Free deck change order template

A deck change order for a bigger footprint, an added stair, a railing upgrade, or rot found in the old framing you were reusing.

FreeNo email, no sign-up
3 linesFilled in for deck
PDF, Word, CSVPrint or download
Your business
Logo
Kept in this browser for your next document. It is not uploaded.
Optional. Add it if your trade is licensed where you work.
Customer
Change order details
Line items
A credit for work taken out: type the quantity as a minus number.
DescriptionQtyUnitPrice
qty
$
qty
$
qty
$
$
%
Leave at 0 if your work is not taxed where you are.
Change total
$0.00
Change order, Change to deck
$0.00This change
$0.00Tax
3Lines to price
Kept in this browser only. Nothing you type here goes to Koira unless you tap Customize and send. The CSV opens in Google Sheets and Excel. In the print window, pick Save as PDF.
Your business name

Change order

Number
CO-1001
CustomerCustomer name
JobChange to deck
DescriptionQtyUnitPriceAmount
Add stairs to yard side4each
Upgrade stair railing to aluminum12ft
Credit: skirting-72ft
This change
$0.00
Change total
$0.00
3 lines have no price yet
Reason for the change
Second stair added by owner. Skirting dropped.
Terms
This change order amends the estimate. Due with the final payment.
Approved by (customer signature)
Contractor
Date

What a deck change order is for

Deck changes are tempting once the owner sees the frame: a few more feet, a second stair, better railing. Each changes material, labor and sometimes the permit. A signed change order with the new total, before you cut, keeps the invoice clean and the inspector's drawings current.

What to put on a deck change order

  • Footprint or detail that changed.
  • Added material and labor.
  • Whether the permit needs revising.
  • Credits.
  • New total and signature.

A worked example

The owner adds a second stair to the yard, upgrades the stair railing to aluminum, and drops the skirting.

LineQtyUnitPrice
Add stairs to yard side4eachYour price
Upgrade stair railing to aluminum12ftYour price
Credit: skirting-72ftYour price

If a change alters the footprint or height, check whether the permit drawing needs a revision before you build it.

Line items deck builders use

Line itemUnitHow to write it
Footings, dug and pouredeachDepth to your local frost line and the inspector's rule.
Framing: posts, beams and joistssq ftLumber grade and joist spacing.
Ledger with flashingftAttached to the house with the fasteners code calls for.
Decking, pressure-treatedsq ftBoard width and fastening.
Decking, compositesq ftBrand, color and hidden or face fasteners.
RailingftWood, composite, aluminum or cable.
StairseachPer step; width and landing.
Tear-out of old decksq ftDemolition and haul-off.
Post caps and lightingeachLow voltage or solar.
Skirting or latticeftAround the base.
Permit and inspectionseachFooting, framing and final.
Stain and sealsq ftFor wood decks, after the wood is ready.

Terms and deposit language for deck

  • Deposit. The deposit at signing orders lumber or composite and books the build week. Each state sets its own deposit limits on home improvement work.
  • Payment. Balance due at the final inspection or when the deck is finished and walked.
  • Warranty. You warrant the framing and your workmanship for a stated time. The decking maker warrants the boards. Normal checking, warping and weathering of wood are not defects.
  • Permit and inspection dates are set by the town and can move the schedule.
  • Buried lines and sprinkler pipe at footing locations are the owner's to have marked.
  • Pressure-treated wood needs time to dry before stain; the timing is in the notes.

How to fill it in

  1. Put in the original estimate number and amount.
  2. Write what changed in the reason box, plainly.
  3. Add the new work; type a minus quantity for any credit.
  4. Fill in the days added.
  5. Print it for a signature on site, or send it from Koira to sign by phone.

Free tools for deck

The same change order for other trades: appliance repair, auto detailing, carpentry, carpet cleaning, chimney, house cleaning, commercial cleaning, concrete, drywall, duct cleaning, electrical, fence, flooring, garage door, general contractor, glass, gutter, handyman, holiday lighting, home inspection, hood cleaning, hvac, insulation, irrigation, junk removal, landscaping, lawn care, locksmith, masonry, moving, painting, pest control, plumbing, pool service, pressure washing, property maintenance, remodeling, restoration, roofing, security system, septic, siding, snow removal, solar, tile, tree service, water treatment, waterproofing, window cleaning, window and door.

More for deck builders: how deck builders run on Koira.

FAQ

When does a deck need a change order?

When the footprint, stairs, railing or material changes, or old framing you planned to reuse turns out to be rotten.

Does a deck change affect the permit?

It can. A bigger footprint or a new stair may need a revised drawing. Check with the building department before you build it.

How do I credit dropped skirting?

Enter the skirting as a credit with a minus quantity, and the change order shows the lower total.

What if reused framing is rotten?

Photograph it, price the replacement on a change order and get the signature before you tear it out.

We know what works. Leave it to Koira.

☼⚙
Standard⚡ Turbo
● Koira did it● You by hand
Today $9,300$8,100 / $1,200
This week $25,050$18,570 / $6,480
This month $69,300$46,150 / $23,150
Money, just now
Reminded Sean Love, $1,850. Polite reminder with the pay link.
Bids, 9:44 am
Nudged Dana on the kitchen bid. Day 3 follow up. She opened it at 9:12.
Convos, 9:41 am
Texted back a missed call. Walk through booked Thu 10:00.
Free Deck Change Order Template (PDF and Word) | Koira