What is step flashing on a roof?

Step flashing is a series of small L shaped metal pieces where a sloped roof meets a wall, such as a dormer side or a chimney. One piece goes in with each course of shingles, lapping the piece below, so water steps down the wall and out onto the roof instead of behind the siding.

What step flashing means

Step flashing is a run of small bent metal pieces woven in with each course of shingles where a sloped roof meets a sidewall. Each piece laps the one below it, so water steps down and out onto the roof.

Where it matters on a roofing job

Step flashing should be replaced on a full reroof, not reused, because old pieces are bent and nailed through. If the wall has siding, the upper leg goes behind it, which can mean pulling a course of siding. Price that labor in the bid instead of finding it on the roof.

What the model code says

  • Sidewall base flashing, continuous or step, must be at least 4 inches tall and 4 inches wide. (IRC 2021, Chapter 9)

Check which code edition your building department enforces for step flashing before you quote.

What it costs

The roof repair cost guide has the typical job at $1,100 and the usual range at $390 to $1,850. The guide shows its sources and what moves the price.

Work it out

Sources: 2021 International Residential Code, Chapter 9, Roof Assemblies (ICC). Checked October 9, 2026.

For roofersIf you do this work for a living, Koira handles the office side of it: quotes, invoices, booking, follow ups and your website, in one place.Quote and invoice roofing jobs

Step flashing questions

Where is step flashing used?

Anywhere a sloped roof runs into a wall along its slope: dormer sidewalls, the sides of a chimney, and a lower roof that meets a taller wall. Where the roof meets a wall along a level line, continuous apron flashing is used instead.

Can you reuse step flashing on a reroof?

It is better not to. Old pieces are bent and nailed through, and pulling the shingles damages them further. New step flashing costs little next to a leak behind the siding, so price it into every full reroof.

Does step flashing go behind the siding?

Yes. The upper leg of each piece goes behind the siding and the weather barrier. On a chimney or other masonry, counter flashing covers it instead. Pulling a course of siding to do it right belongs in the bid.

What is kick out flashing?

Kick out flashing is the bent piece at the bottom of a run of step flashing that turns water away from the wall and into the gutter. Without it, water runs down the wall behind the siding.

Built for roofers. Start with a free AI report.

☼⚙
Standard⚡ Turbo
● Koira did it● You by hand
Today $9,300$8,100 / $1,200
This week $25,050$18,570 / $6,480
This month $69,300$46,150 / $23,150
Money, just now
Reminded Sean Love, $1,850. Polite reminder with the pay link.
Bids, 9:44 am
Nudged Dana on the kitchen bid. Day 3 follow up. Dana opened it at 9:12.
Convos, 9:41 am
Texted back a missed call. Walk through booked Thu 10:00.