Free remodeling estimate template

A remodeling estimate for a kitchen or bath with demolition, rough-ins, cabinets, counters, tile, fixtures and permits broken out, plus allowances. Add your prices and send it.

FreeNo email, no sign-up
8 linesFilled in for remodeling
PDF, Word, CSVPrint or download
Your business
Logo
Kept in this browser for your next document. It is not uploaded.
Optional. Add it if your trade is licensed where you work.
Prepared for
Estimate details
Line items
DescriptionQtyUnitPrice
qty
$
qty
$
qty
$
qty
$
qty
$
qty
$
qty
$
qty
$
%
Leave at 0 if your work is not taxed where you are.
$
%
Some states cap deposits on home improvement work. Check yours.
Total
$0.00
Estimate, Primary bathroom remodel
$0.00Subtotal
$0.00Deposit to start
8Lines to price
Kept in this browser only. Nothing you type here goes to Koira unless you tap Customize and send. The CSV opens in Google Sheets and Excel. In the print window, pick Save as PDF.
Your business name

Estimate

Number
E-1001
Prepared forCustomer name
JobPrimary bathroom remodel
DescriptionQtyUnitPriceAmount
Demolition to studs and haul-away1each
Plumbing rough-in and finish, shower and double vanity1each
Electrical: fan, lights and outlets1each
Shower waterproofing and tile setting110sq ft
Floor tile setting70sq ft
Tile allowance180sq ft
Vanity, top and fixtures allowance1each
Permits and inspections1each
Subtotal
$0.00
Total
$0.00
8 lines have no price yet
Notes
Allowances are listed for items you will choose. Hidden conditions behind walls are priced before we fix them.
Terms
Deposit at signing. Progress payments at demolition complete, rough-in inspection passed, tile complete, and final after the punch list.
Accepted by (customer signature)
Date

What a remodeling estimate is for

Remodel customers worry about two things: the price growing and the job dragging on. An estimate that breaks the work into trades, shows allowances clearly, names what stays and what goes, and lists permits answers both worries. It is also the document you will point to every time a change order comes up, so it should be specific.

What to put on a remodeling estimate

  • The scope, room by room, and what stays.
  • Each trade's work as its own line.
  • Allowances for items the customer will choose.
  • Permits and inspections.
  • How hidden conditions are handled.
  • Payment schedule by milestone.
  • The estimated schedule and lead times.

A worked example

A primary bath gutted to the studs: new tile shower, double vanity, tile floor, new fan and lighting. The customer has not chosen tile or fixtures yet, so those are allowances.

LineQtyUnitPrice
Demolition to studs and haul-away1eachYour price
Plumbing rough-in and finish, shower and double vanity1eachYour price
Electrical: fan, lights and outlets1eachYour price
Shower waterproofing and tile setting110sq ftYour price
Floor tile setting70sq ftYour price
Tile allowance180sq ftYour price
Vanity, top and fixtures allowance1eachYour price
Permits and inspections1eachYour price

The tile allowance is per square foot so the customer can see what fits it. If they pick tile above it, the difference goes on a change order, which you say in the terms.

Line items remodelers use

Line itemUnitHow to write it
Demolition and haul-awayeachSay what stays: cabinets, flooring, fixtures.
DumpstereachSize and how long it stays.
Framing changeshourWalls moved or added; say whether walls are load bearing.
Plumbing rough-in and finisheachBy a licensed plumber where required.
Electrical rough-in and finisheachBy a licensed electrician where required.
Drywall hang, tape and finishsq ftLevel of finish.
Cabinets, supply and installftLinear feet; brand and door style.
Countertops, fabricate and installsq ftMaterial, edge and sink cutouts.
Tile, floor or wallsq ftTile allowance per square foot, plus setting.
Flooringsq ftMaterial and underlayment.
Fixtures allowanceeachAllowance amount the customer picks within.
Paintsq ftWalls, ceilings and trim in the remodeled space.
Permits and inspectionseachBuilding, plumbing and electrical as required.
Project management and cleanupdayDaily site cleanup and coordination.

Terms and deposit language for remodeling

  • Deposit. A deposit at signing secures the schedule and orders long-lead items like cabinets. Many states limit home improvement deposits and require specific contract language, so check your state's rules.
  • Payment. Progress payments tied to milestones such as demolition, rough-in inspection, cabinets set and substantial completion, with a final payment after the punch list.
  • Warranty. State your workmanship warranty and that products carry their makers' warranties. Say how warranty requests are made.
  • Allowances: if the customer picks items above the allowance, the difference is a change order.
  • Hidden conditions behind walls and floors are priced by change order before the work.
  • Lead times for cabinets, tile and fixtures can move the schedule; say how you communicate it.

How to fill it in

  1. Put in your business details once; this browser keeps them for every template.
  2. Fill in the customer and the job.
  3. Change the line items to fit this job and add your prices.
  4. Set tax, the deposit and the good-until date.
  5. Print to PDF, download Word or CSV, or send it from Koira.

Free tools for remodeling

The same estimate for other trades: appliance repair, auto detailing, carpet cleaning, chimney, house cleaning, commercial cleaning, concrete, drywall, electrical, fence, flooring, garage door, general contractor, gutter, handyman, hvac, irrigation, junk removal, landscaping, lawn care, locksmith, moving, painting, pest control, plumbing, pool service, pressure washing, roofing, septic, snow removal, solar, tree service, waterproofing, window cleaning.

More for remodelers: how remodelers run on Koira.

FAQ

What should a remodeling estimate include?

The scope by room, each trade's work, allowances, permits, how hidden conditions are handled, the payment schedule and the estimated timeline. The more specific it is, the fewer arguments later.

What is an allowance in a remodeling estimate?

A set amount for items the customer will choose later, like tile or fixtures. If they choose above it, they pay the difference by change order; below it, they get a credit.

How should a remodeler schedule payments?

Tie them to milestones the customer can see, such as demolition complete or rough-in inspection passed, rather than to dates. Many states limit deposits, so check your state's rules.

Should a remodel estimate include a timeline?

An estimated timeline with lead times for cabinets and tile sets expectations. Say what can move it, such as inspections and supply delays.

We know what works. Leave it to Koira.

☼⚙
Standard⚡ Turbo
● Koira did it● You by hand
Today $9,300$8,100 / $1,200
This week $25,050$18,570 / $6,480
This month $69,300$46,150 / $23,150
Money, just now
Reminded Sean Love, $1,850. Polite reminder with the pay link.
Bids, 9:44 am
Nudged Dana on the kitchen bid. Day 3 follow up. She opened it at 9:12.
Convos, 9:41 am
Texted back a missed call. Walk through booked Thu 10:00.
Free Remodeling Estimate Template (PDF and Word) | Koira