What a deck receipt is for
Deck season is short, and a deposit is how an owner holds a spring build week. A receipt with the build week, the material ordered and the balance makes that hold feel real. The final receipt sits in the house file next to the permit, which is what a buyer's inspector looks for.
What to put on a deck receipt
- How much was paid, when, and the way it was paid.
- Deck size and material.
- Deposit, stage or final.
- What is left to pay.
A worked example
The owner paid the deposit to hold a May build week. Enter it in Amount received.
| Line | Qty | Unit | Price | Amount |
|---|---|---|---|---|
| Decking and framing materials, pressure-treated pine * | 320 | sq ft | $4.50 | $1,440.00 |
| Deck build labor * | 320 | sq ft | $25.00 | $8,000.00 |
| Total before tax | $9,440.00 |
Put the build week and the permit status in the notes.
* Typical price from our free deck cost calculator, which lists its sources. Your own costs and market come first.
Line items deck builders use
| Line item | Unit | How to write it |
|---|---|---|
| Footings, dug and poured | each | Depth to your local frost line and the inspector's rule. |
| Framing: posts, beams and joists | sq ft | Lumber grade and joist spacing. |
| Ledger with flashing | ft | Attached to the house with the fasteners code calls for. |
| Decking, pressure-treated | sq ft | Board width and fastening. |
| Decking, composite | sq ft | Brand, color and hidden or face fasteners. |
| Railing | ft | Wood, composite, aluminum or cable. |
| Stairs | each | Per step; width and landing. |
| Tear-out of old deck | sq ft | Demolition and haul-off. |
| Post caps and lighting | each | Low voltage or solar. |
| Skirting or lattice | ft | Around the base. |
| Permit and inspections | each | Footing, framing and final. |
| Stain and seal | sq ft | For wood decks, after the wood is ready. |
Terms and deposit language for deck
- Deposit. The deposit at signing orders lumber or composite and books the build week. Each state sets its own deposit limits on home improvement work.
- Payment. Balance due at the final inspection or when the deck is finished and walked.
- Warranty. You warrant the framing and your workmanship for a stated time. The decking maker warrants the boards. Normal checking, warping and weathering of wood are not defects.
- Permit and inspection dates are set by the town and can move the schedule.
- Buried lines and sprinkler pipe at footing locations are the owner's to have marked.
- Pressure-treated wood needs time to dry before stain; the timing is in the notes.
How to fill it in
- Fill in who paid and which job or invoice the payment is for.
- Check the lines; they show what the payment covers.
- Pick how they paid and add the check or reference number.
- Type the amount received, or leave it blank when it pays the whole total.
- Print it, download it, or hand it over as a PDF.
Free tools for deck
The same receipt for other trades: appliance repair, auto detailing, carpentry, carpet cleaning, chimney, house cleaning, commercial cleaning, concrete, drywall, duct cleaning, electrical, fence, flooring, garage door, general contractor, glass, gutter, handyman, holiday lighting, home inspection, hood cleaning, hvac, insulation, irrigation, junk removal, landscaping, lawn care, locksmith, masonry, moving, painting, pest control, plumbing, pool service, pressure washing, property maintenance, remodeling, restoration, roofing, security system, septic, siding, snow removal, solar, tile, tree service, water treatment, waterproofing, window cleaning, window and door.