A general contractor change order for hidden conditions, owner changes, allowance overages and inspector requirements, with the new contract total and schedule.

FreeNo email, no sign-up
3 linesFilled in for general contractor
PDF, Word, CSVPrint or download
Your business
Logo
Kept in this browser for your next document. It is not uploaded.
Optional. Add it if your trade is licensed where you work.
Customer
Change order details
Line items
A credit for work taken out: type the quantity as a minus number.
DescriptionQtyUnitPrice
qty
$
qty
$
qty
$
$
%
Leave at 0 if your work is not taxed where you are.
Change total
$0.00
Change order, Change to addition
$0.00This change
$0.00Tax
3Lines to price
Kept in this browser only. Nothing you type here goes to Koira unless you tap Customize and send. The CSV opens in Google Sheets and Excel. In the print window, pick Save as PDF.
Your business name

Change order

Number
CO-1001
CustomerCustomer name
JobChange to addition
DescriptionQtyUnitPriceAmount
Oil tank removal and soil testing, by licensed subcontractor1each
Window upgrade difference5each
Credit: built-in bookcase removed-1each
This change
$0.00
Change total
$0.00
3 lines have no price yet
Reason for the change
Buried oil tank found during excavation; photos attached. Windows upgraded by the owner. Bookcase removed from scope.
Terms
This change order amends the contract. Added amounts billed with the next milestone.
Approved by (customer signature)
Contractor
Date

What a general contractor change order is for

Change orders are the heart of GC paperwork. Every hidden condition, owner request and allowance overage should be written, priced, scheduled and signed before the work. Clear change orders protect your margin and the relationship, and they make the final invoice a list of things the owner already agreed to.

What to put on a general contractor change order

  • Change order number and original contract.
  • Reason: hidden condition, owner request or code.
  • Added and credited lines.
  • New contract total.
  • Days added.
  • Signatures before the work.

A worked example

Excavation finds an old buried oil tank. The owner upgrades the windows and drops the built-in bookcase.

LineQtyUnitPrice
Oil tank removal and soil testing, by licensed subcontractor1eachYour price
Window upgrade difference5eachYour price
Credit: built-in bookcase removed-1eachYour price

Separate the reasons in the notes: found, chosen, removed. The original contract amount and the days added each have their own box, so the new total and the new finish date are both on the page.

Line items general contractors use

Line itemUnitHow to write it
General conditionsmonthSupervision, temporary facilities, insurance and site costs for the job's duration.
Site work and excavationeachClearing, digging and grading.
FoundationeachFootings, walls or slab per plan.
FramingeachWalls, floors and roof structure.
RoofingsquareBy subcontractor; material and warranty.
Windows and exterior doorseachAllowance or specified models.
Plumbing, by licensed subcontractoreachRough and finish.
Electrical, by licensed subcontractoreachRough and finish.
HVAC, by licensed subcontractoreachEquipment and ductwork.
Insulation and drywallsq ftR-values per code; finish level.
Interior finishes allowanceeachFlooring, trim, paint, fixtures.
Permits, plans and inspectionseachBuilding department fees and any engineering.
Dumpster and final cleaningeachDebris removal and a clean handover.
Overhead and profiteachShown separately or built into the lines.

Terms and deposit language for general contractor

  • Deposit. A deposit at signing secures the schedule and covers early costs such as permits and engineering. Many states limit deposits and set contract requirements for home improvement work, so check yours.
  • Payment. Progress payments tied to milestones or a schedule of values, with retainage if agreed, and final payment at substantial completion and punch list.
  • Warranty. State your workmanship warranty period and how claims are made; subcontractor and product warranties pass through to the owner.
  • Allowances: selections above the allowance are billed by change order.
  • Hidden conditions and owner changes are priced by written change order before the work.
  • Schedule depends on permits, inspections, weather and material lead times.

How to fill it in

  1. Put in the original estimate number and amount.
  2. Write what changed in the reason box, plainly.
  3. Add the new work; type a minus quantity for any credit.
  4. Fill in the days added.
  5. Print it for a signature on site, or send it from Koira to sign by phone.

Free tools for general contractor

The same change order for other trades: appliance repair, auto detailing, carpet cleaning, chimney, house cleaning, commercial cleaning, concrete, drywall, electrical, fence, flooring, garage door, gutter, handyman, hvac, irrigation, junk removal, landscaping, lawn care, locksmith, moving, painting, pest control, plumbing, pool service, pressure washing, remodeling, roofing, septic, snow removal, solar, tree service, waterproofing, window cleaning.

FAQ

When does a GC need a change order?

For any change in scope, price or schedule: hidden conditions, owner changes, allowance overages, code or inspector requirements.

How do I handle environmental surprises?

Stop work in the area, use licensed specialists where required, and price it on a change order with photos.

Should change orders show schedule impact?

Yes. Days added explain later finish dates and avoid disputes. A two-week delay the owner signed for is far easier to live with than a surprise.

How should change orders be numbered?

In order for the job, with the original contract referenced on each, so the final invoice lists them clearly.

We know what works. Leave it to Koira.

☼⚙
Standard⚡ Turbo
● Koira did it● You by hand
Today $9,300$8,100 / $1,200
This week $25,050$18,570 / $6,480
This month $69,300$46,150 / $23,150
Money, just now
Reminded Sean Love, $1,850. Polite reminder with the pay link.
Bids, 9:44 am
Nudged Dana on the kitchen bid. Day 3 follow up. She opened it at 9:12.
Convos, 9:41 am
Texted back a missed call. Walk through booked Thu 10:00.
Free General Contractor Change Order Template (PDF and Word) | Koira