What is a cure schedule?

A cure schedule is the time a powder needs to spend at a set metal temperature in the oven to flow out and harden.

What cure schedule means

A cure schedule is the time a powder needs to spend at a set metal temperature in the oven to flow out and harden. The powder maker prints it on the product data sheet, and the clock starts when the part itself reaches that temperature, not when the oven does.

Also called cure time and temperature, bake schedule.

Where it matters on a powder coating job

Heavy parts like wheels, brackets and thick plate soak up heat and take much longer to come up to temperature than sheet metal, so they tie up the oven longer. Undercured parts chip and scratch at pickup, which is why batch and oven time belong in every quote.

Work it out

For powder coatersIf you do this work for a living, Koira handles the office side of it: quotes, invoices, booking, follow ups and your website, in one place.Quote and invoice powder coating jobs

Built for powder coaters. Start with a free AI report.

☼⚙
Standard⚡ Turbo
● Koira did it● You by hand
Today $9,300$8,100 / $1,200
This week $25,050$18,570 / $6,480
This month $69,300$46,150 / $23,150
Money, just now
Reminded Sean Love, $1,850. Polite reminder with the pay link.
Bids, 9:44 am
Nudged Dana on the kitchen bid. Day 3 follow up. Dana opened it at 9:12.
Convos, 9:41 am
Texted back a missed call. Walk through booked Thu 10:00.