Free remodeling proposal template

A remodeling proposal with three levels: a refresh that keeps the layout, a full remodel with new finishes, or a reconfigured space with a larger shower or moved walls.

FreeNo email, no sign-up
3 optionsFilled in for remodeling
PDF, Word, CSVPrint or download
Your business
Logo
Kept in this browser for your next document. It is not uploaded.
Optional. Add it if your trade is licensed where you work.
Prepared for
Proposal details
Option 1
DescriptionQtyUnitPrice
qty
$
qty
$
qty
$
qty
$
Option 2
DescriptionQtyUnitPrice
qty
$
qty
$
qty
$
qty
$
qty
$
qty
$
Option 3
DescriptionQtyUnitPrice
qty
$
qty
$
qty
$
qty
$
qty
$
qty
$
qty
$
%
Leave at 0 if your work is not taxed where you are.
$
%
Some states cap deposits on home improvement work. Check yours.
Proposal with
3 options
Proposal, Bathroom remodel options
No prices yetOption 1, 4 lines to price
No prices yetOption 2, 6 lines to price
No prices yetOption 3, 7 lines to price
Kept in this browser only. Nothing you type here goes to Koira unless you tap Customize and send. The CSV opens in Google Sheets and Excel. In the print window, pick Save as PDF.
Your business name

Proposal

Number
P-1001
Prepared forCustomer name
JobBathroom remodel options
Option 1: Good: refresh
Keep the layout; new vanity, toilet, fixtures, paint and floor.
DescriptionQtyUnitPriceAmount
Remove vanity, toilet and floor1each
Vanity, top and fixtures allowance1each
Floor tile setting70sq ft
Paint300sq ft
Option 1 totalTo be priced
Option 2: Better: full remodel
Gut to studs, tile shower, new everything in the same layout.
DescriptionQtyUnitPriceAmount
Demolition to studs1each
Plumbing rough-in and finish1each
Shower waterproofing and tile110sq ft
Floor tile setting70sq ft
Fixtures allowance1each
Permits and inspections1each
Option 2 totalTo be priced
Option 3: Best: new layout
Remove the tub for a walk-in shower, move the vanity wall, add heated floor.
DescriptionQtyUnitPriceAmount
Demolition to studs1each
Framing: move vanity wall1each
Plumbing relocation and finish1each
Walk-in shower, waterproofing and tile140sq ft
Heated floor mat and tile70sq ft
Fixtures allowance1each
Permits and inspections1each
Option 3 totalTo be priced
Notes
Allowances are listed in each level. Timelines grow with each level.
Terms
Choose a level and sign. Deposit at signing; progress payments by milestone.
Option chosen
Accepted by (customer signature)
Date

What a remodeling proposal is for

Remodel customers often call with a picture from the internet and a budget that does not match it. Three levels on the same room show what a refresh costs versus a full gut versus a new layout, so the customer can find where their budget and wish list meet. It replaces the awkward budget conversation with a choice.

What to put on a remodeling proposal

  • The same room and measurements.
  • What each level changes: finishes, fixtures, layout.
  • Allowances in each.
  • Permits where the level needs them.
  • Timeline differences.
  • One acceptance line.

A worked example

The same primary bath. Price each level from your own costs and allowances.

Option 1: Good: refresh. Keep the layout; new vanity, toilet, fixtures, paint and floor.

LineQtyUnitPrice
Remove vanity, toilet and floor1eachYour price
Vanity, top and fixtures allowance1eachYour price
Floor tile setting70sq ftYour price
Paint300sq ftYour price

Option 2: Better: full remodel. Gut to studs, tile shower, new everything in the same layout.

LineQtyUnitPrice
Demolition to studs1eachYour price
Plumbing rough-in and finish1eachYour price
Shower waterproofing and tile110sq ftYour price
Floor tile setting70sq ftYour price
Fixtures allowance1eachYour price
Permits and inspections1eachYour price

Option 3: Best: new layout. Remove the tub for a walk-in shower, move the vanity wall, add heated floor.

LineQtyUnitPrice
Demolition to studs1eachYour price
Framing: move vanity wall1eachYour price
Plumbing relocation and finish1eachYour price
Walk-in shower, waterproofing and tile140sq ftYour price
Heated floor mat and tile70sq ftYour price
Fixtures allowance1eachYour price
Permits and inspections1eachYour price

Say in each option's note what the customer will notice: same layout with new surfaces, or a new shower where the tub was. Customers choose on what they will see.

Line items remodelers use

Line itemUnitHow to write it
Demolition and haul-awayeachSay what stays: cabinets, flooring, fixtures.
DumpstereachSize and how long it stays.
Framing changeshourWalls moved or added; say whether walls are load bearing.
Plumbing rough-in and finisheachBy a licensed plumber where required.
Electrical rough-in and finisheachBy a licensed electrician where required.
Drywall hang, tape and finishsq ftLevel of finish.
Cabinets, supply and installftLinear feet; brand and door style.
Countertops, fabricate and installsq ftMaterial, edge and sink cutouts.
Tile, floor or wallsq ftTile allowance per square foot, plus setting.
Flooringsq ftMaterial and underlayment.
Fixtures allowanceeachAllowance amount the customer picks within.
Paintsq ftWalls, ceilings and trim in the remodeled space.
Permits and inspectionseachBuilding, plumbing and electrical as required.
Project management and cleanupdayDaily site cleanup and coordination.

Terms and deposit language for remodeling

  • Deposit. A deposit at signing secures the schedule and orders long-lead items like cabinets. Many states limit home improvement deposits and require specific contract language, so check your state's rules.
  • Payment. Progress payments tied to milestones such as demolition, rough-in inspection, cabinets set and substantial completion, with a final payment after the punch list.
  • Warranty. State your workmanship warranty and that products carry their makers' warranties. Say how warranty requests are made.
  • Allowances: if the customer picks items above the allowance, the difference is a change order.
  • Hidden conditions behind walls and floors are priced by change order before the work.
  • Lead times for cabinets, tile and fixtures can move the schedule; say how you communicate it.

How to fill it in

  1. Fill in the customer and the job.
  2. Check each option's name, its one-line difference and its lines.
  3. Add your prices; each option totals on its own.
  4. Set tax, the deposit and the good-until date.
  5. Print it, download it, or send it from Koira so the customer can pick and sign on the phone.

Free tools for remodeling

The same proposal for other trades: appliance repair, auto detailing, carpet cleaning, chimney, house cleaning, commercial cleaning, concrete, drywall, electrical, fence, flooring, garage door, general contractor, gutter, handyman, hvac, irrigation, junk removal, landscaping, lawn care, locksmith, moving, painting, pest control, plumbing, pool service, pressure washing, roofing, septic, snow removal, solar, tree service, waterproofing, window cleaning.

More for remodelers: how remodelers run on Koira.

FAQ

How should a remodeler present options?

Three levels for the same room: a refresh, a full remodel and a new layout, each with allowances and a timeline. It finds the budget without asking for it.

What does a refresh usually include?

New surfaces and fixtures in the existing layout: vanity, toilet, faucets, lighting, paint and maybe flooring. No moved plumbing.

Why does moving plumbing cost more?

Relocating drains and supplies means opening floors and walls, more inspection work and more framing. Giving the relocation its own line shows the customer exactly what the new layout adds to the price.

Can a remodel proposal be signed online?

From Koira the customer picks the level, signs and pays the deposit. Many remodelers still meet in person for the final decision.

We know what works. Leave it to Koira.

☼⚙
Standard⚡ Turbo
● Koira did it● You by hand
Today $9,300$8,100 / $1,200
This week $25,050$18,570 / $6,480
This month $69,300$46,150 / $23,150
Money, just now
Reminded Sean Love, $1,850. Polite reminder with the pay link.
Bids, 9:44 am
Nudged Dana on the kitchen bid. Day 3 follow up. She opened it at 9:12.
Convos, 9:41 am
Texted back a missed call. Walk through booked Thu 10:00.
Free Remodeling Proposal Template (PDF and Word) | Koira