Free hood cleaning change order template

A hood cleaning change order for heavier buildup than quoted, access panels needed, a fan repair, or an added hood found on the walkthrough.

FreeNo email, no sign-up
3 linesFilled in for hood cleaning
PDF, Word, CSVPrint or download
Your business
Logo
Kept in this browser for your next document. It is not uploaded.
Optional. Add it if your trade is licensed where you work.
Customer
Change order details
Line items
A credit for work taken out: type the quantity as a minus number.
DescriptionQtyUnitPrice
qty
$
qty
$
qty
$
$
%
Leave at 0 if your work is not taxed where you are.
Change total
$0.00
Change order, Change to hood cleaning
$0.00This change
$0.00Tax
3Lines to price
Kept in this browser only. Nothing you type here goes to Koira unless you tap Customize and send. The CSV opens in Google Sheets and Excel. In the print window, pick Save as PDF.
Your business name

Change order

Number
CO-1001
CustomerCustomer name
JobChange to hood cleaning
DescriptionQtyUnitPriceAmount
First clean of a neglected system2hour
Access panel installed1each
Fan belt replacement1each
This change
$0.00
Change total
$0.00
3 lines have no price yet
Reason for the change
Heavy grease in the horizontal duct; photos attached. Second panel needed to reach the elbow.
Terms
This change order amends the estimate. Billed with this cleaning.
Approved by (customer signature)
Contractor
Date

What a hood cleaning change order is for

Hood cleaning bids are made from what can be seen; the duct tells the rest. When a run is caked or unreachable, or the fan bearing is shot, the owner should approve the extra before the crew spends the night on it. A signed change order with photos does that, even at midnight, by text.

What to put on a hood cleaning change order

  • What the crew found, with photos.
  • Extra time or parts.
  • Panels or repairs needed.
  • New total.
  • Owner's or manager's approval.

A worked example

The duct is far heavier than quoted, a second access panel is needed, and the fan belt is worn.

LineQtyUnitPrice
First clean of a neglected system2hourYour price
Access panel installed1eachYour price
Fan belt replacement1eachYour price

Send the photos by text with the change order. A manager can approve at midnight from their phone.

Line items hood cleaning companies use

Line itemUnitHow to write it
Hood, plenum and filters cleanedftHood length in feet.
Horizontal duct cleanedftAccessible runs; access panels used.
Vertical duct cleanedftRiser to the roof.
Upblast exhaust fan cleanedeachFan bowl, blades and housing.
Grease containment on faneachAbsorbent filter or box.
Access panel installedeachWhere the duct cannot be reached.
Fan hinge kiteachSo the fan can be tilted for cleaning.
Filter exchangeeachSwap of baffle filters between cleanings.
Fan belt replacementeachBelt size noted for next time.
First clean of a neglected systemhourExtra time for heavy buildup.
Service label and photo reporteachLabel on the hood and photos for the owner.
Wastewater handlingeachCaptured and disposed under local rules.

Terms and deposit language for hood cleaning

  • Deposit. No deposit on scheduled cleanings for accounts in good standing. First cleans of neglected systems are paid half at booking.
  • Payment. Billed after each cleaning, or monthly on a yearly plan; due within the terms on the invoice.
  • Warranty. You clean the hood, accessible duct and fan to bare metal where reachable and show it in photos. Areas without access are noted, not claimed as cleaned.
  • Cleanings happen after closing; the kitchen is clear of food and staff gear.
  • Areas that cannot be reached are listed on the report with the access panels needed.
  • Frequency follows the local fire code for the kitchen's type of cooking.

How to fill it in

  1. Put in the original estimate number and amount.
  2. Write what changed in the reason box, plainly.
  3. Add the new work; type a minus quantity for any credit.
  4. Fill in the days added.
  5. Print it for a signature on site, or send it from Koira to sign by phone.

Free tools for hood cleaning

The same change order for other trades: appliance repair, auto detailing, carpentry, carpet cleaning, chimney, house cleaning, commercial cleaning, concrete, deck, drywall, duct cleaning, electrical, fence, flooring, garage door, general contractor, glass, gutter, handyman, holiday lighting, home inspection, hvac, insulation, irrigation, junk removal, landscaping, lawn care, locksmith, masonry, moving, painting, pest control, plumbing, pool service, pressure washing, property maintenance, remodeling, restoration, roofing, security system, septic, siding, snow removal, solar, tile, tree service, water treatment, waterproofing, window cleaning, window and door.

More for hood cleaning companies: how hood cleaning companies run on Koira.

For hood cleanersA template covers one document. Koira handles the rest of the office side: quotes, invoices, booking, follow ups and your website, in one place.Hood cleaning software

Shane Allen writes Koira's guides for trade business owners. How we check our numbers.

FAQ

When does a hood cleaning need a change order?

When buildup is heavier than quoted, access panels are needed, the fan needs parts, or an extra hood is found.

How can a manager approve at night?

Send the change order and photos by text. The manager signs on their phone and the crew keeps working.

Should I charge more for neglected systems?

Yes, for the first clean. A system years overdue takes far longer, and the change order shows why.

Do access panels need approval?

Yes. Installing a panel changes the duct, so the owner should approve it in writing before you cut.

We know what works. Leave it to Koira.

☼⚙
Standard⚡ Turbo
● Koira did it● You by hand
Today $9,300$8,100 / $1,200
This week $25,050$18,570 / $6,480
This month $69,300$46,150 / $23,150
Money, just now
Reminded Sean Love, $1,850. Polite reminder with the pay link.
Bids, 9:44 am
Nudged Dana on the kitchen bid. Day 3 follow up. Dana opened it at 9:12.
Convos, 9:41 am
Texted back a missed call. Walk through booked Thu 10:00.