Free construction bid template

Answer a set of plans with a bid that a general contractor or owner can compare line for line: the package, the lines, overhead and profit, what is in and what is out, and the addenda you priced.

FreeNo email, no sign-up
Works it outTotals as you type
PDF, Word, CSVPrint or download
Your business
Logo
Kept in this browser for your next document. It is not uploaded.
Optional. Add it if your trade is licensed where you work.
Bid to (owner or general contractor)
Bid details
Line items
DescriptionQtyUnitPrice
qty
$
qty
$
qty
$
qty
$
qty
$
%
Your own markup, added to the subtotal.
%
Leave at 0 if your work is not taxed where you are.
$
Bid total
$0.00
Bid
$0.00Subtotal
$0.00Tax
5Lines to price
Kept in this browser only. Nothing you type here goes to Koira unless you tap Customize and send. The CSV opens in Google Sheets and Excel. In the print window, pick Save as PDF.
Your business name

Bid

Number
B-1001
Bid to (owner or general contractor)Customer name
Addenda received
None
DescriptionQtyUnitPriceAmount
Labor1hour
Materials1each
Equipment rental1day
Supervision1day
Cleanup and disposal1each
Subtotal
$0.00
Bid total
$0.00
5 lines have no price yet
Inclusions, exclusions and terms
Includes: labor, materials and equipment for the work listed. Excludes: permits and fees unless listed, bonds, work by others. Bid based on the plans and addenda listed above.
Bidder
Date

A bid is an answer to the plans

A construction bid prices a defined scope, usually from drawings and specs someone else wrote. The person comparing bids wants to see that you priced the same thing as everyone else, so the most useful parts of a bid are often the scope lines, the addenda you saw and the exclusions.

What a bid should have

  • The project name and address, and who the bid is to.
  • The bid package or trade, by spec division if the project uses them.
  • The plans and addenda you priced.
  • Line items, or a lump sum with the lines behind it.
  • Overhead and profit, shown or folded in.
  • Inclusions, exclusions and assumptions.
  • How long the bid is good for and the duration of the work.

Overhead and profit

The template adds overhead and profit as a percentage on top of the subtotal. Use your own number from your books: overhead is what it costs to run the business for the year divided by the work you expect, and profit is on top of that. Our markup calculator and profit margin calculator show the difference between markup and margin, which trips up a lot of bids.

Exclusions win and lose bids

A low number with long exclusions may be the most expensive bid on the table once the gaps are filled. List what you did not price in plain words: permits, testing, temporary power, patching after other trades, after-hours work. If a scope gap is likely, price it as an alternate.

More free templates

  • Subcontractor Agreement: Scope, price, dates, retainage, insurance and payment.
  • Schedule of Values: Percent complete, balance and retainage worked out per line.
  • Submittal: Spec section, items, attachments, answer-by date and review action.
  • Material Take-off: Measured quantity, waste, order quantity and cost.
  • WIP Schedule: Percent complete, earned revenue and over or under billing.
  • Timesheet: Hours worked out per day, the week's total and hours over 40.
  • Expense Tracker: Every expense with its job and category, totalled.
  • Job Sheet: Times, tasks and parts, what was found and signatures.
  • Every template, including estimates, invoices and proposals for 35 trades.

FAQ

What is the difference between a bid and an estimate?

An estimate is usually your own scope for a customer. A bid answers someone else's plans and specs, often in competition with other contractors, and is compared line for line. The paperwork looks similar; the bid leans harder on inclusions, exclusions and addenda.

Should I show overhead and profit on a bid?

Some owners and general contractors ask for it, especially on public work and cost-plus jobs. Otherwise it is your choice. The template can show it as a line or you can set it to 0 and fold it into your prices.

What are addenda on a bid?

Changes to the plans or specs issued during bidding. List every addendum you received and priced. A bid that misses an addendum can be thrown out or leave you doing work you did not price.

How long should a construction bid be valid?

Long enough for the award to happen, short enough that material prices do not move under you. Say the date on the bid and, for long awards, how you will handle price changes.

What is a bid bond?

A bond some owners require with a bid, promising that you will sign the contract if awarded. It comes from a surety company, not from this template. Check the bid documents for what is required.

We know what works. Leave it to Koira.

☼⚙
Standard⚡ Turbo
● Koira did it● You by hand
Today $9,300$8,100 / $1,200
This week $25,050$18,570 / $6,480
This month $69,300$46,150 / $23,150
Money, just now
Reminded Sean Love, $1,850. Polite reminder with the pay link.
Bids, 9:44 am
Nudged Dana on the kitchen bid. Day 3 follow up. She opened it at 9:12.
Convos, 9:41 am
Texted back a missed call. Walk through booked Thu 10:00.
Free Construction Bid Template (PDF, Word and CSV) | Koira