What a painting change order is for
Painting jobs grow: the customer adds the hallway, changes the bedroom color after the paint is mixed, or the wallpaper comes off to reveal damaged drywall. Each of these costs time and paint. A quick change order makes the addition clear and gets a signature before the crew does it, so the final invoice holds no surprises.
What to put on a painting change order
- The original estimate and total.
- What changed and why.
- Added lines or credits.
- New total.
- Days added, if any.
- Customer signature first.
A worked example
Midway through, the customer adds the upstairs hall, and wants the dining room in a new color after the first color was mixed. They also decide to leave the closet interiors unpainted.
| Line | Qty | Unit | Price |
|---|---|---|---|
| Upstairs hall walls and ceiling | 1 | each | Your price |
| Dining room color change, new paint | 2 | gal | Your price |
| Credit: closet interiors not painted | -3 | each | Your price |
The closet credit nets against the additions. Put the original total in Original amount, and the template shows the new total for the signature.
Line items painters use
| Line item | Unit | How to write it |
|---|---|---|
| Paint walls, two coats | sq ft | Wall area, not floor area; say the paint line and sheen. |
| Paint ceilings | sq ft | Flat ceiling paint unless the customer asks otherwise. |
| Paint trim and baseboards | ft | By the foot, or per room if you prefer. |
| Paint doors and frames | each | Both sides and the frame, or say otherwise. |
| Paint cabinets | each | Per door and drawer front; say whether boxes are included. |
| Drywall patching and sanding | hour | Nail pops, dents and small holes before paint. |
| Prime stains or new drywall | sq ft | Stain-blocking primer where water or smoke marks are. |
| Caulk gaps at trim | ft | Where trim meets wall. |
| Exterior siding, wash, scrape and paint | sq ft | Prep matters most outside; describe it. |
| Scrape and prime bare wood | hour | Exterior prep that varies by condition. |
| Move and cover furniture | room | Say whether you move it or the customer does. |
| Wallpaper removal | sq ft | Price separately; condition varies. |
| Lead-safe work practices | each | For homes built before 1978, where federal rules apply to disturbing paint. |
Terms and deposit language for painting
- Deposit. A deposit at signing reserves the dates and covers the paint order. On short interior jobs some painters take none. Check your state's rules on home improvement deposits.
- Payment. Balance due when the walk-through is done and touch-ups are finished. Larger exterior jobs can split payment at the halfway point.
- Warranty. State how long you cover peeling or flaking from your workmanship, and that it does not cover damage, moisture problems or surfaces you advised against painting.
- Colors are confirmed in writing before paint is bought; changing a color after purchase is a change order.
- Exterior work depends on weather; say how a rain day moves the schedule.
- Furniture moving, wall hangings and outlet covers: say who handles each.
How to fill it in
- Put in the original estimate number and amount.
- Write what changed in the reason box, plainly.
- Add the new work; type a minus quantity for any credit.
- Fill in the days added.
- Print it for a signature on site, or send it from Koira to sign by phone.
Free tools for painting
The same change order for other trades: appliance repair, auto detailing, carpet cleaning, chimney, house cleaning, commercial cleaning, concrete, drywall, electrical, fence, flooring, garage door, general contractor, gutter, handyman, hvac, irrigation, junk removal, landscaping, lawn care, locksmith, moving, pest control, plumbing, pool service, pressure washing, remodeling, roofing, septic, snow removal, solar, tree service, waterproofing, window cleaning.