Free locksmith change order template

A locksmith change order for a lock that cannot be rekeyed and must be replaced, a door that needs drilling, or added locks on the visit.

FreeNo email, no sign-up
3 linesFilled in for locksmith
PDF, Word, CSVPrint or download
Your business
Logo
Kept in this browser for your next document. It is not uploaded.
Optional. Add it if your trade is licensed where you work.
Customer
Change order details
Line items
A credit for work taken out: type the quantity as a minus number.
DescriptionQtyUnitPrice
qty
$
qty
$
qty
$
$
%
Leave at 0 if your work is not taxed where you are.
Change total
$0.00
Change order, Change to locksmith job
$0.00This change
$0.00Tax
3Lines to price
Kept in this browser only. Nothing you type here goes to Koira unless you tap Customize and send. The CSV opens in Google Sheets and Excel. In the print window, pick Save as PDF.
Your business name

Change order

Number
CO-1001
CustomerCustomer name
JobChange to locksmith job
DescriptionQtyUnitPriceAmount
Replace worn cylinder, back door1each
Keyed-alike padlock, side gate1each
Credit: garage entry not rekeyed-1each
This change
$0.00
Change total
$0.00
3 lines have no price yet
Reason for the change
Back door cylinder worn beyond rekeying; shown to the customer.
Terms
Changes due on completion.
Approved by (customer signature)
Contractor
Date

What a locksmith change order is for

Locksmith jobs change at the door: a worn cylinder that will not take new pins, a door with no bore for a deadbolt, or a customer who adds the shed lock. A quick written change before the extra work protects your reputation in a trade where surprise charges are the main complaint.

What to put on a locksmith change order

  • The original price.
  • What was found or added.
  • Added and removed lines.
  • The new total.
  • Approval before continuing.

A worked example

The back door cylinder is too worn to rekey and must be replaced. The customer adds the side gate padlock and skips the garage entry door.

LineQtyUnitPrice
Replace worn cylinder, back door1eachYour price
Keyed-alike padlock, side gate1eachYour price
Credit: garage entry not rekeyed-1eachYour price

Show the customer the worn cylinder. A visible reason makes a changed price easy to accept.

Line items locksmiths use

Line itemUnitHow to write it
Service calleachTrip charge; after-hours rate if applicable.
House lockouteachProof of residence checked before entry.
Car lockouteachProof of ownership checked.
Rekey lock cylindereachPer cylinder; keys extra.
Deadbolt installedeachGrade and brand; new bore or existing.
Smart lock installedeachCustomer supplied or yours; app setup.
Key cuttingeachPer key.
Car key programmingeachTransponder or fob; make and model.
Master key systemeachCommercial; key schedule design.
Commercial door closereachAdjust or replace.
Safe openingeachProof of ownership; method affects price.
Lock repaireachSticking or broken mechanism.

Terms and deposit language for locksmith

  • Deposit. No deposit on service calls. Master key systems and commercial hardware orders may take a deposit.
  • Payment. Due on completion.
  • Warranty. Hardware carries the maker's warranty; state your labor warranty on installs.
  • Proof of residence or ownership is required before any lockout, safe opening or key programming.
  • After-hours and emergency calls carry the rate stated before you go.
  • Some states license locksmiths; your license number appears on your paperwork where required.

How to fill it in

  1. Put in the original estimate number and amount.
  2. Write what changed in the reason box, plainly.
  3. Add the new work; type a minus quantity for any credit.
  4. Fill in the days added.
  5. Print it for a signature on site, or send it from Koira to sign by phone.

Free tools for locksmith

The same change order for other trades: appliance repair, auto detailing, carpentry, carpet cleaning, chimney, house cleaning, commercial cleaning, concrete, deck, drywall, duct cleaning, electrical, fence, flooring, garage door, general contractor, glass, gutter, handyman, holiday lighting, home inspection, hood cleaning, hvac, insulation, irrigation, junk removal, landscaping, lawn care, masonry, moving, painting, pest control, plumbing, pool service, pressure washing, property maintenance, remodeling, restoration, roofing, security system, septic, siding, snow removal, solar, tile, tree service, water treatment, waterproofing, window cleaning, window and door.

For locksmithsA template covers one document. Koira handles the rest of the office side: quotes, invoices, booking, follow ups and your website, in one place.Koira for locksmiths

Shane Allen writes Koira's guides for trade business owners. How we check our numbers.

FAQ

When does a locksmith need a change order?

When hardware cannot be serviced as planned, a door needs extra work, or the customer adds or drops locks.

How do I avoid looking like a scammer?

Give the price before work and get approval before any change. Write it down. Surprise charges are what customers fear.

Can I credit dropped locks?

Yes. A minus quantity takes them off the total. The customer sees the added padlock and the skipped door on one page, so the total makes sense.

Should I show the customer worn parts?

Yes. Seeing a worn cylinder explains the change better than words. Keep the old part to hand back to the customer if they want it.

We know what works. Leave it to Koira.

☼⚙
Standard⚡ Turbo
● Koira did it● You by hand
Today $9,300$8,100 / $1,200
This week $25,050$18,570 / $6,480
This month $69,300$46,150 / $23,150
Money, just now
Reminded Sean Love, $1,850. Polite reminder with the pay link.
Bids, 9:44 am
Nudged Dana on the kitchen bid. Day 3 follow up. Dana opened it at 9:12.
Convos, 9:41 am
Texted back a missed call. Walk through booked Thu 10:00.