Free construction submittal template

A submittal cover sheet that tells the architect, engineer or general contractor exactly what you are submitting, for which spec section, and when you need an answer.

FreeNo email, no sign-up
Works it outThe math is done as you type
PDF, Word, CSVPrint or download
Your business
Logo
Kept in this browser for your next document. It is not uploaded.
Submittal details
Items
Item 1
Item 2
Item 3
items on this submittal
3
Submittal
Run this in Koira for freeKept in this browser only. Nothing you type here goes to Koira. The CSV opens in Google Sheets and Excel. In the print window, pick Save as PDF.
Your business name

Submittal

Number
S-1
Review action
Not reviewed yet
ItemManufacturer and productWhat is attachedPages
Product dataManufacturer data sheet
Shop drawingsDrawings
SamplesPhysical samples
Total0
Submitted by
Reviewed by
Date

What a submittal is

Before you order or install, many projects require you to submit what you plan to use: product data, shop drawings, samples, test reports. The design team reviews it against the specs and returns it marked approved, approved as noted, revise and resubmit, or rejected.

What the cover sheet needs

  • The project, who it is going to and the submittal number.
  • The spec section it answers.
  • Each item with its manufacturer and product, and what is attached.
  • The date you need it back, given lead times.
  • Room for the reviewer's action and remarks.

Getting it back fast

  • One spec section per submittal.
  • Highlight the exact model and options on each data sheet.
  • Say plainly if anything differs from the spec, and why.
  • Give a real answer-by date based on the material's lead time.

More free templates

FAQ

What is a submittal in construction?

Documents or samples a contractor sends to the design team to show what will be installed, such as product data, shop drawings or samples, so they can confirm it meets the specs before it is ordered.

What does approved as noted mean?

The reviewer accepts the submittal with the corrections they marked. You can go ahead, but you must follow the notes. Revise and resubmit means fix it and send it back before going ahead.

Who reviews a submittal?

Usually the general contractor checks it first, then the architect or engineer reviews it against the design. The project's specs say who reviews what and how long they have.

Should I number submittals by spec section?

Many projects number them by spec section plus a sequence, such as the section number then 01, 02 for resubmittals. Follow the project's system if it has one.

We know what works. Leave it to Koira.

☼⚙
Standard⚡ Turbo
● Koira did it● You by hand
Today $9,300$8,100 / $1,200
This week $25,050$18,570 / $6,480
This month $69,300$46,150 / $23,150
Money, just now
Reminded Sean Love, $1,850. Polite reminder with the pay link.
Bids, 9:44 am
Nudged Dana on the kitchen bid. Day 3 follow up. She opened it at 9:12.
Convos, 9:41 am
Texted back a missed call. Walk through booked Thu 10:00.
Free Construction Submittal Template and Cover Sheet | Koira