Free general contractor estimate template

A general contractor estimate for an addition or renovation, broken out by phase with general conditions, allowances, subcontracted trades, permits and overhead.

FreeNo email, no sign-up
8 linesFilled in for general contractor
PDF, Word, CSVPrint or download
Your business
Logo
Kept in this browser for your next document. It is not uploaded.
Optional. Add it if your trade is licensed where you work.
Prepared for
Estimate details
Line items
DescriptionQtyUnitPrice
qty
$
qty
$
qty
$
qty
$
qty
$
qty
$
qty
$
qty
$
%
Leave at 0 if your work is not taxed where you are.
$
%
Some states cap deposits on home improvement work. Check yours.
Total
$0.00
Estimate, Rear addition, family room
$0.00Subtotal
$0.00Deposit to start
8Lines to price
Kept in this browser only. Nothing you type here goes to Koira unless you tap Customize and send. The CSV opens in Google Sheets and Excel. In the print window, pick Save as PDF.
Your business name

Estimate

Number
E-1001
Prepared forCustomer name
JobRear addition, family room
DescriptionQtyUnitPriceAmount
General conditions4month
Site work and excavation1each
Foundation, crawl space1each
Framing and roof tie-in1each
Windows and exterior door5each
Electrical and HVAC, by licensed subcontractors1each
Interior finishes allowance1each
Permits, plans and inspections1each
Subtotal
$0.00
Total
$0.00
8 lines have no price yet
Notes
Allowances are listed for owner selections. Subcontractors are licensed for their trades. Estimated timeline attached.
Terms
Deposit at signing. Progress payments by milestone. Final payment at substantial completion and punch list.
Accepted by (customer signature)
Date

What a general contractor estimate is for

Owners hiring a general contractor want to see where the money goes across many trades. An estimate organized by phase, with allowances clearly marked, licensed subcontractors named by trade, permits listed and overhead shown or explained, lets them compare bids and understand the change order process before the job starts.

What to put on a general contractor estimate

  • Scope by phase or trade.
  • General conditions for the job's duration.
  • Allowances for owner selections.
  • Subcontracted trades.
  • Permits, plans and inspections.
  • Overhead and profit.
  • Payment schedule and estimated timeline.

A worked example

A single-story rear addition for a family room on a crawl space foundation, tied into the existing roof. The owner will choose flooring and fixtures later.

LineQtyUnitPrice
General conditions4monthYour price
Site work and excavation1eachYour price
Foundation, crawl space1eachYour price
Framing and roof tie-in1eachYour price
Windows and exterior door5eachYour price
Electrical and HVAC, by licensed subcontractors1eachYour price
Interior finishes allowance1eachYour price
Permits, plans and inspections1eachYour price

General conditions run by the month, so a longer schedule costs more. Say so in the notes; owners understand time costs once they see it.

Line items general contractors use

Line itemUnitHow to write it
General conditionsmonthSupervision, temporary facilities, insurance and site costs for the job's duration.
Site work and excavationeachClearing, digging and grading.
FoundationeachFootings, walls or slab per plan.
FramingeachWalls, floors and roof structure.
RoofingsquareBy subcontractor; material and warranty.
Windows and exterior doorseachAllowance or specified models.
Plumbing, by licensed subcontractoreachRough and finish.
Electrical, by licensed subcontractoreachRough and finish.
HVAC, by licensed subcontractoreachEquipment and ductwork.
Insulation and drywallsq ftR-values per code; finish level.
Interior finishes allowanceeachFlooring, trim, paint, fixtures.
Permits, plans and inspectionseachBuilding department fees and any engineering.
Dumpster and final cleaningeachDebris removal and a clean handover.
Overhead and profiteachShown separately or built into the lines.

Terms and deposit language for general contractor

  • Deposit. A deposit at signing secures the schedule and covers early costs such as permits and engineering. Many states limit deposits and set contract requirements for home improvement work, so check yours.
  • Payment. Progress payments tied to milestones or a schedule of values, with retainage if agreed, and final payment at substantial completion and punch list.
  • Warranty. State your workmanship warranty period and how claims are made; subcontractor and product warranties pass through to the owner.
  • Allowances: selections above the allowance are billed by change order.
  • Hidden conditions and owner changes are priced by written change order before the work.
  • Schedule depends on permits, inspections, weather and material lead times.

How to fill it in

  1. Put in your business details once; this browser keeps them for every template.
  2. Fill in the customer and the job.
  3. Change the line items to fit this job and add your prices.
  4. Set tax, the deposit and the good-until date.
  5. Print to PDF, download Word or CSV, or send it from Koira.

Free tools for general contractor

The same estimate for other trades: appliance repair, auto detailing, carpet cleaning, chimney, house cleaning, commercial cleaning, concrete, drywall, electrical, fence, flooring, garage door, gutter, handyman, hvac, irrigation, junk removal, landscaping, lawn care, locksmith, moving, painting, pest control, plumbing, pool service, pressure washing, remodeling, roofing, septic, snow removal, solar, tree service, waterproofing, window cleaning.

FAQ

What should a general contractor estimate include?

Scope by phase, general conditions, allowances, subcontracted trades, permits and plans, overhead and profit, payment schedule and timeline.

What are general conditions?

The job's running costs: supervision, temporary toilets and power, insurance, site protection and cleanup. They usually scale with time.

Should a GC show overhead and profit?

Some owners ask for it, especially on cost-plus work. Either show it as a line or build it into prices; say which.

How do allowances work on a GC estimate?

A set amount for items the owner chooses later. Above it, the owner pays the difference by change order; below it, they get a credit.

We know what works. Leave it to Koira.

☼⚙
Standard⚡ Turbo
● Koira did it● You by hand
Today $9,300$8,100 / $1,200
This week $25,050$18,570 / $6,480
This month $69,300$46,150 / $23,150
Money, just now
Reminded Sean Love, $1,850. Polite reminder with the pay link.
Bids, 9:44 am
Nudged Dana on the kitchen bid. Day 3 follow up. She opened it at 9:12.
Convos, 9:41 am
Texted back a missed call. Walk through booked Thu 10:00.
Free General Contractor Estimate Template (PDF and Word) | Koira