Free holiday lighting change order template

A holiday lighting change order for an added tree, more roofline, a color change, or a section dropped because an outlet will not carry it.

FreeNo email, no sign-up
3 linesFilled in for holiday lighting
PDF, Word, CSVPrint or download
Your business
Logo
Kept in this browser for your next document. It is not uploaded.
Optional. Add it if your trade is licensed where you work.
Customer
Change order details
Line items
A credit for work taken out: type the quantity as a minus number.
DescriptionQtyUnitPrice
qty
$
qty
$
qty
$
$
%
Leave at 0 if your work is not taxed where you are.
Change total
$0.00
Change order, Change to holiday display
$0.00This change
$0.00Tax
3Lines to price
Kept in this browser only. Nothing you type here goes to Koira unless you tap Customize and send. The CSV opens in Google Sheets and Excel. In the print window, pick Save as PDF.
Your business name

Change order

Number
CO-1001
CustomerCustomer name
JobChange to holiday display
DescriptionQtyUnitPriceAmount
Tree wrap, third maple1each
Credit: back roofline, no outlet-40ft
Garland moved to porch railing16ft
This change
$0.00
Change total
$0.00
3 lines have no price yet
Reason for the change
Back roofline dropped: no outdoor outlet. Third tree added by owner.
Terms
This change order amends the estimate. Due on install day.
Approved by (customer signature)
Contractor
Date

What a holiday lighting change order is for

Owners add to the display when they see the first section lit, and some sections turn out to have no outlet nearby. A quick signed change order on install day keeps the extra trees and the dropped sections clear on the invoice and avoids a disagreement when the season bill arrives.

What to put on a holiday lighting change order

  • What changed and why.
  • Added lights or decorations.
  • Sections dropped and credits.
  • New total.
  • Signature on install day.

A worked example

The owner adds a third tree, the back roofline is dropped because there is no outlet, and the garland goes on the railing instead of the door.

LineQtyUnitPrice
Tree wrap, third maple1eachYour price
Credit: back roofline, no outlet-40ftYour price
Garland moved to porch railing16ftYour price

Write why a section was dropped. A missing outlet is a reason the owner can fix before next season.

Line items holiday lighting installers use

Line itemUnitHow to write it
Roofline lights, installedftBulb type and color; lights leased or sold.
Ridge line lightsftHigher work; second story or steep roof.
Tree wrap, trunk and brancheseachTree height and wrap style.
Bush and shrub lightseachNet or string lights per bush.
Wreath with lightseachSize and placement.
Garland on railing or doorftLit or unlit.
Ground stakes and pathway lightseachSpacing along the walk.
Timer and outdoor cordssetOutdoor-rated, on existing outlets.
Takedown after the seasonftLights removed, tested and boxed.
Storage until next seasonsetLabeled for this house.
Mid-season service callvisitFix outages during the season.

Terms and deposit language for holiday lighting

  • Deposit. A deposit at booking holds the install date in a short season and covers lights ordered for this house. Follow your state's deposit rules.
  • Payment. Balance due on install day after the owner sees the lights on.
  • Warranty. Lights that fail during the season are fixed on a service call within the days stated. Damage from storms, animals or people unplugging the timer is not a lighting defect.
  • Lights stay the property of the installer when leased, and are stored for next season.
  • Lights plug into existing outdoor outlets; new outlets need an electrician.
  • Install and takedown dates depend on weather; roofs are not walked when wet or icy.

How to fill it in

  1. Put in the original estimate number and amount.
  2. Write what changed in the reason box, plainly.
  3. Add the new work; type a minus quantity for any credit.
  4. Fill in the days added.
  5. Print it for a signature on site, or send it from Koira to sign by phone.

Free tools for holiday lighting

The same change order for other trades: appliance repair, auto detailing, carpentry, carpet cleaning, chimney, house cleaning, commercial cleaning, concrete, deck, drywall, duct cleaning, electrical, fence, flooring, garage door, general contractor, glass, gutter, handyman, home inspection, hood cleaning, hvac, insulation, irrigation, junk removal, landscaping, lawn care, locksmith, masonry, moving, painting, pest control, plumbing, pool service, pressure washing, property maintenance, remodeling, restoration, roofing, security system, septic, siding, snow removal, solar, tile, tree service, water treatment, waterproofing, window cleaning, window and door.

More for holiday lighting installers: how holiday lighting installers run on Koira.

For holiday lighting installersA template covers one document. Koira handles the rest of the office side: quotes, invoices, booking, follow ups and your website, in one place.Quote and invoice holiday lighting jobs

Shane Allen writes Koira's guides for trade business owners. How we check our numbers.

FAQ

When does holiday lighting need a change order?

When the owner adds trees or roofline, changes colors, or a section is dropped for lack of an outlet.

What if there is no outlet for a section?

Drop it with a credit and note why. New outdoor outlets are electrician's work the owner can arrange before next season.

Can owners change bulb colors on install day?

If you have the stock, yes. Put it on the change order so next year's install uses the same colors.

How is a dropped section credited?

Enter the feet as a credit with a minus quantity, and the change order shows the lower total.

We know what works. Leave it to Koira.

☼⚙
Standard⚡ Turbo
● Koira did it● You by hand
Today $9,300$8,100 / $1,200
This week $25,050$18,570 / $6,480
This month $69,300$46,150 / $23,150
Money, just now
Reminded Sean Love, $1,850. Polite reminder with the pay link.
Bids, 9:44 am
Nudged Dana on the kitchen bid. Day 3 follow up. Dana opened it at 9:12.
Convos, 9:41 am
Texted back a missed call. Walk through booked Thu 10:00.