What a drywall invoice is for
Drywall jobs are often billed in stages, hang then finish, and the customer wants to see which stage they are paying for and what came before. On repairs, the invoice should list each patch so the customer can walk the house and check them off.
What to put on a drywall invoice
- The stage or the full scope.
- Area hung and finished.
- Patches or repairs, each listed.
- Extras approved on site.
- Payments received and the balance.
A worked example
The basement finish stage is complete. The owner added two closet interiors while the crew was there. The hang stage was paid already.
| Line | Qty | Unit | Price |
|---|---|---|---|
| Tape and finish, smooth | 2,420 | sq ft | Your price |
| Corner bead | 160 | ft | Your price |
| Closet interiors, added on site | 2 | each | Your price |
| Haul away scrap | 1 | load | Your price |
Put the hang stage payment in Already paid. The closets carry a note that the owner added them, so the extra is no surprise.
Line items drywall contractors use
| Line item | Unit | How to write it |
|---|---|---|
| Hang drywall | sq ft | Board thickness and type: regular, moisture resistant, fire rated. |
| Tape and finish | sq ft | Level of finish; say which surfaces get a higher level. |
| Hang, tape and finish, combined | sq ft | For smaller jobs priced as one. |
| Ceiling drywall | sq ft | Ceilings take more labor than walls. |
| Corner bead | ft | Metal or paper-faced, outside corners. |
| Texture, knockdown or orange peel | sq ft | Match existing where patching. |
| Skim coat | sq ft | Over damaged or textured walls for a smooth finish. |
| Drywall patch, small | each | Holes up to a size you set. |
| Drywall patch, large or water damage | each | Cut out and replace a section. |
| Popcorn ceiling removal | sq ft | Test older ceilings for asbestos before disturbing them. |
| Prime for paint | sq ft | If painting is not by others. |
| Protect floors and furniture, cleanup | room | Dust control matters on occupied jobs. |
| Haul away scrap | load | Offcuts and old board. |
Terms and deposit language for drywall
- Deposit. A deposit at signing covers board and mud and holds the crew. Rules on how much you may collect up front differ by state, so look yours up.
- Payment. Larger jobs split at hang complete and finish complete; small repairs are due on completion.
- Warranty. Say how long you cover cracks and nail pops from your workmanship, and that settling, framing movement and water damage are not covered.
- Finish level and texture are agreed in writing before work starts.
- Painting is by others unless listed; primer is included only if listed.
- Ceilings in older homes may contain asbestos; testing is required before disturbing them, and abatement is by licensed others.
How to fill it in
- Your business details carry over from any template you used before.
- Fill in who you are billing and the job.
- Check the lines against what you actually did, and add your prices.
- Put any deposit in Already paid, so the balance is right.
- Print, download or send it from Koira with a pay-by-card link.
Free tools for drywall
The same invoice for other trades: appliance repair, auto detailing, carpet cleaning, chimney, house cleaning, commercial cleaning, concrete, electrical, fence, flooring, garage door, general contractor, gutter, handyman, hvac, irrigation, junk removal, landscaping, lawn care, locksmith, moving, painting, pest control, plumbing, pool service, pressure washing, remodeling, roofing, septic, snow removal, solar, tree service, waterproofing, window cleaning.