Free general contractor invoice template

A general contractor progress invoice by milestone or schedule of values, with change orders, payments to date and retainage if agreed.

FreeNo email, no sign-up
2 linesFilled in for general contractor
PDF, Word, CSVPrint or download
Your business
Logo
Kept in this browser for your next document. It is not uploaded.
Optional. Add it if your trade is licensed where you work.
Bill to
Invoice details
Line items
DescriptionQtyUnitPrice
qty
$
qty
$
%
Leave at 0 if your work is not taxed where you are.
$
$
Total
$0.00
Invoice, Rear addition, framing milestone
$0.00Subtotal
$0.00Paid
2Lines to price
Kept in this browser only. Nothing you type here goes to Koira unless you tap Customize and send. The CSV opens in Google Sheets and Excel. In the print window, pick Save as PDF.
Your business name

Invoice

Number
1001
Bill toCustomer name
JobRear addition, framing milestone
DescriptionQtyUnitPriceAmount
Milestone: framed, dried in, rough inspections passed1each
Change order 1: upgraded windows1each
Subtotal
$0.00
Total
$0.00
2 lines have no price yet
Notes
Contract total, change orders and payments to date listed below. Next milestone: drywall complete.
Payment terms
Due within the days stated in our contract.

What a general contractor invoice is for

GC invoices run over months, often against a construction loan with its own inspections. Each invoice should show the milestone or percentage complete, change orders, payments to date, any retainage and the amount due now, so the owner and the lender see the same picture.

What to put on a general contractor invoice

  • Milestone or percent complete.
  • Contract total and change orders.
  • Payments to date.
  • Retainage held, if agreed.
  • Amount due now.

A worked example

The addition is framed, dried in and the rough inspections passed. This invoice is the framing milestone with the first change order.

LineQtyUnitPrice
Milestone: framed, dried in, rough inspections passed1eachYour price
Change order 1: upgraded windows1eachYour price

Our schedule of values template fits larger jobs billed by percentage. For milestone billing, list the running totals in the notes.

Line items general contractors use

Line itemUnitHow to write it
General conditionsmonthSupervision, temporary facilities, insurance and site costs for the job's duration.
Site work and excavationeachClearing, digging and grading.
FoundationeachFootings, walls or slab per plan.
FramingeachWalls, floors and roof structure.
RoofingsquareBy subcontractor; material and warranty.
Windows and exterior doorseachAllowance or specified models.
Plumbing, by licensed subcontractoreachRough and finish.
Electrical, by licensed subcontractoreachRough and finish.
HVAC, by licensed subcontractoreachEquipment and ductwork.
Insulation and drywallsq ftR-values per code; finish level.
Interior finishes allowanceeachFlooring, trim, paint, fixtures.
Permits, plans and inspectionseachBuilding department fees and any engineering.
Dumpster and final cleaningeachDebris removal and a clean handover.
Overhead and profiteachShown separately or built into the lines.

Terms and deposit language for general contractor

  • Deposit. A deposit at signing secures the schedule and covers early costs such as permits and engineering. Many states limit deposits and set contract requirements for home improvement work, so check yours.
  • Payment. Progress payments tied to milestones or a schedule of values, with retainage if agreed, and final payment at substantial completion and punch list.
  • Warranty. State your workmanship warranty period and how claims are made; subcontractor and product warranties pass through to the owner.
  • Allowances: selections above the allowance are billed by change order.
  • Hidden conditions and owner changes are priced by written change order before the work.
  • Schedule depends on permits, inspections, weather and material lead times.

How to fill it in

  1. Your business details carry over from any template you used before.
  2. Fill in who you are billing and the job.
  3. Check the lines against what you actually did, and add your prices.
  4. Put any deposit in Already paid, so the balance is right.
  5. Print, download or send it from Koira with a pay-by-card link.

Free tools for general contractor

The same invoice for other trades: appliance repair, auto detailing, carpet cleaning, chimney, house cleaning, commercial cleaning, concrete, drywall, electrical, fence, flooring, garage door, gutter, handyman, hvac, irrigation, junk removal, landscaping, lawn care, locksmith, moving, painting, pest control, plumbing, pool service, pressure washing, remodeling, roofing, septic, snow removal, solar, tree service, waterproofing, window cleaning.

FAQ

How do general contractors bill?

By milestones or a schedule of values with percent complete, plus change orders, with retainage if the contract says so.

What is retainage?

A share of each payment held until the work is accepted. Whether and how much depends on the contract and state rules.

How do construction loans affect invoicing?

Lenders release draws after inspections. Match your invoices to the lender's draw schedule. Ask the lender for their schedule before you send the first invoice.

Should change orders appear on progress invoices?

Yes, each with its number, billed as agreed on the change order. That way the final invoice is a list the owner has already agreed to.

We know what works. Leave it to Koira.

☼⚙
Standard⚡ Turbo
● Koira did it● You by hand
Today $9,300$8,100 / $1,200
This week $25,050$18,570 / $6,480
This month $69,300$46,150 / $23,150
Money, just now
Reminded Sean Love, $1,850. Polite reminder with the pay link.
Bids, 9:44 am
Nudged Dana on the kitchen bid. Day 3 follow up. She opened it at 9:12.
Convos, 9:41 am
Texted back a missed call. Walk through booked Thu 10:00.
Free General Contractor Invoice Template (PDF and Word) | Koira