Free remodeling scope of work template

A remodeling scope of work for a kitchen or bathroom: demolition, framing, rough-ins by trade, finishes and allowances, who supplies what, and cleanup. Edit it to your project.

FreeNo email, no sign-up
6 sectionsWritten for remodeling
PDF, WordPrint or download
Your business
Logo
Kept in this browser for your next document. It is not uploaded.
Optional. Add it if your trade is licensed where you work.
Customer
Scope of work details
Wording
Section 1
Section 2
Section 3
Section 4
Section 5
Section 6
sections on this scope of work
6
Scope of work
Run this in Koira for freeKept in this browser only. Nothing you type here goes to Koira. The CSV opens in Google Sheets and Excel. In the print window, pick Save as PDF.
Your business name

Scope of work

CustomerCustomer name
Job and address
Kitchen remodel
Project
[Kitchen or bathroom] remodel at [address].
Work included
- Demolish and haul away [list] - Frame and prepare walls and floor as shown on the plan - Plumbing: [list rough-ins and fixture sets] - Electrical: [list circuits, lighting and devices] - Install cabinets, counters and tile - Finishes per allowances below - Pull permits and pass inspections - Dust protection and daily cleanup
Allowances
Tile [allowance], cabinets [allowance], counters [allowance], plumbing fixtures [allowance], lighting [allowance]. Choices above or below an allowance adjust the price by change order.
Not included
Work outside the [room], appliances unless listed, and repairs to conditions hidden behind walls, which will be priced before they are done.
Schedule
Start on [date]. About [weeks] weeks, depending on cabinet and counter lead times.
Acceptance
The work is complete when everything under Work included is done and the customer has walked it with us. Anything not listed is extra and is priced by change order before it starts.
Customer
Contractor
Date

What a remodeling scope of work is for

Remodels fail on allowances and assumptions. A scope that lists the work room by room and trade by trade, sets an allowance for each finish the customer has not chosen yet, and says who supplies fixtures, keeps the budget honest. When the customer picks a more expensive tile, the allowance shows the difference instead of an argument.

What to put in a remodeling scope of work

  • Demolition and disposal.
  • Framing and layout changes.
  • Plumbing, electrical and ventilation work by trade.
  • Finishes with allowances: tile, cabinets, counters, fixtures.
  • Who supplies each item, you or the customer.
  • Permit, inspections, protection and cleanup.

Items to settle in a remodeling scope

  • Allowance amounts for every finish not yet chosen.
  • Lead times for cabinets and counters.
  • What happens if rot or old wiring is found in demolition.
  • Where the customer will cook or bathe during the work.
  • Dust protection for the rest of the house.
  • Who orders and receives customer-supplied items.

How to fill it in

  1. Fill in the customer and the job.
  2. Edit the work included so it matches your estimate line by line.
  3. Name materials and who supplies them.
  4. List what is not included.
  5. Print it with the estimate, or download Word to attach to your contract.

Free tools for remodeling

The same scope of work for other trades: electrical, general contractor, hvac, landscaping, painting, plumbing, roofing.

More for remodelers: how remodelers run on Koira.

FAQ

What is an allowance in a remodeling contract?

A set amount for a finish the customer has not chosen yet, like tile or light fixtures. If they choose something that costs more or less, the price changes by that difference through a change order.

What should a kitchen remodel scope include?

Demolition, any layout changes, plumbing and electrical by item, cabinets, counters, tile, fixtures with allowances, who supplies what, permits, protection and cleanup.

How do I handle hidden damage in a remodel?

Write in the scope that hidden conditions found during demolition will be shown to the customer and priced as a change order before the work continues.

Should the scope include a schedule?

A start date and an estimate of weeks, with the things that can move it, such as cabinet lead times and inspections.

We know what works. Leave it to Koira.

☼⚙
Standard⚡ Turbo
● Koira did it● You by hand
Today $9,300$8,100 / $1,200
This week $25,050$18,570 / $6,480
This month $69,300$46,150 / $23,150
Money, just now
Reminded Sean Love, $1,850. Polite reminder with the pay link.
Bids, 9:44 am
Nudged Dana on the kitchen bid. Day 3 follow up. She opened it at 9:12.
Convos, 9:41 am
Texted back a missed call. Walk through booked Thu 10:00.
Free Remodeling Scope of Work Template | Koira