Free insulation change order template

An insulation change order for old insulation that has to come out, extra air sealing, added areas like a garage ceiling, or a different depth.

FreeNo email, no sign-up
3 linesFilled in for insulation
PDF, Word, CSVPrint or download
Your business
Logo
Kept in this browser for your next document. It is not uploaded.
Optional. Add it if your trade is licensed where you work.
Customer
Change order details
Line items
A credit for work taken out: type the quantity as a minus number.
DescriptionQtyUnitPrice
qty
$
qty
$
qty
$
$
%
Leave at 0 if your work is not taxed where you are.
Change total
$0.00
Change order, Change to attic insulation
$0.00This change
$0.00Tax
3Lines to price
Kept in this browser only. Nothing you type here goes to Koira unless you tap Customize and send. The CSV opens in Google Sheets and Excel. In the print window, pick Save as PDF.
Your business name

Change order

Number
CO-1001
CustomerCustomer name
JobChange to attic insulation
DescriptionQtyUnitPriceAmount
Remove wet insulation over bathroom80sq ft
Additional air sealing2hour
Garage ceiling, blown-in400sq ft
This change
$0.00
Change total
$0.00
3 lines have no price yet
Reason for the change
Wet insulation found over the bathroom; bath fan vents into the attic. Photos attached.
Terms
This change order amends the estimate. Due with the final payment.
Approved by (customer signature)
Contractor
Date

What an insulation change order is for

Once the crew is in the attic, the real job shows itself: wet insulation that has to go, more gaps than expected, a bath fan venting into the attic. A signed change order with photos, before the extra work, keeps the owner informed and keeps the receipt accurate to what was actually installed.

What to put on an insulation change order

  • What the crew found, with photos.
  • Added areas or depth.
  • Extra air sealing hours.
  • Credits.
  • New total and signature.

A worked example

The crew finds wet insulation over the bathroom that must come out, adds two hours of sealing, and the owner adds the garage ceiling.

LineQtyUnitPrice
Remove wet insulation over bathroom80sq ftYour price
Additional air sealing2hourYour price
Garage ceiling, blown-in400sq ftYour price

Note the cause of the wet insulation, often a bath fan venting into the attic. Fixing the cause belongs on the change order too.

Line items insulation contractors use

Line itemUnitHow to write it
Blown-in attic insulationsq ftMaterial, target R-value and settled depth.
Dense-pack wall insulationsq ftDrill and fill; how holes are patched.
Fiberglass battssq ftR-value and where they go.
Open-cell spray foamsq ftThickness and R-value.
Closed-cell spray foamsq ftThickness and R-value.
Air sealing, top plates and penetrationshourFoam and caulk at the gaps.
Attic baffleseachAt each rafter bay at the eaves.
Attic hatch insulation and weatherstripeachInsulated cover and seal.
Remove old insulationsq ftVacuum out and disposal.
Crawl space vapor barriersq ftThickness and how seams are taped.
Recessed light coverseachWhere old fixtures need a cover before blowing.
Attic ruler and receipt cardeachDepth markers and the installer's card.

Terms and deposit language for insulation

  • Deposit. On larger jobs a deposit is due at signing for spray foam or a large bag order. Each state sets home improvement deposit rules, so look up yours.
  • Payment. Balance due when the work is done and the receipt with coverage, depth and R-value is handed over.
  • Warranty. You warrant coverage and depth as recorded on the receipt. Settling is accounted for in the installed depth. Damage from roof leaks or pests is not covered.
  • The receipt shows coverage area, thickness and R-value, and for loose-fill the settled thickness and bag count.
  • Attic access, storage and anything in the way are the owner's to clear unless listed here.
  • Knob and tube wiring or signs of mold found in the attic stop the job until it is addressed.

How to fill it in

  1. Put in the original estimate number and amount.
  2. Write what changed in the reason box, plainly.
  3. Add the new work; type a minus quantity for any credit.
  4. Fill in the days added.
  5. Print it for a signature on site, or send it from Koira to sign by phone.

Free tools for insulation

The same change order for other trades: appliance repair, auto detailing, carpentry, carpet cleaning, chimney, house cleaning, commercial cleaning, concrete, deck, drywall, duct cleaning, electrical, fence, flooring, garage door, general contractor, glass, gutter, handyman, holiday lighting, home inspection, hood cleaning, hvac, irrigation, junk removal, landscaping, lawn care, locksmith, masonry, moving, painting, pest control, plumbing, pool service, pressure washing, property maintenance, remodeling, restoration, roofing, security system, septic, siding, snow removal, solar, tile, tree service, water treatment, waterproofing, window cleaning, window and door.

More for insulation contractors: how insulation contractors run on Koira.

For insulation contractorsA template covers one document. Koira handles the rest of the office side: quotes, invoices, booking, follow ups and your website, in one place.Quote and invoice insulation jobs

Shane Allen writes Koira's guides for trade business owners. How we check our numbers.

FAQ

When does an insulation job need a change order?

When wet or contaminated insulation must come out, extra sealing is needed, areas are added or the target depth changes.

What causes wet attic insulation?

Often a bath fan venting into the attic or a roof leak. Name the cause on the change order so it gets fixed too.

Does a change order affect the receipt?

Yes. Any added areas and depths go on the federal receipt, listed separately for each part of the house, so the final record matches what was installed.

How do I prove what I found?

Take photos in the attic of the wet or damaged insulation before you remove anything, and attach them to the signed change order for the owner.

We know what works. Leave it to Koira.

☼⚙
Standard⚡ Turbo
● Koira did it● You by hand
Today $9,300$8,100 / $1,200
This week $25,050$18,570 / $6,480
This month $69,300$46,150 / $23,150
Money, just now
Reminded Sean Love, $1,850. Polite reminder with the pay link.
Bids, 9:44 am
Nudged Dana on the kitchen bid. Day 3 follow up. Dana opened it at 9:12.
Convos, 9:41 am
Texted back a missed call. Walk through booked Thu 10:00.