Electrical inspection checklist

The residential electrical check, from the service drop to the receptacles, with a status and note for each line. Fill it in on your phone, then print or save as PDF.

19 itemsIn 5 groups
OK or fixWith a note per line
PrintableOr save as PDF
Items marked
0 of 19
0 need attention
Nothing you type here is sent to Koira. Print a blank one for the truck, or fill it in here first.

Electrical inspection checklist

koira.ai/checklists/electrical-inspection-checklist
Service
Service drop and overhead conductors
Service head, gooseneck and drip loops
Service mast, conduit and raceway
Meter and base
Service-entrance conductors and insulation
Panel and protection
Main service disconnect
Panelboards
Breakers and fuses
Unused panel openings filled
Service grounding and bonding
Devices
Representative switches
Representative light fixtures
Representative receptacles: power, polarity, grounding, covers, secured
AFCI-protected receptacles (test button)
GFCI receptacles and breakers (tester)
Signs of arcing or heat
Life safety
Smoke alarms present
Carbon monoxide alarms present
Other
Solid conductor aluminum branch wiring, if visible
Signature
Date

What this report covers

This list follows the electrical section of the InterNACHI Standards of Practice: the service drop and overhead conductors, service head and drip loops, mast and conduit, meter and base, service-entrance conductors, main disconnect, panelboards and over-current devices, grounding and bonding, a representative number of switches, fixtures and receptacles, AFCI and GFCI devices where testable, and the presence of smoke and carbon monoxide detectors.

The standards say to report deficiencies in service-entrance conductor insulation and clearances, unfilled panel openings, solid conductor aluminum branch wiring if readily visible, receptacles with no power, wrong polarity, missing covers, bad GFCIs, signs of arcing or heat, or no ground, and missing smoke or carbon monoxide detectors. They also say an inspector is not required to remove panel covers; a licensed electrician doing a deeper inspection works under the electrical code and the local inspector instead.

How to use it

For each item, mark it OK, Needs attention or Not inspected, and add a short note where it helps: what you saw, where, and what you recommend. "Not inspected" with a reason (no access, unsafe, snow cover) protects you better than leaving a line blank.

The sheet saves in this browser as you go. Print it, or save it as a PDF from the print window, and hand or send it to the customer. Photos make any report clearer; attach them to the job record or the email.

With Koira: Estimates from the inspection

Turn findings into a priced estimate before you leave. Koira drafts options from your photos and price list, and the customer signs and pays the deposit on one page.

Sources

Last checked October 9, 2026. This page is general information, not legal or tax advice. Rules change and differ by state and city, so confirm with the agency named before you act.

FAQ

What is checked in a home electrical inspection?

The service from the drop to the meter, the main disconnect and panel, breakers and fuses, grounding and bonding, a sample of switches, fixtures and receptacles, AFCI and GFCI devices, and smoke and carbon monoxide alarms.

Do inspectors open the electrical panel?

The InterNACHI home inspection standards do not require removing panel covers. A licensed electrician may go further under the electrical code.

What are common electrical defects?

The standards list unfilled panel openings, visible solid aluminum branch wiring, receptacles with no power or wrong polarity, bad GFCIs, signs of arcing or heat, and missing alarms.

Is this a code inspection?

No. A permit inspection is done by your local inspector against the electrical code your area has adopted.

We know what works. Leave it to Koira.

☼⚙
Standard⚡ Turbo
● Koira did it● You by hand
Today $9,300$8,100 / $1,200
This week $25,050$18,570 / $6,480
This month $69,300$46,150 / $23,150
Money, just now
Reminded Sean Love, $1,850. Polite reminder with the pay link.
Bids, 9:44 am
Nudged Dana on the kitchen bid. Day 3 follow up. She opened it at 9:12.
Convos, 9:41 am
Texted back a missed call. Walk through booked Thu 10:00.
Electrical Inspection Checklist: Printable Home Electrical Report | Koira