Free carpentry receipt template

A carpentry receipt for a deposit, a stage payment or a finished job, with the work and address so the owner has a record.

FreeNo email, no sign-up
2 linesFilled in for carpentry
PDF, Word, CSVPrint or download
Your business
Logo
Kept in this browser for your next document. It is not uploaded.
Optional. Add it if your trade is licensed where you work.
Received from
Receipt details
Line items
DescriptionQtyUnitPrice
qty
$
qty
$
%
Leave at 0 if your work is not taxed where you are.
$
$
Leave blank when this pays the whole total.
Total
$3,125.00
Receipt, Cabinet install deposit
$3,125.00Subtotal
$0.00Tax
1Line to price
Kept in this browser only. Nothing you type here goes to Koira unless you tap Customize and send. The CSV opens in Google Sheets and Excel. In the print window, pick Save as PDF.
Your business name

Receipt

Number
R-1001
Received fromCustomer name
JobCabinet install deposit
Paid by
Check
DescriptionQtyUnitPriceAmount
Install kitchen cabinets (cabinets by owner)25ft$125.00$3,125.00
Install crown molding, dining room48ft
Subtotal
$3,125.00
Total
$3,125.00
Amount received
$3,125.00
Balance
Paid in full
1 line has no price yet
Notes
Deposit received. Install scheduled after cabinet delivery.
Terms
Balance due at sign-off.

What a carpentry receipt is for

A deposit on a cabinet install often sits for weeks while cabinets ship. A receipt that names the job, the planned install week and the balance keeps the owner calm through that wait. On the final payment, it is the record of who hung the cabinets, which matters to the owner if a hinge or drawer slide fails later.

What to put on a carpentry receipt

  • What was paid, on which day, by card, check or transfer.
  • The job and the address.
  • Deposit, stage or final payment.
  • Balance remaining, if any.

A worked example

The owner paid the cabinet install deposit by bank transfer. Enter it in Amount received.

LineQtyUnitPriceAmount
Install kitchen cabinets (cabinets by owner) *25ft$125.00$3,125.00
Install crown molding, dining room48ftYour price

Put the expected cabinet delivery week in the notes so the owner can see the plan.

* Typical price from our free cabinet installation cost calculator, which lists its sources. Your own costs and market come first.

Line items carpenters use

Line itemUnitHow to write it
Install crown moldingftProfile, paint or stain grade, and inside and outside corners.
Install baseboardftHeight and whether shoe molding is included.
Door casing, both sideseachPer door; casing profile and head detail.
Hang interior door, prehungeachSwing, size and hardware.
Install kitchen cabinetsftLinear feet of run; uppers and bases counted once.
Cabinet hardwareeachPulls and knobs, drilled from a template.
Built-in shelvingftShelf depth, material and finish.
Wainscoting or panel moldingsq ftStyle and height on the wall.
Window casing and stooleachPer window; apron and stool style.
Material, paint-grade trimftFrom your supplier with markup.
Fill, caulk and prep for painthourSay whether painting is yours or the painter's.
Haul away old trim and doorsloadDisposal of what comes out.

Terms and deposit language for carpentry

  • Deposit. A deposit at signing pays for the trim, doors or cabinet hardware ordered for this house. Deposit limits for home improvement work are set by each state, so check yours.
  • Payment. Balance due when the punch list is walked and signed off, or in stages on larger jobs.
  • Warranty. Stand behind joints that open from poor fastening and doors that will not latch because of the install. Seasonal movement in wood and gaps from house settling are not install defects.
  • Old houses are rarely square; scribing and shimming are part of the price shown.
  • Painting, stain and touch-up are listed when they are included, and are the owner's or painter's otherwise.
  • Cabinets and doors supplied by the owner are checked for damage at delivery, not at install.

How to fill it in

  1. Fill in who paid and which job or invoice the payment is for.
  2. Check the lines; they show what the payment covers.
  3. Pick how they paid and add the check or reference number.
  4. Type the amount received, or leave it blank when it pays the whole total.
  5. Print it, download it, or hand it over as a PDF.

Free tools for carpentry

The same receipt for other trades: appliance repair, auto detailing, carpet cleaning, chimney, house cleaning, commercial cleaning, concrete, deck, drywall, duct cleaning, electrical, fence, flooring, garage door, general contractor, glass, gutter, handyman, holiday lighting, home inspection, hood cleaning, hvac, insulation, irrigation, junk removal, landscaping, lawn care, locksmith, masonry, moving, painting, pest control, plumbing, pool service, pressure washing, property maintenance, remodeling, restoration, roofing, security system, septic, siding, snow removal, solar, tile, tree service, water treatment, waterproofing, window cleaning, window and door.

More for carpenters: how carpenters run on Koira.

FAQ

Should carpenters give deposit receipts?

Yes, with the job, the planned start and the balance. Owners waiting on cabinets to ship like proof that their date is held.

What goes on a carpentry receipt?

The address, the date, the trim or cabinet work, the amount paid, how it was paid and whatever balance is still owed.

Why does a receipt matter after a cabinet install?

If a hinge or slide fails, the owner needs to know who installed it and when. The receipt is that record.

Can I send a carpentry receipt before I leave?

Text a PDF from your phone before you leave, or let Koira send it when you mark the payment received.

We know what works. Leave it to Koira.

☼⚙
Standard⚡ Turbo
● Koira did it● You by hand
Today $9,300$8,100 / $1,200
This week $25,050$18,570 / $6,480
This month $69,300$46,150 / $23,150
Money, just now
Reminded Sean Love, $1,850. Polite reminder with the pay link.
Bids, 9:44 am
Nudged Dana on the kitchen bid. Day 3 follow up. She opened it at 9:12.
Convos, 9:41 am
Texted back a missed call. Walk through booked Thu 10:00.
Free Carpentry Receipt Template (PDF and Word) | Koira