Free deck invoice template

A deck invoice at the final inspection: framing, decking, railing and stairs as built, the deposit taken off and any upgrade the owner added.

FreeNo email, no sign-up
5 linesFilled in for deck
PDF, Word, CSVPrint or download
Your business
Logo
Kept in this browser for your next document. It is not uploaded.
Optional. Add it if your trade is licensed where you work.
Bill to
Invoice details
Line items
DescriptionQtyUnitPrice
qty
$
qty
$
qty
$
qty
$
qty
$
%
Leave at 0 if your work is not taxed where you are.
$
$
Total
$11,352.50
Invoice, New pressure-treated deck off the kitchen
$11,352.50Subtotal
$0.00Paid
1Line to price
Kept in this browser only. Nothing you type here goes to Koira unless you tap Customize and send. The CSV opens in Google Sheets and Excel. In the print window, pick Save as PDF.
Your business name

Invoice

Number
1001
Bill toCustomer name
JobNew pressure-treated deck off the kitchen
DescriptionQtyUnitPriceAmount
Decking and framing materials, pressure-treated pine320sq ft$4.50$1,440.00
Deck build labor320sq ft$25.00$8,000.00
Wood railing40ft$45.00$1,800.00
Deck stairs3each$37.50$112.50
Post cap lights, added2each
Subtotal
$11,352.50
Total
$11,352.50
1 line has no price yet
Notes
Final inspection passed on the date noted. Post cap lights added at owner's request.
Payment terms
Balance due at final inspection. Card, check or bank transfer.

What a deck invoice is for

The deck invoice is read with a glass of something cold on the new boards. Make it match the estimate, list the extra step or lighting the owner asked for with its approval, and note the passed final inspection. That closes the job and gives the owner a record for the house file.

What to put on a deck invoice

  • Each part of the deck, as built.
  • Upgrades with their approval.
  • The final inspection result and date.
  • Deposit already paid and what remains.
  • Stain timing for wood decks.

A worked example

The deck passed final inspection. The owner added two post cap lights after framing.

LineQtyUnitPriceAmount
Decking and framing materials, pressure-treated pine *320sq ft$4.50$1,440.00
Deck build labor *320sq ft$25.00$8,000.00
Wood railing *40ft$45.00$1,800.00
Deck stairs *3each$37.50$112.50
Post cap lights, added2eachYour price

Write the final inspection date in the notes. It is the line the owner will need when they sell.

* Typical price from our free deck cost calculator, which lists its sources. Your own costs and market come first.

Line items deck builders use

Line itemUnitHow to write it
Footings, dug and pouredeachDepth to your local frost line and the inspector's rule.
Framing: posts, beams and joistssq ftLumber grade and joist spacing.
Ledger with flashingftAttached to the house with the fasteners code calls for.
Decking, pressure-treatedsq ftBoard width and fastening.
Decking, compositesq ftBrand, color and hidden or face fasteners.
RailingftWood, composite, aluminum or cable.
StairseachPer step; width and landing.
Tear-out of old decksq ftDemolition and haul-off.
Post caps and lightingeachLow voltage or solar.
Skirting or latticeftAround the base.
Permit and inspectionseachFooting, framing and final.
Stain and sealsq ftFor wood decks, after the wood is ready.

Terms and deposit language for deck

  • Deposit. The deposit at signing orders lumber or composite and books the build week. Each state sets its own deposit limits on home improvement work.
  • Payment. Balance due at the final inspection or when the deck is finished and walked.
  • Warranty. You warrant the framing and your workmanship for a stated time. The decking maker warrants the boards. Normal checking, warping and weathering of wood are not defects.
  • Permit and inspection dates are set by the town and can move the schedule.
  • Buried lines and sprinkler pipe at footing locations are the owner's to have marked.
  • Pressure-treated wood needs time to dry before stain; the timing is in the notes.

How to fill it in

  1. Your business details carry over from any template you used before.
  2. Fill in who you are billing and the job.
  3. Check the lines against what you actually did, and add your prices.
  4. Put any deposit in Already paid, so the balance is right.
  5. Print, download or send it from Koira with a pay-by-card link.

Free tools for deck

The same invoice for other trades: appliance repair, auto detailing, carpentry, carpet cleaning, chimney, house cleaning, commercial cleaning, concrete, drywall, duct cleaning, electrical, fence, flooring, garage door, general contractor, glass, gutter, handyman, holiday lighting, home inspection, hood cleaning, hvac, insulation, irrigation, junk removal, landscaping, lawn care, locksmith, masonry, moving, painting, pest control, plumbing, pool service, pressure washing, property maintenance, remodeling, restoration, roofing, security system, septic, siding, snow removal, solar, tile, tree service, water treatment, waterproofing, window cleaning, window and door.

More for deck builders: how deck builders run on Koira.

FAQ

What should a deck invoice include?

Framing, decking, railing and stairs as built, any added items with approval, the final inspection date, the deposit paid and the balance.

When should a deck builder be paid?

At the final inspection or the walkthrough, with a deposit at signing and a stage payment on larger decks.

How do I invoice lighting added mid-job?

As its own line with the date the owner approved it, or by referencing the signed change order.

Why note the inspection on the invoice?

Buyers and their inspectors ask whether a deck was permitted. The invoice with the final date answers it years later.

We know what works. Leave it to Koira.

☼⚙
Standard⚡ Turbo
● Koira did it● You by hand
Today $9,300$8,100 / $1,200
This week $25,050$18,570 / $6,480
This month $69,300$46,150 / $23,150
Money, just now
Reminded Sean Love, $1,850. Polite reminder with the pay link.
Bids, 9:44 am
Nudged Dana on the kitchen bid. Day 3 follow up. She opened it at 9:12.
Convos, 9:41 am
Texted back a missed call. Walk through booked Thu 10:00.
Free Deck Invoice Template (PDF and Word) | Koira