Free carpentry service agreement template

A carpentry service agreement for property managers and homeowners: a yearly walkthrough of doors, trim and cabinets with small adjustments included.

FreeNo email, no sign-up
3 linesFilled in for carpentry
PDF, Word, CSVPrint or download
Your business
Logo
Kept in this browser for your next document. It is not uploaded.
Optional. Add it if your trade is licensed where you work.
Customer
Service agreement details
What each year includes
DescriptionQtyUnitPrice
qty
$
qty
$
qty
$
%
Leave at 0 if your work is not taxed where you are.
$
Plan price per year
$0.00
Service agreement, Carpentry upkeep plan
$0.00Subtotal
$0.00Tax
3Lines to price
This is a template, not legal advice. Check your state's rules before you use it.
Kept in this browser only. Nothing you type here goes to Koira unless you tap Customize and send. The CSV opens in Google Sheets and Excel. In the print window, pick Save as PDF.
Your business name

Service agreement

Number
SA-1001
CustomerCustomer name
JobCarpentry upkeep plan
How it is billed
Yearly, up front
DescriptionQtyUnitPriceAmount
Yearly walkthrough per unit8visit
Door and cabinet adjustments, up to plan limit8hour
Replacement hinges and slides, at cost1set
Subtotal
$0.00
Plan price per year
$0.00
3 lines have no price yet
Notes
Visits arranged with the property manager with notice to tenants.
Terms, renewal and cancellation
Twelve months from the start date. Either side may cancel in writing.
Customer signature
Contractor
Date

What a carpentry service agreement is for

Doors drift, cabinet doors sag, trim opens at the corners as a house moves through the seasons. Property managers with many units and owners of older homes like a set visit that keeps everything closing and lined up. It is steady work between bigger jobs, and you are the first call when they remodel.

What to put on a carpentry service agreement

  • Units, rooms or homes covered.
  • Door, cabinet and trim adjustments included.
  • The limit on included time.
  • What is quoted separately.
  • Visit timing and notice.
  • Price, billing and cancellation.

A worked example

A property manager with eight rental units wants doors and cabinets checked once a year.

LineQtyUnitPrice
Yearly walkthrough per unit8visitYour price
Door and cabinet adjustments, up to plan limit8hourYour price
Replacement hinges and slides, at cost1setYour price

Replacing doors or cabinets is quoted on its own. This is a template, not legal advice; check your state's rules before you sign it.

Line items carpenters use

Line itemUnitHow to write it
Install crown moldingftProfile, paint or stain grade, and inside and outside corners.
Install baseboardftHeight and whether shoe molding is included.
Door casing, both sideseachPer door; casing profile and head detail.
Hang interior door, prehungeachSwing, size and hardware.
Install kitchen cabinetsftLinear feet of run; uppers and bases counted once.
Cabinet hardwareeachPulls and knobs, drilled from a template.
Built-in shelvingftShelf depth, material and finish.
Wainscoting or panel moldingsq ftStyle and height on the wall.
Window casing and stooleachPer window; apron and stool style.
Material, paint-grade trimftFrom your supplier with markup.
Fill, caulk and prep for painthourSay whether painting is yours or the painter's.
Haul away old trim and doorsloadDisposal of what comes out.

Terms and deposit language for carpentry

  • Deposit. A deposit at signing pays for the trim, doors or cabinet hardware ordered for this house. Deposit limits for home improvement work are set by each state, so check yours.
  • Payment. Balance due when the punch list is walked and signed off, or in stages on larger jobs.
  • Warranty. Stand behind joints that open from poor fastening and doors that will not latch because of the install. Seasonal movement in wood and gaps from house settling are not install defects.
  • Old houses are rarely square; scribing and shimming are part of the price shown.
  • Painting, stain and touch-up are listed when they are included, and are the owner's or painter's otherwise.
  • Cabinets and doors supplied by the owner are checked for damage at delivery, not at install.
This is a template, not legal advice. Check your state's rules before you use it.

How to fill it in

  1. Fill in the customer and the start and end dates.
  2. List what each visit includes and how many visits a year.
  3. Add your price per line; the plan shows a yearly total, and a monthly figure if billed monthly.
  4. Fill in what is not covered and the renewal and cancellation terms.
  5. Check your state's rules, then print it for signatures.

Free tools for carpentry

The same service agreement for other trades: appliance repair, auto detailing, carpet cleaning, chimney, house cleaning, commercial cleaning, concrete, deck, drywall, duct cleaning, electrical, fence, flooring, garage door, general contractor, glass, gutter, handyman, holiday lighting, home inspection, hood cleaning, hvac, insulation, irrigation, junk removal, landscaping, lawn care, locksmith, masonry, moving, painting, pest control, plumbing, pool service, pressure washing, property maintenance, remodeling, restoration, roofing, security system, septic, siding, snow removal, solar, tile, tree service, water treatment, waterproofing, window cleaning, window and door.

More for carpenters: how carpenters run on Koira.

FAQ

What does a carpentry upkeep plan include?

A yearly walkthrough with door, cabinet and trim adjustments up to a set time limit. Replacements and remodels are quoted separately.

Who buys carpentry maintenance?

Property managers with many units, landlords and owners of older homes where doors and trim move with the seasons.

How do I limit included work?

Set hours per visit or per unit in the agreement, and price time beyond that at your normal rate.

Is this carpentry agreement legal advice?

No. It is a template to start from. Check your state's rules and have it reviewed before you use it.

We know what works. Leave it to Koira.

☼⚙
Standard⚡ Turbo
● Koira did it● You by hand
Today $9,300$8,100 / $1,200
This week $25,050$18,570 / $6,480
This month $69,300$46,150 / $23,150
Money, just now
Reminded Sean Love, $1,850. Polite reminder with the pay link.
Bids, 9:44 am
Nudged Dana on the kitchen bid. Day 3 follow up. She opened it at 9:12.
Convos, 9:41 am
Texted back a missed call. Walk through booked Thu 10:00.
Free Carpentry Service Agreement Template (PDF and Word) | Koira