What this checklist covers
Most utilities require approval before a grid-tied system is turned on, so the closeout has two finish lines: the building inspection and the utility's approval. Record production readings at commissioning so the owner can compare later.
How to use it
Tick each item as you go. The sheet saves in this browser, so you can close the page and come back. Print a blank copy for the truck, or fill it in on your phone and print or save it as a PDF for the customer at the end.