, roots in the outlet, a pump that hums but does not run. A change order with the finding, a photo and the price, approved before the repair, keeps the visit honest and the homeowner informed.

What to put on a septic change order

  • The original estimate.
  • What was found, with photos.
  • Added repairs and credits.
  • Permits if needed.
  • The new total.
  • Approval before the repair.

A worked example

While pumping, the crew finds the outlet baffle missing and roots in the outlet line. The owner skips the risers for now.

LineQtyUnitPrice
Outlet baffle replacement1eachYour price
Line jetting, roots in outlet30ftYour price
Credit: risers postponed-2eachYour price

Photos of the open tank make the baffle finding clear. Note that roots may return and the line may need jetting again.

Line items septic companies use

Line itemUnitHow to write it
Septic tank pumpinggalBy tank size; say the size pumped.
Locate and dig up lidseachWhen lids are buried.
Riser and lid installeachBrings lids to the surface for easy access.
Septic inspectioneachFor a sale or maintenance; name what it covers.
Camera inspection of lineseachHouse to tank, tank to field.
Baffle repair or replacementeachInlet or outlet.
Effluent filter cleaningeachWhere the system has one.
Line jettingftClears roots and buildup.
Pump or alarm replacementeachFor pump systems.
Drain field evaluationeachProbing and inspection of the field.
Drain field repair or replacementeachDesign and permits often required.
Permit and health department feeseachRepairs and replacements often need county approval.

Terms and deposit language for septic

  • Deposit. No deposit on pumping and inspections. Repairs and drain field work take a deposit for permits and materials.
  • Payment. Due on completion for pumping and inspections; repairs by milestone.
  • Warranty. State your workmanship warranty on repairs; pumps and alarms carry the maker's warranty.
  • Lids must be located; digging is billed if they are buried.
  • Drain field work usually needs county or health department permits and may need a design.
  • Driving over the drain field can damage it; trucks stay off it.

How to fill it in

  1. Put in the original estimate number and amount.
  2. Write what changed in the reason box, plainly.
  3. Add the new work; type a minus quantity for any credit.
  4. Fill in the days added.
  5. Print it for a signature on site, or send it from Koira to sign by phone.

Free tools for septic

The same change order for other trades: appliance repair, auto detailing, carpentry, carpet cleaning, chimney, house cleaning, commercial cleaning, concrete, deck, drywall, duct cleaning, electrical, fence, flooring, garage door, general contractor, glass, gutter, handyman, holiday lighting, home inspection, hood cleaning, hvac, insulation, irrigation, junk removal, landscaping, lawn care, locksmith, masonry, moving, painting, pest control, plumbing, pool service, pressure washing, property maintenance, remodeling, restoration, roofing, security system, siding, snow removal, solar, tile, tree service, water treatment, waterproofing, window cleaning, window and door.

For septic companiesA template covers one document. Koira handles the rest of the office side: quotes, invoices, booking, follow ups and your website, in one place.Septic software

Shane Allen writes Koira's guides for trade business owners. How we check our numbers.

FAQ

When does septic service need a change order?

When the crew finds broken baffles, roots, line damage or pump failures, or the owner adds or drops work.

Why is a missing baffle a problem?

Baffles keep solids in the tank. Without one, solids can flow to the field and clog it. Replacing a baffle is cheap compared with a clogged field.

Can a change order postpone work?

Yes, if it is safe. Credit the postponed item and note it for the next visit. Add it to the next visit's work order so it is not forgotten.

Should I photograph septic findings?

Yes. Photos of the open tank explain the repair better than words. Homeowners rarely see inside their tank, so pictures matter.

We know what works. Leave it to Koira.

☼⚙
Standard⚡ Turbo
● Koira did it● You by hand
Today $9,300$8,100 / $1,200
This week $25,050$18,570 / $6,480
This month $69,300$46,150 / $23,150
Money, just now
Reminded Sean Love, $1,850. Polite reminder with the pay link.
Bids, 9:44 am
Nudged Dana on the kitchen bid. Day 3 follow up. Dana opened it at 9:12.
Convos, 9:41 am
Texted back a missed call. Walk through booked Thu 10:00.