What is as-built drawings?

As-built drawings are the plans marked up at the end of a job to show how things were actually built, including changes and the real location of pipes, wires and ducts.

What as-built drawings means

As-built drawings are the plans marked up at the end of a job to show how things were actually built, including changes and the real location of pipes, wires and ducts.

Also called record drawings, as-builts.

Where it matters on a general contracting job

Commercial clients often require them, and they are useful on any job for the next person who opens a wall. Mark up a set as you go; recreating it at the end is much harder.

Work it out

Built for general contractors. Start with a free AI report.

☼⚙
Standard⚡ Turbo
● Koira did it● You by hand
Today $9,300$8,100 / $1,200
This week $25,050$18,570 / $6,480
This month $69,300$46,150 / $23,150
Money, just now
Reminded Sean Love, $1,850. Polite reminder with the pay link.
Bids, 9:44 am
Nudged Dana on the kitchen bid. Day 3 follow up. She opened it at 9:12.
Convos, 9:41 am
Texted back a missed call. Walk through booked Thu 10:00.
What Is As-built drawings? General Contractor Term Explained | Koira