Free siding change order template

A siding change order for soft sheathing beyond the estimate, added soffit or gutters, a color change before ordering, or walls dropped.

FreeNo email, no sign-up
3 linesFilled in for siding
PDF, Word, CSVPrint or download
Your business
Logo
Kept in this browser for your next document. It is not uploaded.
Optional. Add it if your trade is licensed where you work.
Customer
Change order details
Line items
A credit for work taken out: type the quantity as a minus number.
DescriptionQtyUnitPrice
qty
$
qty
$
qty
$
$
%
Leave at 0 if your work is not taxed where you are.
Change total
$0.00
Change order, Change to siding job
$0.00This change
$0.00Tax
3Lines to price
Kept in this browser only. Nothing you type here goes to Koira unless you tap Customize and send. The CSV opens in Google Sheets and Excel. In the print window, pick Save as PDF.
Your business name

Change order

Number
CO-1001
CustomerCustomer name
JobChange to siding job
DescriptionQtyUnitPriceAmount
Sheathing replacement, beyond estimate5each
Fascia wrap, garage48ft
Credit: shed walls-3square
This change
$0.00
Change total
$0.00
3 lines have no price yet
Reason for the change
Additional soft sheathing on the west wall; photos attached. Garage fascia added by owner.
Terms
This change order amends the estimate. Due with the final payment.
Approved by (customer signature)
Contractor
Date

What a siding change order is for

Siding changes come from what is behind the old panels and from owners who see the first wall and want more. A signed change order with photos and the new total, before the extra work, keeps the crew moving and avoids an argument at the walkthrough.

What to put on a siding change order

  • What was found or added.
  • Photos of hidden damage.
  • Added material and labor.
  • Credits.
  • New total and signature.

A worked example

Tear-off finds more soft sheathing than expected, the owner adds fascia wrap on the garage, and drops the shed walls.

LineQtyUnitPrice
Sheathing replacement, beyond estimate5eachYour price
Fascia wrap, garage48ftYour price
Credit: shed walls-3squareYour price

Sign before the sheathing is replaced. Once the new wrap is on, the damage is hidden again.

Line items siding contractors use

Line itemUnitHow to write it
Vinyl siding, supply and installsquareProfile, gauge and color.
Fiber cement siding, supply and installsquarePlank or shingle, primed or prefinished.
Tear-off and disposalsquareLayers removed and dumpster.
House wrap and flashingsq ftBrand and how seams and openings are taped.
Sheathing replacementeachPer sheet, if found soft after tear-off.
Corner postsftInside and outside corners.
Window and door trimeachPer opening; J-channel or trim boards.
SoffitftVented or solid.
Fascia wrapftAluminum coil color.
Insulated backer boardsq ftUnder vinyl, where offered.
Staging or liftdayFor second-story and gable walls.
PermiteachWhere your town requires one for siding.

Terms and deposit language for siding

  • Deposit. A deposit when the contract is signed covers siding, trim and wrap ordered in the chosen color. Your state may cap home improvement deposits, so check.
  • Payment. Balance due when the last wall is done, the yard is cleaned and the job is walked.
  • Warranty. The maker warrants the panels. You warrant the install against loose panels and leaks at trim you installed, for the time stated. Damage from storms and impacts is not workmanship.
  • Soft sheathing found after tear-off is replaced at the per sheet price on this estimate.
  • Plants against the house may be trimmed back for ladders; tell us which ones matter.
  • Satellite dishes, lights and hose bibs are removed and reset as listed.

How to fill it in

  1. Put in the original estimate number and amount.
  2. Write what changed in the reason box, plainly.
  3. Add the new work; type a minus quantity for any credit.
  4. Fill in the days added.
  5. Print it for a signature on site, or send it from Koira to sign by phone.

Free tools for siding

The same change order for other trades: appliance repair, auto detailing, carpentry, carpet cleaning, chimney, house cleaning, commercial cleaning, concrete, deck, drywall, duct cleaning, electrical, fence, flooring, garage door, general contractor, glass, gutter, handyman, holiday lighting, home inspection, hood cleaning, hvac, insulation, irrigation, junk removal, landscaping, lawn care, locksmith, masonry, moving, painting, pest control, plumbing, pool service, pressure washing, property maintenance, remodeling, restoration, roofing, security system, septic, snow removal, solar, tile, tree service, water treatment, waterproofing, window cleaning, window and door.

More for siding contractors: how siding contractors run on Koira.

For siding contractorsA template covers one document. Koira handles the rest of the office side: quotes, invoices, booking, follow ups and your website, in one place.See how siding contractors use Koira

Shane Allen writes Koira's guides for trade business owners. How we check our numbers.

FAQ

When does a siding job need a change order?

When tear-off finds more damage than estimated, the owner adds soffit, fascia or walls, changes the color, or drops part of the job.

Can the siding color change after ordering?

Sometimes, with a restocking charge from the supplier and a delay. Write both on the change order and get it signed before you reorder.

How do I document extra sheathing?

Photos of each soft area before it is cut out, attached to the change order with the count of sheets.

How is a dropped wall credited?

Enter the squares as a credit with a minus quantity, and the change order shows the new, lower total.

We know what works. Leave it to Koira.

☼⚙
Standard⚡ Turbo
● Koira did it● You by hand
Today $9,300$8,100 / $1,200
This week $25,050$18,570 / $6,480
This month $69,300$46,150 / $23,150
Money, just now
Reminded Sean Love, $1,850. Polite reminder with the pay link.
Bids, 9:44 am
Nudged Dana on the kitchen bid. Day 3 follow up. Dana opened it at 9:12.
Convos, 9:41 am
Texted back a missed call. Walk through booked Thu 10:00.