Free roofing invoice template

A roofing invoice that lists the squares installed, the decking you actually replaced and the deposit already paid, so the balance is clear. Print it or save it as a PDF in a minute.

FreeNo email, no sign-up
5 linesFilled in for roofing
PDF, Word, CSVPrint or download
Your business
Logo
Kept in this browser for your next document. It is not uploaded.
Optional. Add it if your trade is licensed where you work.
Bill to
Invoice details
Line items
DescriptionQtyUnitPrice
qty
$
qty
$
qty
$
qty
$
qty
$
%
Leave at 0 if your work is not taxed where you are.
$
$
Total
$13,782.25
Invoice, Reroof, architectural shingles
$13,782.25Subtotal
$0.00Paid
3Lines to price
Kept in this browser only. Nothing you type here goes to Koira unless you tap Customize and send. The CSV opens in Google Sheets and Excel. In the print window, pick Save as PDF.
Your business name

Invoice

Number
1001
Bill toCustomer name
JobReroof, architectural shingles
DescriptionQtyUnitPriceAmount
Architectural asphalt roof, installed1901sq ft$5.25$9,980.25
Tear off 1 old layer and haul away1901sq ft$2.00$3,802.00
Replaced rotted decking, 7/16 OSB4each
Pipe boots3each
Dumpster and disposal1each
Subtotal
$13,782.25
Total
$13,782.25
3 lines have no price yet
Notes
Thank you for having us on your roof. Your workmanship warranty certificate and the shingle registration are attached.
Payment terms
Balance due on completion. We take card, check and ACH. If an insurance check is coming, the balance is due within a few days of it arriving.

What a roofing invoice is for

The roofing invoice is where the estimate meets what happened on the roof. The square count may have changed, the decking count is now known, and the deposit has to come off. An invoice that shows each of those plainly gets paid at the tailgate. One that shows a single number invites the customer to call the insurance adjuster first.

What to put on a roofing invoice

  • The estimate number it follows, so the customer can lay the two side by side.
  • Squares installed and the layers torn off, as built.
  • The real count of decking sheets replaced, at the price agreed on the estimate.
  • Any change orders signed during the job, each on its own line.
  • The deposit received, taken off before the balance.
  • How to pay, the due date, and the claim number if insurance is involved.

A worked example

The 19-square reroof from the estimate is done. At tear-off the crew found four bad sheets of decking, which the homeowner looked at and approved. The deposit was paid at signing. Shingle and tear-off lines carry the calculator's typical prices; your decking price goes on its line.

LineQtyUnitPriceAmount
Architectural asphalt roof, installed *1,901sq ft$5.25$9,980.25
Tear off 1 old layer and haul away *1,901sq ft$2.00$3,802.00
Replaced rotted decking, 7/16 OSB4eachYour price
Pipe boots3eachYour price
Dumpster and disposal1eachYour price

Put the deposit in the Already paid box and the balance works itself out. The decking line now shows the real count, four, at the price the customer already saw. Nothing on this invoice should be a number they have not seen before.

* Typical price from our free roof replacement cost calculator, which lists its sources. Your own costs and market come first.

Line items roofers use

Line itemUnitHow to write it
Tear off existing shingles and haul awaysquareSay how many layers. A second layer is more labor and more dump weight.
Architectural asphalt shingles, installedsquareName the brand, line and color so the customer knows what they are getting.
Synthetic underlaymentsquareCovers the whole deck under the shingles.
Ice and water shield at eaves and valleysftMeasured along the eaves and valleys, or by the roll.
Drip edgeftEaves and rakes. Pick the color to match the gutters or fascia.
Starter stripftAlong the eaves and rakes, under the first course.
Ridge cap shinglesftAlong every ridge and hip.
Ridge ventftOnly where the attic has intake at the soffits to match it.
Replace rotted roof deckingeachPer sheet of plywood or OSB. Price it per sheet up front; you only know the count after tear-off.
Pipe boots and vent flashingeachCount every plumbing vent and exhaust that comes through the roof.
Step and counter flashing at walls and chimneyftSay whether you reuse or replace it.
Dumpster and disposaleachOne line, or fold it into tear-off. Do not count it twice.
Permit and inspectioneachPass the city's fee through at cost, or say it is included.
Roof repair laborhourFor leak calls and small repairs, priced by the hour plus materials.

Terms and deposit language for roofing

  • Deposit. A deposit is due when the customer signs, so the shingles and underlayment can be ordered and the job put on the calendar. Some states cap how much you can take up front on home improvement work, so check yours before you set it.
  • Payment. The balance is due when the roof is finished and the yard is cleaned up. If the customer is paying through an insurance claim, say who pays the deductible and when the insurance check is signed over.
  • Warranty. Say two things separately: the shingle maker's warranty on the material, and your own warranty on the workmanship, with how many years each runs and what voids it.
  • Rotted decking found at tear-off is replaced at the per-sheet price on the estimate, and the customer is shown the boards before you close them up.
  • Weather can move the start date. Say how you will tell the customer and that a tarp goes on any open section at the end of each day.
  • Say who handles the permit and who is home for the inspection.

How to fill it in

  1. Your business details carry over from any template you used before.
  2. Fill in who you are billing and the job.
  3. Check the lines against what you actually did, and add your prices.
  4. Put any deposit in Already paid, so the balance is right.
  5. Print, download or send it from Koira with a pay-by-card link.

Free tools for roofing

The same invoice for other trades: appliance repair, auto detailing, carpet cleaning, chimney, house cleaning, commercial cleaning, concrete, drywall, electrical, fence, flooring, garage door, general contractor, gutter, handyman, hvac, irrigation, junk removal, landscaping, lawn care, locksmith, moving, painting, pest control, plumbing, pool service, pressure washing, remodeling, septic, snow removal, solar, tree service, waterproofing, window cleaning.

More for roofers: how roofers run on Koira.

FAQ

When should a roofer send the final invoice?

The day the roof is finished and the yard is clean, ideally while you are still on site and the customer can walk around and look. The longer an invoice waits, the more it competes with every other bill in the house.

How do I invoice a roof paid by insurance?

Address the invoice to the homeowner, put the claim number and the insurance company on it, and list the work in the same terms as the adjuster's scope where you can. Say plainly who owes the deductible. The homeowner usually signs the insurance check over or pays you from it.

Should the invoice show the deposit?

Yes. Show the full total, then the deposit received, then the balance due. A customer who sees only the balance may not realize the deposit was counted, and a customer who sees only the total may think you forgot it.

What if the job used more shingles than the estimate?

If the scope did not change and you simply ordered more, that is usually yours to eat. If the customer asked for more, or the roof was bigger than measured, it should have gone on a signed change order before the invoice. Then the invoice just lists it.

We know what works. Leave it to Koira.

☼⚙
Standard⚡ Turbo
● Koira did it● You by hand
Today $9,300$8,100 / $1,200
This week $25,050$18,570 / $6,480
This month $69,300$46,150 / $23,150
Money, just now
Reminded Sean Love, $1,850. Polite reminder with the pay link.
Bids, 9:44 am
Nudged Dana on the kitchen bid. Day 3 follow up. She opened it at 9:12.
Convos, 9:41 am
Texted back a missed call. Walk through booked Thu 10:00.
Free Roofing Invoice Template (PDF and Word) | Koira